An Analysis on the Propriety of Labor Input at Design Stage in Construction Management (건설사업 관리에 있어서 설계이전단계의 인력투입 적정성 분석)

  • An, Yang-Hoan;Kim, Young-Ai;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.32-41
    • /
    • 2009
  • In the execution of construction management, such pre-design steps as a planning stage, a basic design stage, and a work design stage are regarded as more important than an actual construction stage. However, the manpower input criterion from the aspect of construction management price standard in the Construction Engineering Management Law does not attach weight to the pre-design stage. In this regard, the aim of this study was to examine the propriety of manpower input in the pre-design stage of construction management and then present an improvement strategy of it. For this, the investigator examined the criterion of service price prescribed in the Construction Engineering Management Law and then comparatively analyzed four sites of construction management services. Study findings are as follows: 1) the actual state of manpower input based on the stepwise average price criterion of construction management service is presented with such steps as the newly established planning step (6.6%), the basic design stage (3.9%$\rightarrow$5.6%), the practical design stage(7.6%$\rightarrow$13.5%), the construction stage (88.5%$\rightarrow$64.0%), and the newly established maintenance stage (10.3%). The average price criterion is classified by total construction expenses and calculated by improved rates and stage; and 2) the three-step criterion of the Construction Engineering Management Law is classified into five stages including the planning stage and the maintenance stage by dividing it with the stepwise construction businesses. Study findings show that the calculation of price criterion in the actual site of construction management services must be operated in a practical and flexible manner and the systematic improvement of stepwise manpower input must be carried out actually.

Proposal for Improvement on the Task of Construction Project Management Service(CM) for the Customized Service Project of the Public Procurement Service (조달청 맞춤형서비스 사업에 대한 '감독 권한대행 등 건설사업관리용역(CM)' 과업내용 개선방향)

  • Lee, Jong-Tae;Yun, Hyun-Do
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.3
    • /
    • pp.3-11
    • /
    • 2021
  • The construction project manager must clearly carry out the activities of each construction stage specified in the 'Task Description'. In this study, 'design change' and 'completion process' were classified as core tasks in consideration of the frequency and importance of tasks. And, by analyzing the actual construction project, the task contents for the core work were standardized. This laid the foundation for the ordering office, construction project management technicians, and builders to clearly understand the business areas of construction project management and fulfill their responsibilities for their respective tasks.

협회 탐방/본회 - 협회의 사업집행 및 행정업무를 담당하는 대한설비건설협회 기획관리실

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.233
    • /
    • pp.41-43
    • /
    • 2009
  • 본지는 지난 2008년 5월호부터 서울특별시회를 시작으로 2009년 10월호에 제주특별자치도회까지 13개 시 도회 사무처를 게재함으로써 대한설비건설협회 시 도회의 사업추진 및 업무현황에 대한 회원사의 이해를 도왔다. 이번 호부터는 전국 13개 시 도회를 대표하여 설비건설업계의 발전 및 위상강화, 회원사의 권익 보호 등을 추진하고 있는 본회에 대하여 소개한다. 본회는 건설진흥사업 외에 기술 가스진흥사업, 회원봉사 및 조사사업, 정보화 사업, 기획 관리사업, 홍보사업 등 다양한 사업활동을 함으로써 설비건설업계 발전에 견인차 역할을 담당하고 있다. 이번호는 협회의 사업집행 및 행정업무 등 협회 운영의 포괄적인 업무를 담당하고 있는 기획관리실을 게재한다.

  • PDF

Extraction of the Key Performance Indicators of Construction Management Using Balanced Score Card (균형성과표를 활용한 건설사업관리의 핵심성과지표 도출)

  • Lim, Wooseok;Jung, Jihyun;Lee, Hakki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.6
    • /
    • pp.22-30
    • /
    • 2015
  • Enterprises should set up realizable goals and continually control the goals from apprehending whether they can be realized or not so that the enterprises grow consistently. Furthermore, from supplementing parts to be improved, goals are reset and the result should be controlled in order to fit to them. Lately, a lot of discussions about the results of organizations, projects, and companies are being realized in construction field. Particularly, in construction management, effective and professional control activities throughout the life cycle of facilities as well as the stage of business implementation of construction work are needed. About the result measurement of the construction management, lots of most domestic researches stay in the level of establishing basic concepts. Also, since characteristics of the construction field and the construction management were not reflected properly, it is in a situation that the result control system is not applied to on-site real works. Hence, this study intends to suggest fundamental data for measuring objective results from extracting result areas and key performance indicators of the construction management using Balanced Score Card.

