Browse > Article
http://dx.doi.org/10.6106/KJCEM.2012.13.4.016

Improvement of estimating method for construction management service fee by case study  

Lee, Ung-Kyun (고려대학교 BK21건설글로벌리더양성사업단)
Yoo, Wi-Sung (한국건설산업연구원)
Kim, Dong-In (고려대학교 건축사회환경공학과)
Kim, Tae-Hoon (고려대학교 건축사회환경공학과)
Cha, Min-Soo (고려대학교 건축사회환경공학과)
Cho, Hun-Hee (고려대학교 건축사회환경공학과)
Publication Information
Korean Journal of Construction Engineering and Management / v.13, no.4, 2012 , pp. 16-24 More about this Journal
Abstract
The objective of this paper is to suggest the improvement of estimating system for construction management (CM) service fee through the analysis of the previous literatures and criteria and case study. In order to do this, this paper considered the relevance of existing criteria to estimate the CM service fee, the condition of input ratio of engineering resources in the real cases, and current utilization strategy of nonresident technical engineers. Based on the analysis, the following problems were identified; a) the different estimating system for CM fee and construction supervision fee, b) impractical estimating system for the CM fee, and c) inappropriate allocation of human resources for CM. Consequently, this paper suggested the following 4 items for the improvement of the existing system; (1) modification of the current structure of CM fee calculation, (2) rationalization of current level of the CM fee which is required to be raised approximately 5.4 percent compared to design or supervision fee, (3) securement of elasticity of the input ratio of engineering resources from the inception phase, and (4) development of the utilization strategy of nonresident engineers based on the technical requirement of the jobsite. Thus, it is anticipated that this research would affect the compensation package of CM in order to make the estimation process of CM service fee more efficient and to revitalize CM as business.
Keywords
Construction Management; Construction Management Fee; Compensation package; Estimation of CM service fee;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 국토해양부(2009). "건설사업관리대가기준 제2009-778호"
2 국토해양부(2009). "설계감리대가기준 제2009-711호"
3 국토해양부(2009). "건설공사감리대가기준 제2009-769호"
4 김철웅.정영일.김양택.현창택(2002)," 설계VE 용역대가 산정방안에 관한 연구", 한국건설관리학회 논문집, 3(1), pp. 97-106.   과학기술학회마을
5 유병기.정찬영.김재준 (2006), "CM대가 산정방식의 문제점 분석에 관한 연구", 한국건설관리학회 논문집, 7(6), pp. 132-140.
6 한국건설관리학회 (2009). "건설사업관리 대가산정 방법 및 기준개선 연구"
7 한국건설관리학회 (2007). "건설사업관리 대가체계 개선방안 연구"
8 한국건설기술연구원(2002). "건설사업관리 발주체계 및 조달시스템개발 연구보고서"
9 한국엔지니어링진흥협회 (2008). "엔지니어링업체 임금실태조사결과 공표"
10 CMAA (2007). "2007 Comparison of construction management and program management costs"
11 Logistics Management Institute (1996). "A Survey of Construction Management Costs in 1995"