Browse > Article
http://dx.doi.org/10.6106/JCEPM.2014.4.1.045

A Modified-AHP Method of Productivity Analysis for Deployment of Innovative Construction Tools on Construction Site  

Kwon, Soonwook (School of Civil, Architectural, and Environmental Engineering, SungKyunKwan University)
Lee, Gaeyoung (R&D Center on Construction Robot & Automation, Samsung C&T Corporation)
Ahn, Dooyong (Samsung M-PJT, Samsung C&T Corporation)
Park, Hee-Sung (Department of Civil and Environmental Engineering, Hanbat National University)
Publication Information
Journal of Construction Engineering and Project Management / v.4, no.1, 2014 , pp. 45-50 More about this Journal
Abstract
Productivity analysis is the most important and significant method for evaluating management and engineering performance during whole project stage. However, it is very difficult in developing qualitative index to construction industry comparing to other industries. Therefore, analytical hierarchy process (AHP) is one of the methods for overcoming these limitations by checking consistency index using duality comparison. In this study, it is scraped up an application plan and selection for innovative tools by analyzing survey results on tool users and site managers with respect to using Modified-AHP performance measurement method.
Keywords
Innovative tool; Productivity; AHP; Construction site operation;
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 J.S. Won, "An Analysis of the International Competitiveness of Productivity in the Korea", Journal of Korea Institute of Construction Engineering Management, KICEM, Vol. 9, no. 4, pp. 75-83, 2008.
2 Y.S. Kim, "Analysis of the Factors Influencing Construction Productivity", Journal of the Architectural Institute of Korea, AIK, vol. 10, no. 10, pp. 267-272, 1994.
3 S.H. Park, "A Study on Accuracy Analysis of Based on Work Factor System and Setting-up a Work-time of MODAPTS", Proceedings of Korean Institute of Industrial Engineers (KIIE) Spring Conference, pp. 545-554, 1992.
4 H.H. Jo, "A Study on the Motion Analysis and AHP Evaluation Method in Construction Works", Journal of the Architectural Institute of Korea, AIK, vol. 17, no. 2, pp. 1423-1429, 1997.
5 B.W. Niebel, K. Cho, S. Lee, Y. Cho, "A Case Study for Assembly Line Analysis with MTM", Journal of the Korean Institute of Industrial Engineers, KIIE, vol. 6, no. 1, pp. 39-44, 1980.   과학기술학회마을
6 H.K. Jung, "A Study on Productivity Analysis on Formworks using Work Measuring Method", Journal of Korea Institute of Building Construction, KIC, vol. 5, no. 4, pp. 131-137, 2005.
7 B.S. Yoon, "Quantitative Analysis on Relation between Work Management Method, Condition and Efficiency", Master's Thesis of KwangWoon University, 2010.
8 F.B. Gilbreth, "Motion Study: A Method for Increasing the Efficiency of the Workman (1911)", Kessinger Publishing, 2010.
9 M.N. Lee, "Introduction, Application, and Productivity Evaluation of Advanced Tools", Proceedings of Korea Institute of Construction Engineering Management (KICEM), vol. 11, p. 33, 2011
10 H.H. Jo, "A Study on Development of Work-analysis and Evaluation Model on Building Construction", Journal of the Architectural Institute of Korea, AIK, vol. 17, no. 10, pp. 145-152, 2001.   과학기술학회마을
11 S.H. Ahn, "A Study on Work Condition Management Method for Improving Work Efficiency, " Journal of the Architectural Institute of Korea, AIK, vol. 24, no. 4, pp. 183-190, 2008.