An Analysis of Construction Execution Tasks for Successful Residential Mechanical Projects  

Kang, Sang-Hun (Department of Architectural Engineering, Pusan National University)
Kim, Dae Young (Department of Architectural Engineering, Pusan National University)
Publication Information
Korean Journal of Construction Engineering and Management / v.20, no.2, 2019 , pp. 60-67 More about this Journal
Abstract
The main purpose of this study is to identify the tasks performed at the construction stage of apartment houses and analyze the major construction tasks that may affect the performance indicators and analyze the impact on project performance. Based on expert opinions through preliminary research, pilot data, construction database, and other research trends, domestic and foreign research trends are divided into five major tasks, and each is divided into process management (P'1 ~ P'6), construction management (C'1 ~ C'5), environmental management (E'1 ~ E'4), quality control (Q'1 ~ Q'5), safety management (S'1 ~ S'5). Subsequently, each major task was subdivided into 24 detailed tasks. An independent t-test was conducted to analyze the impact on cost. We compared the importance of achieving the project goal and identified the construction work of concrete important construction which affects not only the cost but also the schedule performance index for the degree of significance of less than 0.05.
Keywords
Construction Management; Construction Work; Cost; Facilities; Project Success; Schedule;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 Arena, P., Caponetto, R., Fortuna, L., and Xibilia, M. G. (1992). "Genetic algorithms to select optimal neural network topology." In Circuits and Systems, Proceedings of the 35th Midwest Symposium on, pp. 1381-1383.
2 Ballard, G., Harper, N., and Zabelle, T.R. (2003). "Learning to see work flow: an application of lean concepts to precast concrete fabrication." Engineering Construction and Architectural Management, 10(1), pp. 6-14.   DOI
3 Ballard, G., and Howell, G. (1998). "Shielding Production: Essential Step in Production Control." Journal of Construction Engineering and Management, 124(1), pp. 11-17.   DOI
4 Ballard, G., and Howell, G. (2003). "Lean Project Management." Building Research & Information, 31(2), pp. 119-133.   DOI
5 Cho, Y.S., and Cha, H.S. (2010). "A Study of project characteristics and project performance level of difficulty." Korean Journal of Construction Engineering and Management, KICEM, 11(6), pp. 78-88.   DOI
6 Rojas, E.M. (Ed.). (2009). "Construction project management: A practical guide for building and electrical contractors." J. Ross Publishing.
7 Eriksson, P.E. (2010). "Improving Construction Supply Chain Collaboration and Performance: A Lean Construction Pilot Project." Supply Chain Management: An International Journal, 15(5), pp. 394-403.   DOI
8 Hanna, A.S., and Skiffington, M.A. (2010). "Effect of Preconstruction Planning Effort on Sheet Metal Project Performance." Journal of Construction Engineering and Management, 136(2), pp. 235-241.   DOI
9 Kim, J.Y., and Kim, E.S. (2010). "The State of Schedule Management and the Recognition of Duration Shortening." Journal of the Korea Institute of Building Construction, 10(5), pp. 87-94.   DOI
10 Koskela, L., Howell, G., and Tommelein, I. (2002). "The Foundations of Lean Construction." Design and Construction: Building in Value, R. Best, and G. de Valence, eds., Butterworth-Heinemann, Elsevier, Oxford, UK.
11 Jorgensen, B., and Emmitt, S. (2008). "Lost in transition: the transfer of lean manufacturing to construction." Engineering, Construction and Architectural Management, 15(4), pp. 383-398.   DOI
12 Jung, S.O., Kim, Y.S., Chin, S.Y., and Yoon, S.W. (2005). "A Proposal the Assessment Criteria and Conceptual Methodology of Performance Measurement based on Efficiency through Construction Project Life Cycle." Journal of the Architectural Institute of Korea, 21(7), pp. 139-48.
13 Mao, X., and Zhang, X. (2008). "Construction process reengineering by integrating lean principles and computer simulation techniques." Journal of Construction Engineering and Management, 134(5), pp. 371-381.   DOI
14 Seo, J.W., and Kang, K.I. (2009). "The analysis of defects types and patterns in high-rise residential buildings." Journal of the Korea Institute of Building Construction, 9(2), pp. 93-101.   DOI
15 Menches, C.L., and Hanna, A.S. (2006). "Conceptual planning process for electrical construction." Journal of construction engineering and management, 132(12), pp. 1306-1313.   DOI
16 Menches, C.L. (2006). "Effect of pre-construction planning on project performance." University of wisconsin-Madison, Madison.
17 Nasr, Z.J.B. (2009). "Electrical Project Management Model." The University of Texas at Austin, Austin.
18 Sin. Y.I., and Kim, H.S. (2004). "Performance Measurement Techniques and Best Practice in Construction Projects." Journal of the Architectural Institute of Korea, 20(3), pp. 105-112.
19 Zavadskas, E.K., Vilutienė, T., Turskis, Z., and Saparauskas, J. (2014). "Multi-criteria analysis of Projectsʼ performance in construction." Archives of Civil and Mechanical Engineering, 14(1), pp. 114-121.   DOI
20 Soewin, E., and Chinda, T. (2018). "Factors affecting construction performance: exploratory factor analysis." In IOP Conference Series: Earth and Environmental Science, 140(1), 012102.   DOI