• 제목/요약/키워드: unit cost contract

검색결과 43건 처리시간 0.025초

석면해체공사의 적정 단가 산정 (Making Formular to calculate Reasonable Unit Cost for Asbestos Removal)

  • 손기상;박종태;갈원모
    • 대한안전경영과학회지
    • /
    • 제13권3호
    • /
    • pp.55-61
    • /
    • 2011
  • Unit cost for asbestos removal work which have been made out at government contract award for recent three years has been reviewed and shown with table. And the cost have been compared with ones made out by two agencies, American asbestos removal specialists, government ministry for making out comparison tables. First, legal and practical work status survey have been made to determine reasonability of introducing separate contract-awarding system, as a part of ensuring reasonable unit work cost. And then, two different status have been compared and there in introduction possibility of separate contract-awarding system, it is found out. In interior removal work case, it is thought that 50% by owner, 60% unit work cost by the expert of which removal specialist think as reasonable unit cost. the results for exterior and spray work method are shown with almost same context. Impact factors for determining unit work cost such as project mount, project kind, contract-awarding method, subcontract method have been compared with parties. Removal specialist and expert group have almost same ideas for project amount which has been hightestly weighed but owner's recognition has partially lower than specialists idea. There are almost no difference of recognition between three(3) parties for project kind. Idea comparison of reasonable unit work cost for asbestos removal work between three concerned parties has been analyzed and found out that expert group do unit work cost, 65% of which removal specialists estimate, in interior tex removal. And there is almost no difference between them in exterior roof slate removal. But there is considerable difference between them that owner estimates 50% unit cost of specialist one while expert group estimate 50% of specialist idea of unit removal cost.

서울시내 고등학교 위탁급식의 재무성과 분석을 통한 급식비 및 투자비의 적정 수준 산정 (Income Statement Analysis and Developing the Guidelines of Meal-pricing and Facilities Investment Cost in Contract-Managed High School Foodservice in Seoul)

  • 양일선;현성원;김현아;신서영;조미나;박수연;차진아;이보숙
    • Journal of Nutrition and Health
    • /
    • 제36권5호
    • /
    • pp.528-535
    • /
    • 2003
  • The purposes of this study were: 1) to investigate the operational and financial characteristics of contract-managed high school food services in Seoul, 2) to analyze the financial performance of high school food services 3) to develop guidelines for meal pricing and facilities investment costs. From Oct to Nov 2001, questionnaires were mailed to 249 high schools that were managed by contract food service companies. A 40.2% response rate was recorded. The results of this study were as follows: 1. Student enrollment in high schools run by contract-managed food services was 1,518, with a 68.5% participation rate in the school lunch program. The average meal price was 2,141 won. 2. Based on the income statement analysis, average total sales were 410,440,504 won and average net profit was 16,098,558 won. 3. The optimum food cost per meal was 1,200-1,300 won per meal, calculating using the methods of conversion factor, RDA (Recommended Daily Allowance), and nutrient exchange unit. 4. Guidelines for meal pricing were developed using the modified actual pricing method based on facilities investment cost, number of meals and food cost. The ratio of labor cost, general management expenses and ordinary profit were adopted from the schools with liability. The food cost, depreciation and interest cost were calculated based on unit meal. 5. The guideline for facilities investment was developed based on the number of meals, meal price and food cost. The guideline included the maximum facilities investment cost paid by the contract food service management company. (Korean J Nutrition 36(5): 528∼535, 2003)

건축주가 직접 발주한 석면해체공사 도급의 타당성에 관한 연구 (Practical Reasonability for Introducing Separate Contract Award System Concerning Asbestos Removal)

