• Title/Summary/Keyword: 건설프로젝트성과

Search Result 230, Processing Time 0.024 seconds

Developing Measurement System for Key Performance Indicators on Building Construction Projects (건설 프로젝트 효율적 성과관리를 위한 핵심 지표 체계 구축)

  • Cha, Hee-Sung;Kim, Tae-Kyoung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.120-130
    • /
    • 2008
  • In construction industry, project performance should be evaluated in terms of project value objectives, i.e., cost, time, quality, safety, and environment. However, there have been few, if any, systematic approaches in assessing comprehensive performance level which encompasses the whole spectrum of project value objectives. It is non trivial to establish the standardized performance metric system due to the project individualities. This study provides a new approach in assessing the wide variety of project performance types by collecting the real industry project data. In addition, the proposed system has been validated through industry survey on project practitioners. It is concluded that the developed quantitative project performance measurement system would be effectively useful in indicating the level of current status of a particular project and furthermore, to provide a meaningful strategy for the future project in a more sustainable way.

A Study of the Effect of PMC and Human Resource Competency on Construction Project Performance Outcomes (PMC (Project Management Consultant)와 인적자원역량이 건설프로젝트성과에 미치는 영향에 관한 연구)

  • Lee, Heonchang;Lee, Jeongryun;Ahn, Byeonghoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.5
    • /
    • pp.701-710
    • /
    • 2022
  • This study aims to prove the importance and necessity of a project management consultancy (PMC) that systematically manages construction projects to ensure their successful implementation. In order to analyze the interrelationship between the role of PMC and the outcome of the construction projects, structural equation modelling(SEM) was conducted. Hence, one of the critical aspects when conducting the project, human resource competency, especially referring to the competency of project team members and the project manager's leadership, affects the performance of construction projects. As a result of this study, PMC is found to have significant effects on human resource competency and construction project performance. In addition,human resource competency also had a significant effect on construction project performance. Consequently, the research outcomes suggest that introducing PMC services should be done when implementing large domestic infrastructure projects successfully, as doing so will enhance PM leadership and strengthen the capacity of the project team members.

A Development of Project Performance Predicting System(PPS) considering Construction Project Characteristics (건축 프로젝트의 특성을 고려한 성과 난이도 예측 시스템 개발)

  • Ko, Young-Jin;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.62-72
    • /
    • 2011
  • Currently, The failure of construction project is increasing to be caused by a changing construction environment. According to this circumstances, Researches of project success factors affecting performance have been presented to develop strategies for efficient construction project management in the construction industry. However, Conducting efficient construction project management is difficult because project manager could not know which project success factors can be improved or not. Especially, although the project characteristics were derived the level of difficulty for performance, research of the project characteristics which could not be improved as influence factor to performance is lacking. Therefore, This paper has developed the Performance Predicting System(PPS) with Fuzzy set theory to establish. PPS has been developed to establish efficient project management strategies and to save time and effort. As Contractor inputs the project characteristics, PPS can predict the level of difficulty of performance.

Selecting Optimum Management Practices according to Project Characteristics for Improving Project Performance (건설 프로젝트 특성에 따른 성과 제고가 가능한 최적 공사 관리기법 선정 방안)

  • Ko, Young-Jin;Cha, Hee-Sung;Shin, Dong-Woo;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.3-13
    • /
    • 2012
  • The importance of project performance management as an alternative for solving problems is rising, which are followed by the hardships of managing construction project in the construction industry. This research classifies and applies the improvements made by the operator's work, in order to apply factors of success on the construction project, as performance management factors. In addition, in order to predict the results reflecting the project characteristic of performance management factor un-improvable by the operator in the initial stage of construction, the effect of project characteristic to the performance was drawn by performance difficulty. Also, in order to improve the predicted performance, researches on setting valid best practices according to the performance territory through a correlation analysis between the best practices improvable through the operator's work, and the performance was made.

A Study of Project Characteristics and Project Performance Level of difficulty (건설 프로젝트 특성과 프로젝트 성과 난이도 도출에 관한 연구)

  • Cho, Young-Seon;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.6
    • /
    • pp.78-88
    • /
    • 2010
  • Since the larger and complex construction projects are performed, project performance measurement is highlighting the importance to eliminate inefficiencies and plan to reasonable management practices. So many researchers are conducting research about the project critical sucess factor. But, these factors are mixed both management practices to improve performance and native project characteristics. Therefore performance measurement data couldn't apply to another project successfully. And the project characteristics affect project performance. But contractor couldn't change characteristics. This study provides a project characteristics's definition and classification. This study provides a quantitative level of performance improvement difficulty through out project manager survey. The contractor can estimate a level of performance difficulty through initial project information. With this, project contractor can more efficiently manage project.

