• Title/Summary/Keyword: 건설공사비관리

Search Result 654, Processing Time 0.023 seconds

The Establishment of the Task and Role of the Participants at Building Remodeling Phases (건축 리모델링 사업단계별 참여주체자의 업무와 역할정립)

  • Jung Duk-Woo;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.331-334
    • /
    • 2002
  • This study proposes a scheme for successful remodeling projects by establishing the task and role of project participants. In doing so, the study investigates the natures and problems of the current remodeling practices through interview and questionnaire survey with experts. This study establishes the critical phase of remodeling process and defines the task and role of project participants at each phase. The related documents of being generated at each phase also match up the task and role. It is expected that this scheme can be applied to deal with conflicts, cost overruns, and delays of time.

  • PDF

Direction of Selecting the Alternative considered Correlation between Building Systems in Remodeling Design Process (리모델링 설계단계에서 건축시스템 상관관계를 고려한 대안선정 방안)

  • Lee Dong-Jun;Park Chan-Gil;Park Sang-Jun;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.415-418
    • /
    • 2002
  • As Remodeling is proceed in the limited condition that is utilization of existing resource, the selection of remodeling objects and scope are affected by the correlation of building systems. Unexpected problems have occurred in construction phase by lack of the consideration about correlation of building systems; increasing of cost, delaying of schedule etc. Therefore, this research suggests the Building System Correlation Diagram Model and the direction of cost estimation .for selecting alternative reasonably in remodeling design process.

  • PDF

Selection Method for Component Alternatives of Considering Building Systems Correlation in Remodeling Projects (리모델링 프로젝트에서 건축시스템 상관관계를 고려한 부위별 대안선정 방법)

  • Park Chan-Gil;Lee Dong-Jun;Shin Chang-Hyung;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.402-405
    • /
    • 2003
  • As Remodeling is proceed in the limited condition that is utilization of existing resource, the selection of remodeling objects and scope are affected by the correlation of building systems. Unexpected problems have occurred in construction phase by lack of the consideration about correlation of building systems; increasing of cost, delaying of schedule etc. Therefore, this research suggests the Building System Correlation Diagram Model and the method for selecting the alternative reasonably in remodeling project.

  • PDF

Decision Making Model for Widening Bridges Using Decision Tree Technique (의사결정수 기법을 이용한 교량확폭에 관한 의사결정모델 개발)

  • Cho, Hyo Nam;Park, Jin-Hyung;Sun, Jong-Wan;Youn, Man-Keun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.12 no.4
    • /
    • pp.187-194
    • /
    • 2008
  • Recently, the constructions of widening bridges or new bridges are often undergoing as a part of road widening because traffic volumes are rapidly increasing caused by fast-growing population and urbanization. But in general, there is no rational decision process and specification to justify the validity of the bridge widening. Moreover, there are also numerous events including various uncertainties involved in widening bridges. In this paper, therefore, a decision making model is proposed for widening bridges using decision tree based on quantitative LCC analysis considering a variety of uncertainties for the rational and practical approach to a quantitative decision making for alternatives.

A Probabilistic Risk-based Cost Estimation Model for Initial-Stage Decision Making on Apartment Remolding Projects (공동주택 리모델링 초기 단계 의사결정을 위한 확률론적 리스크 기반 비용 예측 모델 개발)

  • Lee, Dong-gun;Cha, Heesung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.70-79
    • /
    • 2016
  • The current remodeling cost estimation process is not only dependent on the historical data of new building construction, but it also has a poor linkage with risk-based estimation approach. As such, there is a high risk of falling short of initial budget. To overcome this, a risk-based estimation approach is necessary by providing a probabilistic estimation in consideration of the potential risk factors in conducting the remodeling projects. In addition, the decision-making process should be linked with the risk-based estimation results in stead of intuitive and/or experience-based estimation. This study provides a probabilistic estimation process for residential remodeling projects by developing a detailed methodology in which a step-by-step approach can be achieved. The new proposed estimation approach can help in decision-making for remodeling projects in terms of whether to proceed or not, by effectively reflecting the potential risk factors in the early stage of the project. In addition, the study can enhance the reliability of the estimation results by developing a sustainable estimation process model where a risk-based evaluation can be accomplished by setting up the cost-risk relationship database structure.

A Method of Assigning Weight Values for Qualitative Attributes in CBR Cost Model (사례기반추론 코스트 모델의 정성변수 속성가중치 산정방법)

  • Lee, Hyun-Soo;Kim, Soo-Young;Park, Moon-Seo;Ji, Sae-Hyun;Seong, Ki-Hoon;Pyeon, Jae-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.53-61
    • /
    • 2011
  • For construction projects, the importance of early cost estimates is highly recognized by the project team and sponsoring organization because early cost estimates are frequently a foundation of business decisions as well as a basis for identifying any changes as the project progresses from design to construction. However, it is difficult to accurately estimate construction cost in the early stage of a project due to various uncertainties in construction. To deal with these uncertainties, cost estimates should be made several times over the course of the project. In particular, early cost estimates are essential process for successful project management. For accurate construction cost estimates, it is necessary to compare cost estimates with actual costs based on historical project data. In this context, case-based reasoning (CBR), which is the process of solving new problems based on the solutions of similar past problems, can be considered as an effective method for cost estimating. To obtain this, it is also required to define the attribute similarities and the attribute weights. However, no existing method is capable of determining attribute weights of qualitative variables. Consequently, it has been a well-known barrier of accurate early cost estimates. Using Genetic Algorithms (GA), this research suggests the method of determining the attribute weight of qualitative variables. Based on building project case studies, the proposed methodology was validated.

