Browse > Article
http://dx.doi.org/10.6106/KJCEM.2019.20.3.031

Analysis of the Impact of Construction Planning Tasks on Project Cost and Schedule Success in Residential Projects  

Kim, Dae Young (Department of Architectural Engineering, Pusan National University)
Lim, Hyoungchul (Department of Architectural Engineering, Changwon National University)
Kim, Daeyoung (Department of Architectural Engineering, Kyungnam University)
Huh, Youngki (Department of Architectural Engineering, Pusan National University)
Publication Information
Korean Journal of Construction Engineering and Management / v.20, no.3, 2019 , pp. 31-38 More about this Journal
Abstract
The main purpose of this study is to analyze the impact of the cost estimates on the construction work in residential apartment housing facilities. The planning work of facility construction is roughly divided into five main tasks which are further broken down into the following: process plan (P1-P6), construction plan (C1-C5), environmental management plan (E1-E4), quality management plan (Q1-Q5) and the safety management plan (S1-S5). In this study these tasks were classified into 25 detailed planning duties and a statistical analysis was performed on each one to determine its impact on cost. Finally this study derives from major planning tasks for effective cost management through correlation between planning tasks, cost indicators and t-test.
Keywords
Construction Planning; Safety Planning; Project Success; Schedule;
Citations & Related Records
Times Cited By KSCI : 5  (Citation Analysis)
연도 인용수 순위
1 Ballard, G., and Howell, G. (2003). "Lean Project Management." Building Research & Information, 31(2), pp. 119-133.   DOI
2 Ballard, G., and Zabelle, T.R. (2000). "Lean design: Process, tools, and techniques." Lean Construction Institute White Paper No. 10, Lean Construction Institute, Ketchum, Id.
3 Cha, H.S., and Kim, T.K. (2008). "Developing measurement system for key performance indicators on building construction projects." Korean Journal of Construction Engineering and Management, KICEM, 9(4), pp. 120-130.
4 Cho, Y.S., and Cha, H.S. (2010). "A Study of project characteristics and project performance level of difficulty." Korean Journal of Construction Engineering and Management, KICEM, 11(6), pp. 78-88.   DOI
5 CII. (2011). Enhanced work packaging: Design through workface execution (Doctoral dissertation).
6 COAA (Construction Owners Association of Alberta). (2007). Workface planning model and implementation guide.
7 Elazouni, A.M., Ali, A.E., and Abdel-Razek, R.H. (2005). "Estimating the acceptability of new formwork systems using neural networks." Journal of construction engineering and management, 131(1), pp. 33-41.   DOI
8 ELECTRI International (2009). Construction Project Management: A Practical Guide for Building and Electrical Contractors, J. Ross Publishing, Fort Lauderdale, FL.
9 Guo, S.J. (2002). "Identification and Resolution of Work Space Conflicts in Building Construction." Journal of Construction Engineering and Management, 128(4), pp. 287-295.   DOI
10 Hanna, A.S., and Skiffington, M.A. (2010). "Effect of Preconstruction Planning Effort on Sheet Metal Project Performance." Journal of Construction Engineering and Management, 136(2), pp. 235-241.   DOI
11 Horman, M.J., Orosz, M.P., and Riley, R.D. (2006). "Sequence Planning for Electrical Construction." Journal of Construction Engineering and Management, 132(4), pp. 363-372.   DOI
12 Kim, D.W., An, S.H., Cho, H., Jeong, J.W., Lee, B.H., Doh, N.L., and Kang, K.I. (2009). "Development of conceptual model of construction factory for automated construction." Building and Environment, 44(8), pp. 1634-1642.   DOI
13 Koo, B. (2008). "Analyzing Site Reliability for Residential, Civil and Plant Projects using Lean Construction Principles." Journal of The Korean Society of Civil Engineers, 28(5D), pp. 655-664.
14 Ko, Y.J., and Cha, H.S. (2011). "A Development of Project Performance Predicting System (PPS) considering Construction Project Characteristics." Korean Journal of Construction Engineering and Management, KICEM, 12(1), pp. 62-72.   DOI
15 Lee, H. (2006). "An Improvement Scheme of Process Quality in The Korean Building Projects." Journal of the Korean Association for Spatial Structures, 6(3), pp. 51-57.
16 Lee, H.S., Lee, B.N., Kim, W.Y., Yoo, J.H., and Song, S.H. (2005). "A Study on the Evaluation of PMIS and Development Strategy for Construction Companies." Korea Institute of Construction and Industry, p. 121.
17 Menches, C.L., and Hanna, A.S. (2006). "Conceptual Planning Process for Electrical Construction." Journal of Construction Engineering and Management, 132(12), pp. 1306-1313.   DOI
18 Nasr, Z.J.B. (2009). "Electrical Project Management Model." The University of Texas at Austin, Austin.
19 Park, J.I. (2005). Technical Status of Building Equipment Korean Society for Mechanical Engineering lecturers and other publications, pp. 5-19.
20 Reder AD. Cost model for reinforced concrete beam and slab structures in building [dissertation]. Fort Collins: Colorado State University; 2005. pp. 150.
21 Ryu, H.G., and Son, B.S. (2010). "Problems and Suggestions for Improvement Derived from an Analysis of the Work of the Urban & Residence Environment Improvement Project-Focused on the Establishment of Preparation Committee and Association Committee." Journal of the Korea Institute of Building Construction, 10(3), pp. 39-47.   DOI
22 Singh, S. (1990). "Cost model for reinforced concrete beam and slab structures in buildings." Journal of Construction Engineering and Management, 116(1), pp. 54-67.   DOI
23 Wilson AJ. Experiments in probabilistic cost modelling (1983). In: Brandon PS, editor. Building Cost Techniques; New Direction. London: E&FN Spon, pp. 169-80.
24 Yu, I.H., Jung, Y.S., Chin, S.Y., and Kim, K.R. (2006). "Analysis of quantified characteristics of the performance indicators for construction companies." Korean Journal of Construction Engineering and Management, KICEM, 7(4), pp. 154-163.
25 Ballard, G., Harper, N., and Zabelle, T.R. (2003). "Learning to see work flow: an application of lean concepts to precast concrete fabrication." Engineering Construction and Architectural Management, 10(1), pp. 6-14.   DOI
26 Arena, P., Caponetto, R., Fortuna, L., and Xibilia, M. G. (1992). "Genetic algorithms to select optimal neural network topology." In Circuits and Systems, Proceedings of the 35th Midwest Symposium on, pp. 1381-1383.
27 Ashworth A. Cost studies of buildings (1999). Harlow:Addison Wesley Longman Ltd, 3rd ed. UK, p. 444.
28 Ballard, G. (2000). "Lean project delivery system." Lean Construction Institute White, Lean Construction Institute, Ketchum, Id., p. 8.
29 Ballard, G., and Howell, G. (1998). "Shielding Production: Essential Step in Production Control." Journal of Construction Engineering and Management, 124(1), pp. 11-17.   DOI