A Study on the Proper Methodology for Selecting Domestic Public Sector Construction Management Contracts (국내 공공부문 CM의 평가 및 낙찰자 선정방법 개선안 연구)

  • Lee Yong-Jun;Lee Hak-ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.296-299
    • /
    • 2002
  • Construction Management tends to create a formal procurement resulted from recent legislative procedures system in domestic construction industry. However, the fact that construction Manager(CMr) has been chosen, in practice, under a poor circumstance in selecting and discriminating specialty requires the more optimal procedures. Therefore, in this research, we analyze the existing shortcomings. the various procedures, influence factors, and the criteria to be considered in selecting and evaluating CMr. Also. this study suggests the improved method based on the facts above. To accomplish the construction project successfully, it is one of the advanced schemes to choose an adequate CMr needed to the project through the precision in the formation and application of the procedure as well as the suggested criterion in selecting CM.

  • PDF

CM at Risk Case Study on Guaranteed Maximum Price Contract - Focused on Cases for USA - (책임형 CM 발주방식의 최대공사비보증계약 사례연구 - 미국 공공발주 프로젝트 사례 중심 -)

  • Jeong, Jinhak;Han, Jonghoon;Lee, Joosung;Ahn, Yonghan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.22-30
    • /
    • 2019
  • The purpose of this study is to derive basic data of the Guaranteed Maximum Price(GMP) process and to present specimens that can be used at the time of execution of CM at Risk project in South Korea. CM at Risk project is issued in South Korea, but the actual data is lack. On the other hand, CM at Risk project is universalized and the market of the CM at Risk is steadily growing. Because of that, in this study, The United States cases was selected as a sample. GMP consists of CM's fee, CM contingency, project direct cost, project indirect cost, allowance. GMP negotiations are performed before the end of design completion, and after 3 rounds of estimation comparison, preliminary GMP is confirmed. GMP can be multiple contract and it is useful for Procurement of long lead materials and early construction. If the actual cost is lower than expected GMP, sharing of the saving is an option since the conflict of interests between the client and the contractor can occur.

A Study on the Improvement of Processes of Verification for Construction Firm's Records of Performance (건설공사 실적증명 프로세스 개선에 관한 연구)

  • Lee Hong-Jae;Cheon Bong-Gi;Kim Yea-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.369-372
    • /
    • 2001
  • The processes for verification of performance records in construction have many problems according to construction firm's participating in some of the processes. This study analyzed about current processes and provided improved processes with IDEF method. As the result of this study, it was found that 'As-Is' model has many repetition of activities and 'To-Be' model has three times more effective than 'As-Is' model has. The data modeling which is available for 'To-Be' model was also suggested.

  • PDF

법령과 고시(2) - 지방계약법령 개정

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.5 s.202
    • /
    • pp.56-60
    • /
    • 2007
  • 행자부가 지난 3월 27일 행정자치부 회계예규를 개정하고 국민연금·건강보험료 사후정산제 시행에 들어갔다. 행자부의 이같은 개정은 대한설비건설협회가 행정자치부장관에게 사회보험료 사후정산제도 도입에 따른 후속조치로 지방계약법령을 개정해 줄 것을 건의한 것이 받아들여진 것이다. 이로써 모든 지방자치단체 발주공사에서도 국민연금·건강보험료 사후정산제를 받을 수 있게 됐다. 지방계약법령의 신·구조문 대비표는 다음과 같다.

  • PDF

Railway tunnel ventilation system design (철도터널 환기설계의 기초)

  • 신현준;유지오
    • The Magazine of the Society of Air-Conditioning and Refrigerating Engineers of Korea
    • /
    • v.28 no.6
    • /
    • pp.463-475
    • /
    • 1999
  • 산업과 생활수준의 향상에 따라서 도로나 철도 등의 기간산업에 대한 고속화 및 대용량화가 요구되고 있다. 특히 철도에 있어서는 선형의 직선화 및 복선화계획이 진행되면서 터널건설이 증가하고 장대터널이 요구되고 있는 실정이다. 이에 따라 철도터널의 환기 및 방재 시스템의 설계기법에 관심이 고조되고 있으나 현재의 국내 철도 터널은 대부분 오래 전에 건설된 것이며 또한 환기설비를 요구할 만큼의 장대터널이 없기 때문에 이를 고려하지 않고 있다. 그래서 국내의 철도터널 환기설계 기술은 미약한 상태로 현재 발주되는 대부분의 공사를 외국의 용역사의 설계에 의존하고 있는 실정이다.

  • PDF

A Study on the Suggestion of Construction Contract Practice in the Public Project through the analysis of Construction Claims (건설클레임 사례분석을 통한 입찰 및 계약제도 개선에 대한 연구)

  • Cho Young-Jun;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.1 s.5
    • /
    • pp.78-87
    • /
    • 2001
  • Recently many construction claims related to the ommission and discrepancy of design document are alleged since 1998 and various dispute resolution methods are appeared. But many contractors alleged claims are not satisfied with the result because of not sufficiently reflecting construction practice. The purpose of this study is to analyze the liability of contract privity from the view point of the contract related law and to analyze the claims and claim factor, and to suggest construction contract practice in the public project. The construction claims related to the design document may be minimized, through (1) the accumulation and retrieval of standard forms by owners' type, (2) the usage of specified specification considering project characteristics, (3) the materialization of detail subsurface design and various contract method in heavy engineering construction.

