A Probabilistic Risk-based Cost Estimation Model for Initial-Stage Decision Making on Apartment Remolding Projects  

Lee, Dong-gun (Department of Architectural Engineering, Ajou University)
Cha, Heesung (Department of Architectural Engineering, Ajou University)
Publication Information
Korean Journal of Construction Engineering and Management / v.17, no.2, 2016 , pp. 70-79 More about this Journal
Abstract
The current remodeling cost estimation process is not only dependent on the historical data of new building construction, but it also has a poor linkage with risk-based estimation approach. As such, there is a high risk of falling short of initial budget. To overcome this, a risk-based estimation approach is necessary by providing a probabilistic estimation in consideration of the potential risk factors in conducting the remodeling projects. In addition, the decision-making process should be linked with the risk-based estimation results in stead of intuitive and/or experience-based estimation. This study provides a probabilistic estimation process for residential remodeling projects by developing a detailed methodology in which a step-by-step approach can be achieved. The new proposed estimation approach can help in decision-making for remodeling projects in terms of whether to proceed or not, by effectively reflecting the potential risk factors in the early stage of the project. In addition, the study can enhance the reliability of the estimation results by developing a sustainable estimation process model where a risk-based evaluation can be accomplished by setting up the cost-risk relationship database structure.
Keywords
Decision Making; Preliminary estimation; Probabilistic approach; Remodeling project; Risk-based;
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 AACE International (1999). Skills and Knowledge of cost engineering, 4th Ed., AACE, Morgantown, WV.
2 Construction Association of Korea (CAK) (2015). Main Construction Statistics, CAK Report.
3 Kirkham, R. J. (2007). Ferry and Brandon's Cost planning of Buildings, 8th Ed., Wiley-Blackwell, Hoboken, NJ.
4 Lee, J. W., Jeong, S. Y., Kim, K. H., and Choi, J. S. (2009). "A Study of Risk Analysis of remodeling construction in resident status", Proceedings of KICEM Annual Conference 2009, KICEM, 9, pp. 149-152.
5 Lee, D. G. and Cha, H. S. (2010). "Development of BIM Standard Database System for an Approximate Estimate of Old-Aged Apartment Remodeling Project," Korean Journal of Construction Engineering and Management, KICEM, 11(5), pp. 53-64.   DOI
6 Lee, S. B., Jun, Y. J., Yu, M. S., and Son, B. S. (2012). "A Basic Study on Factors and Countermeasures of Risk in the Remodeling Project", Proceedings of KICEM Annual Conference 2012, KICEM, 12, pp. 147-151.
7 Lee, S. B., and Son, B. S. (2013). "An Analysis on Characteristics and Risk Factors of the Remodeling Project", Journal of Korea Facility Management Association, 8(2), pp. 5-11.
8 Lee, T. W., Kim, K. T., and Han, C. H. (2002). "The Analysis of Risk Factors for Apartment Remodeling Feasibility Study", Korean Journal of Construction Engineering and Management, KICEM, 3(4), pp. 84-92.
9 NevadaDoT (2012). Risk Management and Risk-based Cost Estimation Guidelines, Nevada.
10 Oh, S. W. (2002). "A Study on the Economic Efficiecny Analysis of Office Building Remodeling Projects," MS thesis, 엣. of Arch. Engr., Chung-Ang Univ., Korea.
11 Shim, G. J., Seo, J. M., Na, Y. J., Song, Y. S., and Kim, S. K. (2008). "An Anaysis of Influence Factors for the Remodeling Project Management of Apartment Buildings," KIEAE Journal , 8(5), pp. 77-83.
12 Woo, J. P., Cha, H. S., Kim, K.,R and Shin, D. W. (2013). "A Study on Duration Calculation Method for Eco-Friendly Remodeling Demolition Using Productivity Analysis," Korean Journal of Construction Engineering and Management, KICEM, 14(1), pp. 124-132.   DOI