Development of an Unit Cost Modification Model for Proper Actual Cost Data in Small Building Construction Projects  

Kim, Kang-Shik (중앙선거관리위원회)
Hyun, Chang-Taek (서울시립대학교 건축학부)
Hong, Tae-Hoon (연세대학교 건축공학과)
Jo, Seong-Min (서울시립대학교 건축공학과)
Mun, Hyun-Seok (서울시립대학교 건축공학과)
Publication Information
Journal of the Korea Institute of Building Construction / v.10, no.1, 2010 , pp. 81-89 More about this Journal
Abstract
Since 2004, the government has changedthe cost estimate system to one of an actual cost basis in order to calculate the optimum construction cost by reflecting changes in circumstance on the construction site in a timely manner. Currently, this is being applied to public construction work forover a billion won of actual cost data in estimation by contract unit cost. However, directly reflecting actual cost, which for large-sized construction work was originally an average unit cost, to a small building, entails the application of a low discount rate for the cost of materials, labor, etc. and therefore can frequently give rise to cases in which the actual cost of work performed exceeds the contract sum, which in turn causes problems such as decreased revenues, bad effectson business operation, productivity, etc. Therefore, to apply actual cost to small-sized construction work (less than a billion won), there should be a plan to modify unit cost in a manner that can reflect project scale, etc. in order to resolve the problem of unit cost application of actual cost to small-building construction projects. The unit cost modification model for proper actual construction cost in small-scale construction projects developed by this study will help to increase the relevant productivity and proper gain, preventing the aggravation of business operations. Organizations placing orders are also expected to be able to secure a more realistic construction cost in arranging the budget.
Keywords
Small-Building Construction Projects; Actual Cost; Unit Cost Modification Model; Regression Analysis;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 대한건설협회, 2007년도 완성공사원가구성분석, 2008
2 손용석, 심인보, 권재성, 전상훈, 현창택, 구교진, 실적자료 분석을 통한 공동주택공사 노무량 예측 회귀모델, 한국건설관리학회논문집, 한국건설관리학회, 제7권 제5호, 85-93, 2006   과학기술학회마을
3 이학식, 임지훈, SPSS 14.0 매뉴얼, 법문사, 2008
4 이현종, 효율적인 실적공사비 축적 방안에 관한 연구, 서울시립대학교 석사학위논문, 2003
5 전석한, 실적공사비 산정시스템에 관한 연구, 명지대학교 박사학위논문, 2004
6 조달청, 고품격 공공시설물 확보를 위한 정부공사제도 개선방안, 2007
7 최석인, 이복남, 이승우, 최민수, 실적공사비제도의 평가와 개선방안(II), 한국건설산업연구원, 2006
8 한국건설기술연구원, 실적공사비 축적 및 적용방안 연구, 건설교통부, 1998
9 한국건설기술연구원, 하반기 건설공사 실적공사비 적용 공종 및 단가, 국토해양부, 2008
10 국가통계포털, http://www.kosis.kr.
11 김병수, 최저가낙찰제 및 실적공사비적산 환경에서의 대응방안, 춘계학술발표대회 논문집, 한국구매조달학회, pp.1-18, 2006
12 김선국, 공공건축시설 실적자료에 의한 통계적 코스트모델에 관한 연구, 경희대학교 석사학위논문, 2006
13 김성환, 문경직, 우유미, 구교진, 현창택, 중.소규모 건축공사의 선택적 건설사업관리 적용 방안, 한국건설관리학회 학술발표대회 논문집, 한국건설관리학회, pp.305-309, 2006