  • PDF

An Improved Process System to File a Claim in Construction Projects (건설공사 시 클레임 제기를 위한 프로세스 시스템 개선 방안)

  • Bang, Taewon;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.22-32
    • /
    • 2017
  • Judging from the past cases, the contractor has frequently suffered losses caused by disapproved requests or reduced payments since it has not known the conditions of the contract or it has filed a claim to the owner without any proper claim system. Therefore, the existing claim process needs to be reformed. In order to reform the claim process, the contractor should consolidate the organizational structure, grant accurate duty assignments to the claims manager, implement regular staff training on how to deal with claims. In addition to this reformation, the contractor needs to improve the management of construction period and process control, and manage related documents thoroughly. Regular meetings are also necessary in claims. This study attempts to prove the effectiveness of the reformed process applied to Project "A", where the owner was responsible for the delayed supply of materials, inaccurate oral instructions, insufficient information on the work, and frequent changes of design. The project was completed in 96 months, which was extended by 34 months from the initial construction period of 62 months. The reformed claim process is expected to be of great help not only to largescale construction works but also to smallscale ones.

A Study on the Improvement of Cost Calculation Model of Recycling Treatment Facility for Estimation of Construction Waste Disposal Fee (건설폐기물 처리대가 산정을 위한 중간처리시설의 비용산정 모델 개선에 관한 연구)

  • Chang-Hak, Kim;Jun-Yeong, Lee;Hyo-Jin, Kim
    • Land and Housing Review
    • /
    • v.14 no.1
    • /
    • pp.135-144
    • /
    • 2023
  • LH Corporation uses the construction waste disposal fee standard, of which the model was developed a long time ago. Therefore, this model is problematic because it needs to reflect waste treatment facilities' technological development and environmental conditions. In this study, the estimated manpower and costs required for the process operation of waste treatment facilities were analyzed, followed by the proposed estimation criteria. This improved standard model can be used as a cost calculation standard for the recycling and treatment of construction waste in public institutions. The study also suggests that an increase in waste treatment costs is needed.

A Study on the Improvement of Technical Guidance Fee for Preventing Accidents at Small-Medium Construction Sites (중·소규모 건설현장 재해예방 기술지도 대가 개선에 관한 연구)

  • Lim, Se-Jong;Shin, Seung-Hyeon;Won, Jeong-Hun;Yoon, Young-Cheol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.5
    • /
    • pp.469-481
    • /
    • 2021
  • Under Korean law, small-to-medium-sized construction projects with budgets of more than 100 million won and less than 12 billion won must receive technical guidance by a visiting technician belonging to a specialized institution. This study proposed a method for calculating the technical guidance fee to prevent the potential inadequacy of technical guidance when the responsibility providing the technical guidance fee is changed from a contractor to a client. The method simplified the construction works which should receive technical guidance into four sections according to the construction amount. For each section, the number of instances of technical guidance per day provided by the visiting technician and the minimum technical grade of the visiting technician were limited, and the guideline for estimating engineering services fees was applied to calculate the fee per instance of technical guidance. The results show that the proposed method can be applied to the establishment of a technical guidance fee guideline since it well reflects the current fee distribution and K2B analysis results.

Development of Estimation System for Housing Remodeling Cost through Influence Analysis by Design Elements (설계요소별 영향분석을 통한 공동주택 리모델링 공사비개산견적 산출 시스템 개발)

  • Kim, Jun;Cha, Heesung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.6
    • /
    • pp.65-78
    • /
    • 2018
  • In As urban apartment are aging, the necessity of reconstruction or remodeling to extend the life of buildings is increasing. In such a case, a co-housing association is formed to implement decisions on reconstruction or remodeling projects. At this time, the most important thing for the co-housing association is the business feasibility based on the input of the construction cost.In the case of reconstruction, it is possible to estimate the construction cost by using the accumulated construction cost data, and then evaluate the feasibility using the construction cost. However, in case of remodeling, it is difficult to calculate the accurate construction cost because the number of accumulated construction cost data is small. In addition, non-specialist clients often require estimates of various design factors, often negatively impacting the accuracy of estimates and the duration of estimates. Therefore, in this study, proposed method to reflect the opinion of the owner who is a non-expert, as a design element, and a method of calculating the expected construction cost according to the design element, and constructed this system so that it can be easily used by the non-specialist owner. In order to clearly reflect the requirements of the non-specialist owner in the estimates, extracts the design elements from the existing remodeling cases, classify them, and suggest a plan for the client to choose. In order to reflect the design factors to the estimates, the existing apartment house remodeling cases were investigated and the design factors were extracted to have a large effect on the construction cost. Finally, developed system based on MS Excel so that the above contents can be easily used by a non-specialist client. In order to verify the accuracy of the proposed estimate in this study, verified the accuracy of 80% of the results by substituting the case of remodeling quotations and obtained a positive result from the questionnaire survey to examine the ease of use of the non-specialist customer. In this study, propose an estimate estimation method using four cases. If the remodeling cases are accumulated continuously, the expected effect of this study will be higher.