1 |
Han, J., and Kim, K. (2010). "Developing element technology for competitive remodeling construction." Journal of seismic retrofitting & remodeling research center, 8(2), pp. 33-38.
|
2 |
Hong, J., Yeom, D., Choi, S., and Kim, Y. (2017). "A Study of the Decision Support Model to Select an Appropriate Alternative Plan in Apartment Remodeling." Journal of AIK, 33(3), pp. 41-50.
|
3 |
Hong, S., and Ahn, Y. (2004). "A Study on Countermeasures for the Strategic Risk Management of Remodeling in Construction Projects." Journal of AIK, 20(11), pp 153-161.
|
4 |
Hwang, K. (2003). "Construction Management in Remodeling." Korean Journal of Construction Engineering and Management, KICEM, pp. 191-197.
|
5 |
Hwang, Y., Kim, K., Kim, K, and Han, J. (2008). "Development a Process Model of Environment-friendly Demolition Works for Aged Housing Remodeling." Korean Journal of Construction Engineering and Management, KICEM, 9(6). pp. 204-216.
|
6 |
Idrus, A., Nuruddin, M. F., and Rohman, M. A. (2011). "Development of project cost contingency estimation model using risk analysis and fuzzy expert system." Expert Systems with Applications, 38(3), pp. 1501-1508.
DOI
|
7 |
Jeon, Y. (2004). "study on the analysis and the prediction of the cost for the school construction." Masters dissertation, Mokwon univ.
|
8 |
Joe, E. (2006). "A Study on the Build Cost Estimation Method for Feasibility Analysis in the Initial Phase." Masters dissertation, Konkook univ.
|
9 |
Joe, Y., Seo, B., and Yoon, S. (2015). "Development of BIM Based Estimation Prototype System Using Building Elements Combination Database." Journal of AIK, 31(3), pp. 45-52.
|
10 |
Kang, K., Jung, B., Bang, J., and Min, A. (2004). "Apartment house remodeling construction case report." Daelim, pp. 112-129.
|
11 |
Kang, S., Hwang, Y., and Kim, K. (2008). "A Scheduling Method Of Dismantling Work Considering Specific Condition Of Remodeling Project." Korean Journal of Construction Engineering and Management, KICEM, 9(5), pp. 104-116.
|
12 |
Karakhan, A. A., and Gambatese, J. A. (2017). "Identification, quantification and classification of potential safety risk for sustainable construction in the United States." Journal of Construction Engineering and Management, 143(7), 04017018.
DOI
|
13 |
Park, K. S., and Kim, K. P. (2014). "Essential BIM input data study for housing refurbishment: homeowners' preferences in the UK." Buildings, 4(3), pp. 467-487.
DOI
|
14 |
Kim, K. P., and Park, K. S. (2013). "BIM Feasibility Study For Housing Refurbishment Projects In The UK." Organization, technology & management in construction : an international journal, 5, pp. 765-774.
|
15 |
Kim, H., Choi. J., Kim, H., and Kim, I. (2013). "The Development of Data Model for Open BIM-Based Schematic Estimates - Focused on Construction Type for Actual Cost of Public Projects." Journal of AIK, 29(3), pp. 61-70.
|
16 |
Kim, H., Choi, J., and Kim, I. (2013). "A Methodology of Open BIM-Based Quantity Take-Off for Schematic Estimation of Frame Work in Super-Tall Buildings." Journal of AIK, 29(5), pp. 31-38.
|
17 |
Kim, H., Kang, I., Lee, D., and Kim, C. (2014). "Development of a Computer System and Suggestion of Man-Hours for Demolition Cost Estimation." Journal of KSCE, 34(3), pp. 1007-1015.
DOI
|
18 |
Kim, K., and Baek, H. (2015). "Comparative Analysis between RSMeans and Standard Estimating System for Selective Finish Demolition in Remodeling Projects." Journal of AIK, 31(3), pp. 73-80.
|
19 |
Kim, S., and Koo, I. (2000). "A Neural Network Cost Model for Office Buildings." Journal of AIK, 16(9), pp. 59-66.
|
20 |
Kim, Y., Kim, K., Cha, H., Kim, K., and Shin, D. (2010). "Economic Evaluation of Eco-friendly Demolition Work and Case study in Remodeling Project." Korean Journal of Construction Engineering and Management, KICEM, 11(2), pp. 45-54.
