Construction Process & Technologies Applied to Parc.1 Project
- Hoi-soo, Seo (Building Technology Group, POSCO E&C) ;
- Jae-min, Baek (Architectural Design Group, POSCO E&C)
- Published : 2022.09.01
Abstract
POSCO E&C has completed Parc.1 project successfully. The construction period was 42months, and 1.5 million workers were participated till completion. To meet schedule management and quality control, POSCO E&C has adopted a lot of technologies such as GPS measurement, 3D scanning, vibration control, stack effect control, column shortening control, etc