Construction Process & Technologies Applied to Parc.1 Project  

Hoi-soo, Seo (Building Technology Group, POSCO E&C)
Jae-min, Baek (Architectural Design Group, POSCO E&C)
Publication Information
International Journal of High-Rise Buildings / v.11, no.3, 2022 , pp. 181-187 More about this Journal
Abstract
POSCO E&C has completed Parc.1 project successfully. The construction period was 42months, and 1.5 million workers were participated till completion. To meet schedule management and quality control, POSCO E&C has adopted a lot of technologies such as GPS measurement, 3D scanning, vibration control, stack effect control, column shortening control, etc
Keywords
Posco e&c; Parc.1; high-rise building; mega column; mega brace;