• 제목/요약/키워드: $c_1$-construction

검색결과 1,667건 처리시간 0.025초

ON THE C1-CONSTRUCTION

  • Song, Youngkwon
    • Korean Journal of Mathematics
    • /
    • 제8권2호
    • /
    • pp.193-198
    • /
    • 2000
  • In [4], it is proved that the algebra ($S,k^{14}$) is not a $C_1$- construction if the field is the real number field. In this paper, we will introduce a different proof of the fact that the algebra ($S,k^{14}$) is not a $C_1$-construction.

  • PDF

건설공사 안전관리 및 시공 업무의 중요도 분석에 관한 연구 (Analysis of Construction Safety Management and Execution Tasks for Performance Improvement)

  • 강상훈;김대영
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 추계 학술논문 발표대회
    • /
    • pp.130-131
    • /
    • 2018
  • The main purpose of this study is to analyze the importance of the construction work of apartment buildings. The construction work operation was divided into five major tasks, which include: Schedule Control (P'1 - P5) Construction Management (C'1 - C'5), Environmental Management (E'1 - E'3), and Quality Management. Finally, this study derived major construction execution tasks through correlation between construction work and the original index and t-test.

  • PDF

C32-CONSTRUCTION ON Mn(κ)

  • Song, Youngkwon
    • Korean Journal of Mathematics
    • /
    • 제12권1호
    • /
    • pp.23-32
    • /
    • 2004
  • Let (B, $m_B$, ${\kappa}$) be a maximal commutative ${\kappa}$-subalgebra of a matrix algebra $M_n(\kappa)$. We will construct a maximal commutative ${\kappa}$-subalgebra (R, $m$, ${\kappa}$) of $M_n+3(\kappa)$ from the algebra B such that the algebra R has dimension greater than the dimension of B by 3. Moreover, we will show a $C_i$-construction doesn't imply a $C^3_2$-construction for $i=1,2$.

  • PDF

프로젝트 성공을 위한 효과적인 시공업무 및 영향 분석 - 아파트 설비공사를 중심으로 - (An Analysis of Construction Execution Tasks for Successful Residential Mechanical Projects)

  • 강상훈;김대영
    • 한국건설관리학회논문집
    • /
    • 제20권2호
    • /
    • pp.60-67
    • /
    • 2019
  • 본 연구의 주목적은 공동주택 설비 시공 단계에서 수행되는 업무들을 파악하고 성과지표에 영향을 줄 수 있는 주요 시공업무를 분석하여 프로젝트의 성과에 미치는 영향을 분석하는데 있다. 국내 외 연구동향을 비롯한 선행연구와 예비 데이터 수집(pilot data), 시공업무 데이터베이스 구축을 통한 전문가 의견을 바탕으로 시공업무를 크게 5개의 주요업무로 구분하고 각각을 공정관리(P'1~P'6), 시공관리(C'1~C'5), 환경관리(E'1~E'4), 품질관리(Q'1~Q'5), 안전관리(S'1~S'5)으로 명명하였다. 그 후, 각각의 주요 업무를 세분화 시켜 총 24개의 세부 시공업무로 분류하였다. 원가 및 공기에 대한 영향을 분석하기 위해 independent t-test를 실시하였다. 프로젝트 목표 달성에 따른 중요도를 비교하여 유의도 0.05 이하에 대해 원가뿐만 아니라 공기의 성과지표에 공통적으로 영향을 미치는 구체적인 중요 공사의 시공업무를 파악하였다.

TAP을 적용한 내단열과 외단열구조의 열성능 평가에 관한 연구 (A Study on Thermal Performance Evaluation with TAP (Thermosyphoning Air Panel) in Inside and Outside Insulated Constructions)

  • 이경회;유호천;홍영우;전채휘
    • 태양에너지
    • /
    • 제7권1호
    • /
    • pp.23-29
    • /
    • 1987
  • TAP system, a kind of natural convective space heating collector, has a good heat loss by night. The aim of this paper is to induce and to study an hourly heat flow theory by response factors analysis with TAP in inside and outside insulated construction, to compare and evaluate on thermal performance an hourly natural temperature, heated room temperature and heating load in aboved-mention constructions with computer simulation. The results of the study can be summarized as follows. According that there is no TAP and with TAP, it is inside insulated construction and outside insulated construction, daily natural range of temperature each shows $12.5^{\circ}C$ and $16.7^{\circ}C$, $2.7^{\circ}C$ and $3.7^{\circ}C$, daily heated range of temperature with noramal control heating system each shows $6.6^{\circ}C$ and $12.1^{\circ}C$, $1.7^{\circ}C$ and $3.1^{\circ}C$, heating hours each show 10 hr and 7 hr, 9 hr and 4 hr and heating energy saving percentage in january 123% and 79%, 100% and 40%. Therefore, energy saving percentage shows that outside insulated construction saves about 54% in comparision with inside insulated construction.

