• Title/Summary/Keyword: 건설프로젝트

Search Result 1,261, Processing Time 0.025 seconds

Preliminary Analysis of the Bid Success Ratio according to the Characteristics of Overseas Construction Projects (해외건설 프로젝트 특성에 따른 입찰 성공률 분석에 관한 기초연구)

  • Kim, Seung-Won;Lee, Kang-Wook;Yu, Jung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.122-133
    • /
    • 2019
  • In the construction industry, bidding competitiveness is the most basic and important competence of the company. Bidding competitiveness comes from competitive advantage, but the strategy of the company to capture bidding competitiveness varies with the characteristics of the project. In particular, overseas construction is where uniqueness of the construction industry and the specificity of international business coexist. This study analyzes the bidding success ratio and the level of bidding difficulty by project characteristics with 12,952 overseas construction bidding cases. Consequently, it was found that the bidding success ratio of Middle East and North Africa (MENA) and civil engineering was the lowest in each group of project characteristics, and therefore the level of bidding difficulty is high, respectively. In addition, it was confirmed that the bidding success ratio of small size or short duration project was relatively high, and the bidding success ratio of both the negotiated bidding in the bidding method group and the private sector in the client type group was respectively high. However, Kruskal-Wallis test in contract type and period shows that there is no statistically significant difference in the bidding success ratio by group.

Management Research in Plant Construction;Introduction of research center (플랜트 프로젝트 관리체계 표준화 기술 개발;연구단 소개)

  • Lee, Young-Nam;Kim, Chan-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.213-220
    • /
    • 2006
  • Plant construction industry is a high value-adding industry because it is complex industry comprising engineering, procurements of equipments and construction. So, Revenue increase in overseas plant projects would boost up not only domestic construction industry but also growth of national economy. Recently, overseas plant-construction market is expanding dramatically. For instant, Middle-east countries are constantly increasing their orders for the construction of petro-chemical plants stimulated by sky-rocketing oil prices. The purpose of this research is to develop management techniques for plant projects such as work break-down structure, knowledge management system, logistics & procurement system, and risk assessment tools. We believe our research would contribute to the competion of Korean engineeing companies and contractors in overseas plant-construction market.

  • PDF

A Study on the effect of Knowledge Sharing and Utilization among Project Participants on Organizational Commitment and Cooperation and Project Performance (프로젝트사업 참여자 간 지식공유·활용이 조직몰입 및 협력과 프로젝트성과에 미치는 영향에 관한 연구)

  • Won-hee lee
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2023.01a
    • /
    • pp.211-212
    • /
    • 2023
  • 본 연구는 건설산업 현장 프로젝트조직의 프로젝트사업 참여자 간 지식공유·활용이 조직몰입 및 협력과 현장 프로젝트 성과에 어떠한 영향을 주는지를 살펴보고자 하는 실증연구이다. 본 연구에서는 건설산업 현장 프로젝트조직의 특성을 분석하고자 본사 인력을 제외한 현장 프로젝트사업 참여자를 대상으로 분석하고자 한다. 이를 위해 본 연구에서는 구조방정식을 이용하여 현장 프로젝트사업 참여자 간 지식공유·활용이 조직몰입 및 협력과 프로젝트 성과에 어떠한 유의한 영향을 미치는지 실증분석을 통하여 알아보고자 한다.

  • PDF

A Study on the Effect of Mobile Cloud Computing Services Characteristics on the Intellectual Convergence and the Performance Expectancy in Construction Project: From the Perspective of the Social Capital (건설프로젝트에서 Mobile-Cloud Computing Service 특성이 정보융합과 기대성과에 미치는 영향에 관한 연구: 사회적 자본의 관점에서)

  • Kim, Youngwoo;Oh, Jay In
    • The Journal of Bigdata
    • /
    • v.4 no.1
    • /
    • pp.129-142
    • /
    • 2019
  • Construction projects have experienced many failures due to incomplete production environments. Thus, the purpose of this study is to use ICT resources leased during the construction period at the construction site and to introduce the Mobile Cloud Computing Service, which utilizes Cloud Computing Service and mobile devices such as smart phones, tablet PCs, and notebooks instead of physically wired communication networks. The characteristics of Mobile Cloud, such as rapid accuracy, shared collaboration, and ubiquity, will affect the social network among various construction site participants. we conducted empirical research on the introduction of Mobile Cloud to promote information exchange and convergence among the participants and mutual trust, ultimately improving the project performance.

  • PDF

Development of Construction Project Performance Management System(PPMS) Considering Project Characteristics (건설 프로젝트 리스크 관리 효율성 향상을 위한 성과측정시스템(PPMS) 개발)

  • Cha, Hee-Sung;Kim, Ki-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.82-90
    • /
    • 2013
  • In the construction industry, there are so many qualitative factors affecting the performance of a project. So it is crucial to measure the factors in an effective way in order to analyze the interrelationship among the various factors. To improve the performance level of a project, it is also important to identify the most appropriate management practices which are inter-linked with the subject project. The purpose of this study is to develop a project performance management system (PPMS) to quantitatively analyze the variety of project performance data and identify the best management practice to increase the potential level of a particular performance area. Using a comparative statistical method, this study developed a quantification method and web-based computerized system to enhance the usage of the system. The system, however, is still under the validation stage because of the shortage of data set. In the future, when more and more completed project data are stored in the system, the system would play a crucial role in predicting the performance level and matching the best management practice for a subject project. In addition, the system can also be modified as a tool for a business- or industry-level system by incorporating the existing enterprise resource programs.