  • 손기상;갈원모;김형석
    • 대한안전경영과학회지
    • /
    • 제13권2호
    • /
    • pp.259-266
    • /
    • 2011
  • Project owner, asbestos removal specialist, experts on asbestos removal work, as counter parts to be defined in the study to make out research goals have been asked with questionnaire survey and replied with 65, 275, 32 cases, respectively. And additionally, direct interview 73 sheets have been collected to find out current status of required engineers and equipments assigned and provided to the field, from them, three(3) concerned parties. Questionnaire subjects are composed of common items, reasonable unit cost, need of separate contract-awarding system, status of performing standard contract, status of providing legal engineers and equipments. Concentrated review of two~three questions by subject has been made to find out and compare idea results between three(3) concerned parties. First, legal and practical work status survey have been made to determine reasonability of introducing separate contract-awarding system, as a part of ensuring reasonable unit work cost. And then, two different status have been compared and there is introduction possibility of separate contract-awarding system, it is found out. The possibility of separate contract also has been confirmed by comparison of domestic legal grounds. Justificating grounds to introduce separate contract-awarding system have been shown. Standard contract status between asbestos removal specialists has been compared using two cases of providing removal work contract and receiving it. It is shown that case of 50 percent or less contains 38.5% when they receive contract, but only 10 percent reduction of original contract amount has been made when they provide it. It means that asbestos removal specialists do not keep occupational safety and health regulations.

소규모 건설 프로젝트에서의 공사예비비 산정방법에 관한 연구 (A Study on Estimating the Contingency Cost of Small Construct Project)

  • 송진우;표영민;박성호;이상범
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2004년도 학술.기술논문발표회
    • /
    • pp.113-117
    • /
    • 2004
  • We need the contingency cost in order to deal with the uncertainty to be accompanied inevitably at the construction and an every kind risk not to forecast in advance. And also the contingency colt needed for the change order and we need it for reduction of the delay and reduce the trouble between owner and constructor. This study, through checking and analyzing the risk factor, in the step of domestic construction, suggests optimal management reserve to specific business about the contract type and the scale. The main results of this research are summarized as follow. First, I investigated the recognition about the contingency cost, grasped the risk to be happened at the construction step and found out the frequency occurrence, through making up question to engineer are carrying out their job in the domestic construction. Second, I computed optimal contingency cost rate by the statistics investigation, and proposed an improvement plan and problem when compute a contingency cost.

  • PDF

아파트 재건축사업의 수익성평가에 대한 확률적 위험도 분석 모형 적용방안 (Application of Probabilistic Risk Analysis for Profitability-Evaluation of Apartment Reconstruction Projects)

  • 우광민;이학기
    • 한국건설관리학회논문집
    • /
    • 제7권5호
    • /
    • pp.167-176
    • /
    • 2006
  • 현재 재건축사업은 추진 의사결정과 관련한 확정된 지표나 기준이 없이 막연한 수익성에 대한 기대를 토대로 시행되고 있으며, 사업시행과정 에서 직면하게 되는 제반 위험 에 대해 경험 적으로 대응하고 있는 실정이다. 또한 재건축조합이나 시공예정 회사들이 제공하는 관리처분계획에 포함된 수익성에 관한 정보는 결정론적 분석을 통한 단순한 예측에 불과하여 재건축을 시행하는 과정에서 결과가 수정되는 것이 일반적이다. 즉 수익성에 대한 예측이 재건축시행 과정상의 유동적인 상황에서 변경됨에 따라 예측결과에 대한 신뢰도는 근본적으로 내 외적인 한계를 갖고 있다. 본 연구는 재건축사업의 수익성에 영향을 미치는 변수들을 확률적으로 평가하여 수익과 위험을 동시에 분석하는 수익성예측모델을 개발하고, 사례연구를 통해 개발모델의 적합성을 검증하여 기존의 결정론적 접근방식이 갖는 한계를 극복하고자 한다.