Development of Active 5D CAD System for Replaning Progress Schedule According to Change of Project Cost (사업비 변동에 따른 공정계획 재수립을 위한 능동형 5D CAD 시스템 개발)

  • Kim, Hyeonseung;Kang, Leenseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.54-61
    • /
    • 2016
  • The initial planned annual cost is frequently adjusted under the construction process in construction projects. If the annual cost is reduced than the initial planned cost, the number of possible activities is also reduced from initial planned progress schedule. In such cases, project manager need to replan the progress schedule with possible activities within changed annual cost. However, most project manager will proceed as planned schedule without any change. After the project cost has been exhausted, there are many cases to stop the operation of the construction site. This study developed active 5D CAD system that can replan the progress schedule within changed annual cost and simulate the cost status according to the changed schedule for cost visualization. This system can be used as a decision-making tool in the replaning progress schedule and will be able to increase the practical usability of 5D CAD system.

A Model of Work Breakdown Structure for being applied to Historical Data in BTL Project for Educational Facilities (교육시설 BTL 사업의 실적공사비 적용을 위한 작업분류체계(WBS) 구축)

  • Kim, Sung-Kyum;Cho, Chang-Yeon;Son, Jae-Ho;Kim, Jae-On
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.499-502
    • /
    • 2007
  • The government abolished the existing method to calculate the construction price by the quantity take-off and pricing. It has introduced a new estimating system which uses the actual cost data on the basis of actual contract unit price. However, in the case of the current method to calculate the estimate price of BTL educational facilities, it is difficult to prepare an accurate ground for calculating unit prices due to a lack of standardized work breakdown structure (WBS) and guidelines for the detailed bidding documents. Thus, this research aims to establish WBS using the actual construction price on the basis of the actual bidding documents for the previous construction of BTL educational facilities. This specific WBS can be differentiated from the general WBS which is not suited for construction of the educational facility. It makes possible to build the construction information classification system and it helps to systemize the maintenance and repair cost items.

  • PDF

Construction Material Management Using Smart Mobile Computing (스마트 모바일 어플리케이션을 이용한 건설 자재 관리)

  • Lee, Kwang-Pyo;Lee, Hyun-Soo;Park, Moon-Seo;Kim, Eui-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.4
    • /
    • pp.59-69
    • /
    • 2011
  • Construction works have become larger and more complex, improving productivity by introducing Information Technology (IT) is pursued. In this circumstance, many different kinds of project management system is being introduced, and various IT technologies are applied such as Personal Digital Assistant (PDA), Bar Code, Radio Frequency Identification (RFID), Web Camera, and so on. However, these kinds of technologies might cause reprocessing of information and ineffectiveness of project because of lack of real time information processing technology or separation between construction sites and management offices. Therefore, this research aims to develop Application that can be applied efficiently for construction material management, by understanding problems of former management system with questionnaires and extracting functions with analysis of requirements. This will be possible to input information automatically, to process and check material information in real time, and to identify the location of necessary material. Then, the problem of separation between construction sites and management offices are solved, and as a result, more efficient management of materials in construction sites will become possible.

Application Effect Analysis of The Modular Construction Method in The Extension Works (저층 교육시설 증축공사에서 모듈러 공법의 적용효과 분석)

  • Kim, Hakcheol;Shin, Dongwoo;Cha, Heesung;Kim, Kyungrai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.6
    • /
    • pp.101-111
    • /
    • 2015
  • The modular construction method has been getting more attention followed by global eco-friendly trend as the domestic construction industry has focused more on remodeling and extension work. The modular construction method is an industrialized construction system which is not likely as the existing construction method it manufactures more than 70% modules at the factory then assembling can be completed in a short amount of time on site. The modular construction method has various strengths; shortening of construction period by on-site work decrease, weight pressure reduction by usage of light steel frames and cost saving by repetitive manufacturing. However, it is currently not expanded due to the existing commercialized construction method. Therefore, this research is in order to help the related authorities make decisions to select the construction method and motivate expansion of modular construction method which can be utilized effectively in the extension works. The intention of this research is to stress differentiation from other construction methods in construction period, construction expenses, labor and forces by comparing and analyzing actual cases, to inform competitiveness of modular construction method by concrete effect analysis and to support adoption of the modular construction method into the domestic industry.