Management Structure Improvement by Construction Management in The Project Financing Development Projects (프로젝트파이낸싱 기반 수익형개발사업에 CM적용을 통한 관리구조 개선방안)

  • Lee Eun-Suk;Kim Yang-Hyun;Jung Yong-Chan;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.250-253
    • /
    • 2003
  • Many construction companies have been trying to extend their businesses to the development projects after IMF. Project financing was introduced to the construction market and has been popular with construction companies which can not furnish funds for project by themselves. But, there are so many problems that project financing has not been activated in the construction field. One of the main factors that disturb activation of project financing is distrust about construction management among participants. This distrust is caused by the lack of speciality, objectivity, clearness about CM. So, to process business successfully, they need specialty and objectivity for the construction management. In this research, I analyzed the role and duty of the main participants about CM in the development project ana suggested an advanced management structure in order to activate project financing in the development projects.

  • PDF

A study on the effect of field project organization control among participants on cooperation and project performance (현장프로젝트조직의 참여자간 통제가 협력 및 프로젝트 성과에 미치는 영향에 관한 연구)

  • lee, Won-hee;Moon, Jae-Young
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2020.07a
    • /
    • pp.189-190
    • /
    • 2020
  • 본 연구는 국내 건설 산업에서 현장프로젝트조직 사업 참여자를 대상으로 프로젝트 참여자간 간 통제유형에 따라 협력과 프로젝트 성과에 어떠한 영향을 주는지를 살펴보고자 하는 실증연구이다. 본 연구에서는 통제 구분을(산출통제(Output Control), 과정통제(Process Control), 사회통제(Social Control))의 통제 유형에 따라 현장프로젝트 참여자간 협력과 현장프로젝트성과에 어떠한 유의한 영향을 미치며 또한, 국내 건설산업에서 현장프로젝트조직의 특징을 실증분석을 통하여 알아보고자 한다.

  • PDF

UAV-based Construction Site Monitoring and Analysis System Development for Civil Engineering Management (토목현장에서의 무인비행장치 기반 현장정보 취득 및 분석 시스템 개발)

  • Kim, Changyoon;Youn, Junhee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.4
    • /
    • pp.549-557
    • /
    • 2022
  • Due to harsh conditions of construction site, understanding of current feature of terrain and other infrastructures is critical issue for site managers. However, because of difficulties in acquiring the geographical information of the construction sites such as large sites and limited capability of construction workers, comprehensive site investigation of current feature of construction site is not an easy task for construction managers. To address these circumstances of construction sites, this study deduce difficulties and applicabilities of unmanned aerial vehicle in the area of construction site management. To confirm applicability of UAV in civil construction project, case study have been conducted on the road construction project. The result of case study proved that the developed system is one of promising technologies that has been studied in construction site management. To improve applicability of UAV for construction and process management information, law and technical issues will be an important area of future study.

Analysis of ABC Success Factors Affecting Construction Project Performance (건설프로젝트 성과에 영향을 미치는 ABC 성공요인 분석)

  • Shin, Young-Su;Cho, jin-Ho;Kim, Byung-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.3
    • /
    • pp.56-65
    • /
    • 2022
  • This study tried to identify the key success factors of ABC by identifying the influence of ABC's success factors on project performance and analyzing the moderating effect of communication. For this purpose, factors applicable to construction projects were extracted through case studies related to the success factors of ABC, an activity-based financial management technique. The survey method was conducted as an online survey method using the Delphi method. For statistical analysis, frequency analysis and factor analysis were performed with SPSS Statistic 20, and hypothesis testing was performed with SmartPLS 2.0. As a result of the analysis, it was found that linkage with quality initiatives affects not only ABC's success factors on project performance, but also communication moderation effects. It was confirmed that linkage and communication with quality initiatives are the most important key success factors for ABC's success. Based on the results of this study, it is expected that if ABC and quality management are well linked, it will be effective in improving project performance.

Analyzing the Relationship between Dynamic Capability of Project-Based Organization and the Competitive Advantage in the E&C Companies (프로젝트 조직의 동적역량과 건설기업 경쟁우위와의 상관관계 분석)

  • Jin, Sangjoon;Oh, Minjeong;Kim, Seungchul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.73-85
    • /
    • 2019
  • Since the beginning of a new century, many Korean construction and engineering companies are facing a very dynamic and fast changing business environment which includes severe competition, higher risk, economic depression, declining revenues and profits, etc. In order to cope with these challenges, they need to secure special capabilities to actively adapt to the paradigm changes. One of those capabilities could be project management capability which allows us to manage organizational resources dynamically and integratively based on project portfolio management concept. The objective of this study is to investigate how the dynamic capability of a project-based organization to control the resource affects the firm performance and the competitive advantages. Data was collected from the construction and engineering companies in South Korea by using survey questionnaire, and analyzed for empirical tests by using statistical methods such as structural equation modelling and path analysis. The results showed that the organizational resources, if they had the VRIN characteristics, would have positive impacts on creating the dynamic capabilities for project organization. In turn, the dynamic capabilities of a project organization would have impacts on improving business performance and creating competitive advantages. Also, it was found that the organizational resources may have direct impact on business performance and competitive advantages. The academic contribution of this study is that it attempts to integrate resource based view and the dynamic capability theory about creating competitive advantages for project based organization. This study also provided practical implications to the companies in construction industry by showing how to use organizational resources strategically to create competitive advantages.