DOI
|
21 |
L.Joblot, Paviot, T., Deneux, D., and Lamouri, S. (2017). "Literature review of Building Information Modeling (BIM) intended for the purpose of renovation projects." IFAC-PapersOnLine, 50(1), pp. 10518-10525.
DOI
|
22 |
Lee, D., and Cha, H. (2010). "Development of BIM Standard Database System for an Approximate Estimate of Old-Aged Apartment Remodeling Project." Korean Journal of Construction Engineering and Management, KICEM, 11(5), pp. 53-65.
DOI
|
23 |
Lee, D., and Cha, H. (2016). "A Probabilistic Risk-based Cost Estimation Model for Initial-Satge Decision Making on Apartment Remolding Projects." Korean Journal of Construction Engineering and Management, KICEM, 17(2), pp. 70-80.
DOI
|
24 |
Lee, D., Cha, H., Kim, W., and Shin, D. (2008). "Strategy for Facilitating Old Aged Apartment Remodeling through Technology Analysis for Space Expansion." Korean Journal of Construction Engineering and Management, KICEM, 9(6), pp. 147-155.
|
25 |
Lee, H., Lee, H., Park, M., Kim, S., and Ahn, Y. (2012). "Conceptual Cost Estimating System Development for Public Apartment Projects." Korean Journal of Construction Engineering and Management, KICEM, 13(4), pp. 152-164.
DOI
|
26 |
Lee, K. (2016). "Remodeling and cost." Korea Remodeling Association, pp. 49-51.
|
27 |
Osama E. K. Daoud (1997). "The Architect/Engineer's Role in Rehabilitation Work." Journal of Construction Engineering and Management, 123(1).
|
28 |
Lim, J. (2008). "Database of preliminary estimate cost data for developing a historical data based preliminary estimate system." Masters dissertation, Sungkyunkwan univ., Korea.
|
29 |
Lim, J. (2016). "BIM-based Preliminary Estimate for Decision-Making in Conceptual Design Phase." Masters dissertation, Sejong univ., Korea.
|
30 |
Myung, J., Jung, J., and Lee, C. (2010). "Cost Analysis for a Parking Lot Expansion in the aged Apartment Complex." Proceedings of KICEM Annual Conference, KICEM, 10, pp. 233-235.
|
31 |
Park, C., Jang, S., and Kim, K. (2003). "A Probabilistic Cost Planning Model during the Design Decision-Making Process-Focused on High-Rise Office Building-" Journal of AIK, 19(11), pp. 181-189.
|
32 |
Park. S., Goo. G., Park. S(2008), "Object-Parameter Integrated Schematic Estimation Model for Predicting Office Building Interior-finishing Costs", Journal of the korea institute of building construction, 8(2), pp 159-166
|
33 |
Park, Y., Won, S., Han, C., and Lee, J. (2011). "A Study on 3D BIM Collaborative Approximate Estimating Model of Structural Work for Apartment Projects." Journal of AIK, 27(6), pp. 123-130.
|
34 |
Petroutsatou, K., Georgopoulos, E., Lambropoulos, S., and Pantouvakis, J. P. (2011). "Early cost estimating of road tunnel construction using neural networks." Journal of Construction Engineering and Management, 138(6), pp. 679-687.
DOI
|
35 |
Razali Abdul Hamid, and Fabi Jonathan Kehinde (2017). "Choosing an appropriate contingency sum estimating methods for highway construction projects in nigeria: a literature review." Journal of the Malaysian Institute of Planners, 15(1), pp. 13-20.
|
36 |
Tavakolan, M., and Etemadinia, H. (2017). "Fuzzy Weighted Interpretive Structural Modeling: Improved Method for Identification of Risk Interactions in Construction Projects." Journal of Construction Engineering and Management, 143(11), 04017084.
DOI
|
37 |
Son, B., Park, M., Lee, H., and Lim, D. (2008). "Analyzing the Schematic Cost Estimating Model Based on Quantity Variation in Building Projects Using the Case Study - Applying to Structure Cost of Residential Complex Building Project." Journal of AIK, 24(6), pp. 109-118.
|
38 |
Stoy, C., Pollalis, S., and Schalcher, H. R. (2008). "Drivers for cost estimating in early design: Case study of residential construction." Journal of Construction Engineering and Management, 134(1), pp. 32-39.