병원급식 위탁계약에 대한 병원과 위탁회사의 견해 비교 분석 (Comparative Analysis on the Perspectives of Hospitals and Contractors on Items related with Contracting Hospital Foodservice Management)

  • 김현아;김진수;양일선;박문경;박수연
    • 대한영양사협회학술지
    • /
    • 제10권3호
    • /
    • pp.293-299
    • /
    • 2004
  • The purposes of this study were to : a) investigate the current status of contracted hospital food services, b) analyze and clarify various perspectives of contractors and hospitals. Thirty six hospitals and their contractors which were having more than 100 beds located in Seoul, Inchon and Kyungkido, were the subjects of this study. Data were collected through surveys. The survey was conducted during March to April in 2002. Questionnaires were mailed to the 36 directors of dietetic departments of hospitals and 36 managers of contract foodservice management company. Statistical analysis was completed using SPSS Win(11.0) for descriptive analysis, t-test and $x^2$-test. The results of the study can be summarized ; 1. The type of contract considered adequate by directors of dietetic departments and managers of contractors was fee-contract, combined type, followed by profit-and-loss contract. 2. According to the results from analysis on the contract cost per meal considered adequate by directors of dietetic departments and managers, the directors of dietetic department indicated that showing no difference with the current contract cost per meal. However, the managers of contractor indicated that showing significant differences compared with the current contract cost per meal(regular diet p<0.01, therapeutic diet p<0.001). 3. In the composition of contract cost per meal considered adequate, the managers of contracting businesses accounted labor cost (p<0.01) as a major cost, whereas the chiefs of nutrition departments accounted miscellaneous or controllable expense (p<0.001) and VAT (p<0.01) as major costs. 4. The directors of dietetic departments and managers thought that the hospital should be responsible for utility costs. On the other hand, directors of dietetic departments regarded that the contractor and managers thought that the hospital should pay for facility investment cost.

  • PDF

병원급식 위탁관리의 운영 실태조사 (A Study on the Status of Contract Managed Hospital Food Services)

  • 김진수;양일선;김현아;박문경;박수연
    • 대한영양사협회학술지
    • /
    • 제9권2호
    • /
    • pp.128-137
    • /
    • 2003
  • The purposes of this study were to investigate the current status of contracted hospital food services and to find out the difference in accordance with the number of beds in hospitals. Thirty six hospitals having more than 100beds in Seoul, Inchon and Kyungkido were the subjects of this study. Data was collected through surveys. The survey was conducted during March and April in 2002. The Questionnaires were mailed to the 36 directors of dietetic departments of the hospitals and 36 managers of contracting patient food services. Statistical analysis was completed using SPSS Win(11.0) for descriptive analysis and t-test. The results of the study are summerized as follows; Ⅰ. Hospital perspective : The range covered by contract food service was 63.3% and 36.7% in hospital food services, and medical nutrition services. The patient and employee food services were in 83.3%, and patient food services were in 6.7%. The methods selecting contractors are general, limited, selected and competitive biddings, and private contracts. The responsibility for supervision of contract food services was the dietetic department (51.7%) in most cases. Hospitals having personnel responsible for contracting affairs were in 75.9% of the cases and 24.1% did not have personnel. The biggest reason for contracting was facilitation of personnel management. The most important criteria on selecting food services contractors was the professionality of the contractor. Ⅱ. Contractor's perspective : The cost per meal in the year 2001 was composed of 1,905 won for food cost, 1,081 won for labor cost, 222 won for expenses, 114 won for VAT, 14 won for rent and 146 won for miscellaneous or controllable expense, representing 109 won loss per meal. The profit-and-loss contract cost is higher than the fee-contract cost. The ratios of food cost, labor cost and expenses are higher and the ratios of miscellaneous or controllable expense, VAT, rent and profit are lower in hospitals with more than 400 beds compared with those less than 400 beds. However, no significant differences are present between these two groups of hospitals. The actual contract period was 2.2 years upon initial contract and 1.2 years upon renewal. The initial investment cost was 53 million won and the cost of renovation and repair was 8.5 million won. Significant differences were present between two groups of hospitals. The conditions of employment and number of personnel hired by contractors for contract patient food services were significantly different according to the number of beds.