Improvement of estimating method for construction management service fee by case study (사례분석을 통한 건설사업관리 대가산정 방법 개선)

  • Lee, Ung-Kyun;Yoo, Wi-Sung;Kim, Dong-In;Kim, Tae-Hoon;Cha, Min-Soo;Cho, Hun-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.16-24
    • /
    • 2012
  • The objective of this paper is to suggest the improvement of estimating system for construction management (CM) service fee through the analysis of the previous literatures and criteria and case study. In order to do this, this paper considered the relevance of existing criteria to estimate the CM service fee, the condition of input ratio of engineering resources in the real cases, and current utilization strategy of nonresident technical engineers. Based on the analysis, the following problems were identified; a) the different estimating system for CM fee and construction supervision fee, b) impractical estimating system for the CM fee, and c) inappropriate allocation of human resources for CM. Consequently, this paper suggested the following 4 items for the improvement of the existing system; (1) modification of the current structure of CM fee calculation, (2) rationalization of current level of the CM fee which is required to be raised approximately 5.4 percent compared to design or supervision fee, (3) securement of elasticity of the input ratio of engineering resources from the inception phase, and (4) development of the utilization strategy of nonresident engineers based on the technical requirement of the jobsite. Thus, it is anticipated that this research would affect the compensation package of CM in order to make the estimation process of CM service fee more efficient and to revitalize CM as business.

A Study on the Status and Future Development of Construction Management of Jeonju World Cup Stadium (전주월드컵경기장의 건설사업관리 추진현황과 발전방향에 관한 연구)

  • In Chi-Sung;Jung Soon-Gil;Kim Tae-Sam;Kim Geun-Woo;Do Sang-Yeek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.73-80
    • /
    • 2001
  • Generally, construction management is classified into two categories in the construction industry; CM for fee and CM at risk, most project is executed by the construction supervision including construction management in CM for fee field in Korea. The division of work scope is complicated among construction manager(CMr) and difficult to implement the construction management efficiently by CMr. in this case. Therefore, it is desired to apply the specialized Project Management Information System(PMIS) systematically include construction management procedure. We propose the future development of construction management on construction site based on the analyzed problem with PMIS and guideline and CM concept on construction site, composition of CM procedure through this Jeonju World Cup Stadium CM project.

  • PDF

A Case Study on the Prevention of Construction Delays Using the Delay Management Index in Program Level Construction Projects (프로그램 수준 건설사업에서 지연관리지수(Delay Management Index)를 활용한 공사지연 예방 사례연구)

  • Yu, Jun-Hyeok;Kim, Ok-Kyue
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.4
    • /
    • pp.347-359
    • /
    • 2021
  • Recently, construction projects have emerged in the form of program management, which is complicated by the large-scale of construction, and requires astronomical construction costs. In particular, projects that absolutely require management at the program level, such as large-scale construction projects, require overall control of the planned schedule and cost as a set of various projects, including infrastructure. But in Korea, there is no specific management standard for delays in construction. In order to avoid the risk of cost increase and project delay in the program-level construction project, it is necessary to apply more systematic management standards to prevent delay and to take a more preemptive response in the construction process. Therefore, in this study, a delay management index (DMI) was developed to successfully carry out large-scale construction projects at the program level and prevent delays in advance. In addition, case studies were conducted for large-scale construction projects, and a delay prevention system was established for program-level construction projects.

Improvements on the Total Project Cost Management System for SOC Projects (SOC건설사업의 총사업비 관리체계 개선방안)

  • Kim, Young-Jae;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.105-114
    • /
    • 2010
  • As the Korean economy went into a recession because of the global financial crisis in 2008, in order to vitalize the Korean economy, the government raised SOC budget and made its execution earlier. To prevent increases in budget for the government financial investment projects, the government controlled the project cost of SOC construction projects by enacting 'Guideline for total project cost management' in 1994 and complementing the relevant system. However, different from government intention, the total project cost of SOC projects were increased drastically. Hence, the government authorities and research institutions insisted the necessity of supplementation and improvement for the total project cost management system. This research is to provide the improvement for the total project cost management system of domestic SOC projects. In this research, As-Is Model was adjusted considering status of the total project cost management in the current SOC projects. Also the cost management of construction projects between domestic and other developed countries was studied, analyzed and compared. Based on the above, problems related to total project cost management of domestic SOC projects were found out and an improved total project cost management was provided to improve these problems.