DOI
|
39 |
Sun, Y., Fang, D., Wang, S., Mengdong, D., and Lv, X. (2008). "Safety risk identification and assessment for beijing olympic venues construction." Journal of Management in Engineering, 24, pp. 40-47.
|
40 |
Wang, X., Xia, N., Zhang, Z., Wu, C., and Liu, B. (2017). "Human Safety Risks and Their Interactions in China's Subways: Stakeholder Perspectives." Journal of Management in Engineering, 33(5), 05017004.
|
41 |
Wayne, E. Whiteman, and Henry G. Irvvig (1988). "Disturbance Scheduling Technique for Managing Renovation Work." Journal of Construction Engineering and Management, 114(2), pp. 191-213.
DOI
|
42 |
Woo, J., Cha, H., Kim, K., and Shin, D. (2013). "A Study on Duration Calculation Method for Eco-Friendly Remodeling Demolition Work Using Productivity Analysis." Korean Journal of Construction Engineering and Management, KICEM, 14(1) pp. 124-133.
DOI
|
43 |
Xing Su, Abdul rahman Andoh, Hubo Cai, Jing Pan, Amr Kandil, and Hisham M. Said (2012). "GIS-based dynamic construction site material layout evaluation for building renovation projects." Automation in Construction, 27, pp. 40-49.
DOI
|
44 |
You, S., Lee, J., Park, J., and Jeon, J. (2008). "A Study on Developing Systems for Managing Information on Owner's Requirements in the Design Phase." Korean Journal of Construction Engineering and Management, KICEM, 9(3), pp. 126-135.
|
45 |
Yeom, D. (2014). "Development of An Approximate Estimate System for Exterior Finishing Works of Super High-rise Buildings." Masters dissertation, Inha univ., Korea.
|
46 |
Yoon. J., You. I.(2017). "A Study on Estimating Normal Project Duration", Journal of KICEM, 18(2), pp 12-21
|
47 |
Yoon, Y. (2013). "The methodology of the apartment remodeling for supporting the customized renovation." land & housing institute.
|
48 |
You, Y., Lee, K., Kim, J., and Chou, I. (2004). "A Study on the Change Factors by Activities for Estimating Historical Cost on Apartment Housing Projects." Journal of AIKRA, 4(4), pp. 117-127.
|
49 |
Zolfagharian, S., and Irizarry, J. (2017). "Constructability Assessment Model for Commercial Building Designs in the United States." Journal of Construction Engineering and Management, 143(8)
|
50 |
Ahn, J., and Lee, D. (2014). "Construction Cost Estimate Modeling of Roundabout at Preliminary Design Stage in Jeju." Journal of KSCE, 34(4), pp. 1299-1306.
DOI
|
51 |
Cha, H., and Lee, D. (2018). "Determining Value at Risk for Estimating Renovation Building Projects by Application of Probability-based Fuzzy Set Theory." Journal of Asian Architecture and Building Engineering, 17(1), pp. 63-70.
DOI
|
52 |
Baek, H., Nam, W., Kim, S., Kim, H., Choi, J., and Kim, K. (2013). "Scheduling Technique for Remodeling Project of Inhabited Condition." Korean Journal of Construction Engineering and Management, KICEM, 14(2), pp. 141-150.
DOI
|
53 |
Bakhshi, P., and Touran, A. (2014). "An overview of budget contingency calculation methods in construction industry." Procedia Engineering, 85, pp. 52-60.
DOI
|
54 |
BCIS (2012). Elemental Standard Form of Cost Analysis - Principles, Instructions, Elements and Definitions, 4th (NRM) ed., RICS Building Cost Information Service, London.
|
55 |
Cheng, M. Y., Tsai, H. C., and Hsieh, W. S. (2009). "Web-based conceptual cost estimates for construction projects using Evolutionary Fuzzy Neural Inference Model." Automation in Construction, 18(2), pp. 164-172.
DOI
|
56 |
Choi, J., Kim, H., and Kim, I. (2015). "Open BIM-based quantity take-off system for schematic estimation of building frame in early design stage." Journal of Computational Design and Engineering, 2(1), pp. 16-25.
DOI
|
57 |
Choi, S., Son, J., Lee, D., and Choi, M. (2010). "Management A Study on the Application of the Cost Data Guide in Remodeling Works." Journal of AIKRA, 12(4), pp. 343-353.
|
58 |
Getuli, V., Giusti, T., and Capone, P. (2015). "A Decision Support System (DSS) for constructability assessment in seismic retrofit of complex buildings." ISARC, 32(1).
|
59 |
Han, J., Cha, H., and Lee, D. (2009). "A Measure for Standardization of Old Aged Apartment Remodeling through Application of BIM." Korean Journal of Construction Engineering and Management, KICEM, 10(3), pp. 53-64.
|