Browse > Article
http://dx.doi.org/10.6106/KJCEM.2015.16.6.022

Extraction of the Key Performance Indicators of Construction Management Using Balanced Score Card  

Lim, Wooseok (Department of Architectural Engineering, Donga University)
Jung, Jihyun (Department of Architectural Engineering, Donga University)
Lee, Hakki (Department of Architectural Engineering, Donga University)
Publication Information
Korean Journal of Construction Engineering and Management / v.16, no.6, 2015 , pp. 22-30 More about this Journal
Abstract
Enterprises should set up realizable goals and continually control the goals from apprehending whether they can be realized or not so that the enterprises grow consistently. Furthermore, from supplementing parts to be improved, goals are reset and the result should be controlled in order to fit to them. Lately, a lot of discussions about the results of organizations, projects, and companies are being realized in construction field. Particularly, in construction management, effective and professional control activities throughout the life cycle of facilities as well as the stage of business implementation of construction work are needed. About the result measurement of the construction management, lots of most domestic researches stay in the level of establishing basic concepts. Also, since characteristics of the construction field and the construction management were not reflected properly, it is in a situation that the result control system is not applied to on-site real works. Hence, this study intends to suggest fundamental data for measuring objective results from extracting result areas and key performance indicators of the construction management using Balanced Score Card.
Keywords
Balanced Score Card; Key Performance Indicators; CM;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 Ahn, E. J. (2009). A suggest on the need of measuring the performance of a construction management project integrated viewpoints of project participants: focusing on owner, construction manager, designer and constructor, Master's Thesis, Hanyang University.
2 Go, D. J. (2009). A study on the prediction model of perfomance measurement in pre-construction phase for clients : focused on apartment house, Master's Thesis, Dong-EUI University.
3 Go, Y, J. (2011). Selecting Optimum Management Methods in Pre-Construction Phase considering Project Characteristics - Focused on Improving Project Performance-, Master's Thesis, A-Jou University.
4 Shin, D, H, and Kim, S, B. (2010). A study on the Institutional Improvement for Invigorating Performance Management System of the Construction Industry, Korean Journal of Construction Engineering and Management, Proceedings of KICEM Annual Conference, pp, 169-170
5 Kim, S. D. (2013). An empirical study on critical factors affecting the performance of Korean construction firms based on BSC perspective, Doctorate Thesis, Soongsil University.
6 Kim, Y. S. (2010). The performance analysis on private sector construction management services in Korean market, Doctorate Thesis, Hanyang University.
7 Ko, S. K., Kim, J. J., Back, J. K., and Kim, D. H. (2001). Strategic Performance Measurement of Knowledge Management in Construction Industry, Korean Journal of Construction Engineering and Management, KICEM, 2(3), pp. 45-57
8 Yoo, I. H., Kim, K. R,. Jung, Y. S., and Chin, S. Y. (2005). Key Performance Indicators for Developing Construction Performance Index, Journal of Architectural Institute of Korea, 21(2).