  • PDF

Multi-Area Unit Commitment with Bilateral Contract Approach in Deregulated Electricity Market

  • Selvi, S.Chitra;Devi, R.P.Kumudini;Rajan, C.Christober Asir
    • Journal of Electrical Engineering and Technology
    • /
    • 제4권3호
    • /
    • pp.346-352
    • /
    • 2009
  • The eventual goal of this paper is to help the generating companies and load-serving entities to choose appropriate relative levels of interconnected system versus bilateral trades while considering risk, and economic performance. In competitive power markets, electricity prices are determined by balance between demand and supply in electric power exchanges or bilateral contracts. The problem formulation is bilateral contract incorporated into Multi-area unit commitment with import/export and tie-line constraints. This proposed method considers maximizing own profit or minimize the operating cost among the generating companies in multi-area system. The feasibility of the proposed algorithm has been demonstrated using IEEE system with four areas and experimental results shows that proposed method is reliable, fast and computationally efficient

약정 위약금 규제와 단말기 보조금 차별금지의 실효성 (Efficacy of Mobile Device Distribution Improvement Act : Long-term Contract and Cap Regulation on Breach Fee)

  • 김원식
    • 한국IT서비스학회지
    • /
    • 제15권1호
    • /
    • pp.81-96
    • /
    • 2016
  • This study analyzes how breach fee under long-term contract and/or cap regulation on the breach fee can affect the impacts of "Mobile Device Distribution Improvement Act" on handset bundle price, average revenue per unit (ARPU), and social welfare. We conduct comparative analysis with an economic model of duopoly competition in price when users are under long-term contract and the breach fee can be regulated. The results show that the Act lowers the equilibrium prices, lower than incumbent price without the Act. Price of non-dominant Mobile Network Operator (MNO) can be lower than poaching price without the Act if significant portion of switching cost is breach fee or the market is significantly asymmetric. Under the significant circumstances, the Act can raise ARPU even though it improves social welfare. By contrast, the Act increases consumer surplus without affecting social welfare if breach fee is the only source of user's switching cost and is capped by the regulation, and more symmetric market and the stronger cap leads to higher consumer surplus.

소규모 건축공사의 적정 실적공사비 단가보정 모델 개발 (Development of an Unit Cost Modification Model for Proper Actual Cost Data in Small Building Construction Projects)

  • 김강식;현창택;홍태훈;조성민;문현석
    • 한국건축시공학회지
    • /
    • 제10권1호
    • /
    • pp.81-89
    • /
    • 2010
  • 정부는 2004년부터 원가산정체계를 실적공사비 중심으로 전환하였다. 이러한 실적공사비는 계약단가를 기준으로 산정되며, 현재 10억원 이상의 공공 건설공사에 적용되고 있다. 그러나 대형공사 위주의 평균단가로 구성되어 있는 실적공사비를 10억원 미만의 소규모 건축공사에 직접적으로 반영하게 됨으로써 소규모 건축공사의 실행금액이 계약금액 이상으로 증가되는 경우가 빈번히 발생하고 있다. 뿐만 아니라, 이에 따른 영업이익의 감소로 기업운영 및 생산성 등에 악영향을 미치는 등과 같은 여러 문제들이 야기되고 있다. 따라서 10억원 미만의 소규모 건축공사에 실적공사비를 적용하기 위해서는 사업의 규모 등을 반영할 수 있는 단가보정 방안이 있어야 한다. 이에 본 연구에서는 실적공사비를 10억원 미만의 소규모 건축공사에 적용하는데 발생할 수 있는 단가적용의 문제를 해결하기 위하여 실적단가를 보정할 수 있는 실적공사비 단가보정 모델을 개발하였다. 이 모델은 소규모 건축공사의 생산성과 적정한 이윤을 책정하는데 도움을 줄 수 있으며, 소규모 건설업체의 경영이 악화되는 것을 방지할 수 있을 것으로 판단된다. 그리고 발주처는 예산편성 시 현실성 있는 공사비를 확보할 수 있을 것으로 기대된다.