Browse > Article
http://dx.doi.org/10.6106/KJCEM.2021.22.3.003

Proposal for Improvement on the Task of Construction Project Management Service(CM) for the Customized Service Project of the Public Procurement Service  

Lee, Jong-Tae (Department of Architectural Engineering, Chungnam National University)
Yun, Hyun-Do (Department of Architectural Engineering, Chungnam National University)
Publication Information
Korean Journal of Construction Engineering and Management / v.22, no.3, 2021 , pp. 3-11 More about this Journal
Abstract
The construction project manager must clearly carry out the activities of each construction stage specified in the 'Task Description'. In this study, 'design change' and 'completion process' were classified as core tasks in consideration of the frequency and importance of tasks. And, by analyzing the actual construction project, the task contents for the core work were standardized. This laid the foundation for the ordering office, construction project management technicians, and builders to clearly understand the business areas of construction project management and fulfill their responsibilities for their respective tasks.
Keywords
Public Works; Construction Project Management Service; Content of the Task;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 Song, S.M., Seo, J.H,, Lee, C.H., Kim, Y.S., and Cho, H.H. (2011). "A Deduction of Key Work for Service Guide of Construction Project Manager." Journal of the Korea Construction Management Association, Korea Construction Management Association, 12(4), pp. 11-19.
2 Cho, H.H. (2009). "Establishment of Construction Project Management Business Model and Realization of Costs." Construction Management Technology and Trend, Korea Construction Management Association, pp. 321-325.
3 Jeon, Y.J. (2006). "Development of CM Checklist for Each Construction Project Using AHP Technique." Proceedings of the Korea Construction Management Association Conference, Korea Construction Management Association, pp. 342-346.
4 Kim, G.N. (2003). "A Study on the Role of Construction Project Management in Domestic Design and Construction Contracts." Master's Degree, Graduate School of Urban Science, University of Seoul.
5 Lee, C.H. (2004). "Analyzing the Problems of Introducing the Domestic CM System and the Effect on Construction Technology." Master's Degree, Chungnam National University.
6 Lee, J.T. (2015). "A Study of Improvement Plan for CM Service's Instructions in Respond to Changing Construction Industry Environment." Master's Degree, Chungnam National University.
7 Ministry of Land, Infrastructure and Transport Notification No. 2020-306 (Mar. 31, 2020), Construction project management method review standards and business performance guidelines.
8 Park, J.H. (2007). "Proposal of domestic CM application through CM analysis of AIA and CMAA." Journal of the Korean Institute of Architectural Construction, Korean Institute of Architectural Construction, 7(4), pp. 83-91.   DOI
9 Ryu, W.S. (2003). "A Direction for Improving Public Construction Project Management through Analysis of Domestic CM Cases." Journal of the Architectural Institute of Korea, Korean Institute of Architecture, 19(1), pp. 153-160.
10 Yoon, B.S. (2007). "Analysis of CM status through CM performance evaluation results." Proceedings of the National University Student Conference, Korea Construction Management Association, pp. 153-156.
11 Na, G.T. (2002). "A Study on the Improvement (Proposal) of Domestic Construction Project Management Guidelines." Journal of the Korean Institute of Architectural Construction, Korean Institute of Architectural Construction, 2(3), pp. 147-154.