Development of Construction Project Performance Management System(PPMS) Considering Project Characteristics (건설 프로젝트 리스크 관리 효율성 향상을 위한 성과측정시스템(PPMS) 개발)

  • Cha, Hee-Sung;Kim, Ki-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.82-90
    • /
    • 2013
  • In the construction industry, there are so many qualitative factors affecting the performance of a project. So it is crucial to measure the factors in an effective way in order to analyze the interrelationship among the various factors. To improve the performance level of a project, it is also important to identify the most appropriate management practices which are inter-linked with the subject project. The purpose of this study is to develop a project performance management system (PPMS) to quantitatively analyze the variety of project performance data and identify the best management practice to increase the potential level of a particular performance area. Using a comparative statistical method, this study developed a quantification method and web-based computerized system to enhance the usage of the system. The system, however, is still under the validation stage because of the shortage of data set. In the future, when more and more completed project data are stored in the system, the system would play a crucial role in predicting the performance level and matching the best management practice for a subject project. In addition, the system can also be modified as a tool for a business- or industry-level system by incorporating the existing enterprise resource programs.

Development of Performance Analysis System for Construction Projects Using Data Warehousing Technology (데이터 웨어하우스 기술을 활용한 건설프로젝트 성과분석 시스템 개발)

  • Yu Jung-Ho;Song Sang-Hoon;You Won-Hee;Lee Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.89-98
    • /
    • 2005
  • Recently the construction industry in Korea is facing problems such as low productivity, contraction of the domestic construction market, growing competition, and so on. To enhance the competitiveness continuously through efficiency in this business environments, construction companies need to make efforts to measure and accumulate performance data based on the strategic factors. When analysing performance of construction projects, the unique characteristics of each project should be considered properly, by which the managers can identify current status of project in various perspectives. This study proposes the performance analysis system using the concepts of balanced scorecard and data warehouse technology. The suggested system provides the management with the flexibility in analyzing performance data by applying the pre-defined key performance indicators and the function of multi-dimensional analysis.

A study on the Project Performance Measurement Baseline for Clients (발주자를 위한 프로젝트 성과측정기준선 설정 방안에 관한 연구)

  • Ko, Dae-Jun;Choi, Eun-A;Park, Dong-Jin;Lee, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.513-516
    • /
    • 2008
  • The risk in the constructions projects is extremely diverse because there are too many indefinite factors. Therefore, Performance Measurement Baseline(PMB) is needed regularly during the construction process. However, nowdays, the PMB in the constructions projects is for contractors' PMB and Performance Management(PM). Clients have a lot of difficulties to control and manage the projects. Therefore, this paper classifies schedule and cost data of the public apartments houses which is a actual cases into types and then conducts regression analysis and deduces a regression. In addition to this paper establishes the Work Breakdown Structure(WBS) and suggests the PMB for the clients through using that.

  • PDF

A Study on the Influence of Control Type on Tie Strength and Project Performance - Focusing on construction industry field project organization (통제유형이 유대강도 및 프로젝트 성과에 미치는 영향에 관한 연구 - 건설산업 현장프로젝트조직 중심으로)

  • lee, Won-hee
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2021.01a
    • /
    • pp.127-128
    • /
    • 2021
  • 본 연구는 국내 건설산업의 현장프로젝트조직 사업 참여자를 대상으로 프로젝트 참여자간 간 통제유형에 따라 유대 강도와 현장프로젝트 성과에 어떠한 영향을 주는지를 살펴보고자 하는 실증연구이다. 본 연구에서는 통제를 산출통제(Output Control), 과정통제(Process Control), 사회통제(Social Control)로 구분하여 통제유형에 따라 현장프로젝트 참여자 간 유대 강도와 현장프로젝트성과에 어떠한 유의한 영향을 미치며 또한 한국 건설산업의 현장프로젝트조직만이 가지는 특징을 실증분석을 통하여 알아보고자 한다.

  • PDF

A Study on the effect of Knowledge Sharing and Utilization among Project Participants on Organizational Commitment and Cooperation and Project Performance (프로젝트사업 참여자 간 지식공유·활용이 조직몰입 및 협력과 프로젝트성과에 미치는 영향에 관한 연구)

  • Won-hee lee
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2023.01a
    • /
    • pp.211-212
    • /
    • 2023
  • 본 연구는 건설산업 현장 프로젝트조직의 프로젝트사업 참여자 간 지식공유·활용이 조직몰입 및 협력과 현장 프로젝트 성과에 어떠한 영향을 주는지를 살펴보고자 하는 실증연구이다. 본 연구에서는 건설산업 현장 프로젝트조직의 특성을 분석하고자 본사 인력을 제외한 현장 프로젝트사업 참여자를 대상으로 분석하고자 한다. 이를 위해 본 연구에서는 구조방정식을 이용하여 현장 프로젝트사업 참여자 간 지식공유·활용이 조직몰입 및 협력과 프로젝트 성과에 어떠한 유의한 영향을 미치는지 실증분석을 통하여 알아보고자 한다.

  • PDF