  • PDF

Construction Process & Technologies Applied to Parc.1 Project

  • Hoi-soo, Seo;Jae-min, Baek
    • 국제초고층학회논문집
    • /
    • 제11권3호
    • /
    • pp.181-187
    • /
    • 2022
  • POSCO E&C has completed Parc.1 project successfully. The construction period was 42months, and 1.5 million workers were participated till completion. To meet schedule management and quality control, POSCO E&C has adopted a lot of technologies such as GPS measurement, 3D scanning, vibration control, stack effect control, column shortening control, etc

공동주택 설비공사 계획업무의 성과지표에 미치는 영향분석 (Analysis of the Impact of Construction Planning Tasks on Project Cost and Schedule Success in Residential Projects)

  • 김대영;임형철;김대영;허영기
    • 한국건설관리학회논문집
    • /
    • 제20권3호
    • /
    • pp.31-38
    • /
    • 2019
  • 본 연구의 주목적은 공동주택 설비 계획 단계에서 수행되는 업무들을 파악하고 성과지표에 영향을 줄 수 있는 주요 계획업무를 분석하여 프로젝트의 성과에 미치는 영향을 분석하는데 있다. 계획업무의 성과지표에 대한 영향 분석을 위하여 설비공사의 계획업무를 크게 5개의 주요업무로 구분하고 각각을 공정계획(P1~P6), 시공계획(C1~C5), 환경관리계획(E1~E4), 품질관리계획(Q1~Q5), 안전관리계획(S1~S5)으로 명명하고, 각각의 주요 업무를 세분화 시켜 총 25개의 세부 계획업무로 분류하여 원가에 대한 영향을 분석하기 위해 independent t-test를 실시하였다. 각각의 주요 업무를 세분화 시켜 총 25개의 세부 계획업무로 분류하여 원가에 대한 영향을 분석하기 위해 independent t-test를 실시하였다. 프로젝트 목표 달성에 따른 중요도를 비교하여 유의도 0.05 이하에 대해 원가뿐만 아니라 공기의 성과지표에 공통적으로 영향을 미치는 구체적인 중요 공사의 계획업무를 파악하였다.

A Modified-AHP Method of Productivity Analysis for Deployment of Innovative Construction Tools on Construction Site

  • Kwon, Soonwook;Lee, Gaeyoung;Ahn, Dooyong;Park, Hee-Sung
    • Journal of Construction Engineering and Project Management
    • /
    • 제4권1호
    • /
    • pp.45-50
    • /
    • 2014
  • Productivity analysis is the most important and significant method for evaluating management and engineering performance during whole project stage. However, it is very difficult in developing qualitative index to construction industry comparing to other industries. Therefore, analytical hierarchy process (AHP) is one of the methods for overcoming these limitations by checking consistency index using duality comparison. In this study, it is scraped up an application plan and selection for innovative tools by analyzing survey results on tool users and site managers with respect to using Modified-AHP performance measurement method.

Life cycle assessment (LCA) of roof-waterproofing systems for reinforced concrete building

  • Ji, Sukwon;Kyung, Daeseung;Lee, Woojin
    • Advances in environmental research
    • /
    • 제3권4호
    • /
    • pp.367-377
    • /
    • 2014
  • In this study, we investigated a life cycle assessment (LCA) of six roof-waterproofing systems [asphalt (C1), synthetic polymer-based sheet (C2), improved asphalt (C3), liquid applied membrane (C4), Metal sheet with asphalt sheet (N1), and liquid applied membrane with asphalt sheet (N2)]for reinforced concrete building using an architectural model. To acquire accurate and realistic LCA results, minimum units of material compositions for life cycle inventory and real data for compositions of waterproofing materials were used. Considering only materials and energy demands for waterproofing systems per square meter, higher greenhouse gas (GHG) emissions could be generated in the order of C1 > N2 > C4 > N1 > C2 > C3 during construction phase. However, the order was changed to C1 > C4 > C3 > N2 > N1 > C2, when the actual architecture model was applied to the roof based on each specifications. When an entire life cycle including construction, maintenance, and deconstruction were considered, the amount of GHG emission was in the order of C4 > C1 > C3 > N2 > C2 > N1. Consequently, N1 was the most environmental-friendly waterproofing system producing the lowest GHG emission. GHG emissions from maintenance phase accounted for 71.4%~78.3% among whole life cycle.