Practical Reasonability for Introducing Separate Contract Award System Concerning Asbestos Removal  

Son, Ki-Sang (Department of Safety Engineering, Seoul National University of Science and Technology)
Gal, Won-Mo (Department of Environmental Health and Safety, Eulji University)
Kim, Hyoung-Suk (Korea Occupational Safety and Health Agency)
Publication Information
Journal of the Korea Safety Management & Science / v.13, no.2, 2011 , pp. 259-266 More about this Journal
Abstract
Project owner, asbestos removal specialist, experts on asbestos removal work, as counter parts to be defined in the study to make out research goals have been asked with questionnaire survey and replied with 65, 275, 32 cases, respectively. And additionally, direct interview 73 sheets have been collected to find out current status of required engineers and equipments assigned and provided to the field, from them, three(3) concerned parties. Questionnaire subjects are composed of common items, reasonable unit cost, need of separate contract-awarding system, status of performing standard contract, status of providing legal engineers and equipments. Concentrated review of two~three questions by subject has been made to find out and compare idea results between three(3) concerned parties. First, legal and practical work status survey have been made to determine reasonability of introducing separate contract-awarding system, as a part of ensuring reasonable unit work cost. And then, two different status have been compared and there is introduction possibility of separate contract-awarding system, it is found out. The possibility of separate contract also has been confirmed by comparison of domestic legal grounds. Justificating grounds to introduce separate contract-awarding system have been shown. Standard contract status between asbestos removal specialists has been compared using two cases of providing removal work contract and receiving it. It is shown that case of 50 percent or less contains 38.5% when they receive contract, but only 10 percent reduction of original contract amount has been made when they provide it. It means that asbestos removal specialists do not keep occupational safety and health regulations.
Keywords
project owner; asbestos removal specialists; separate contract-awarding system;
Citations & Related Records
연도 인용수 순위
  • Reference
1 변상훈 외 2인, 석면해체.제거 공사 단가 설정 및 합리적 적용 방안 연구 , 한국산업안전보건공단, 2009.
2 송태협 외 2인, 석면 해체 공사비용 산정에 관한 연구 , 대한건축학회 학술발표대회 논문집, 2009.
3 김동일 외 1인, 석면 해체.제거업체의 법규 준수에 대한 인식 및 태도 , 한국실내환경학회지, 2009.
4 기계설비공사 분리발주 타당성, 대한설비건설협회, 2008.
5 정보통신공사 분리발주제도 존치 건의 , 한국정보통신공사협회, 2008.
6 전기공사 분리발주제도 실태조사 보고서 , 전기공사협회, 2006.
7 김성일 외 2인, 정부공사 발주제도의 다양화 방안 연구 , 국토연구원, 2002.
8 JICOSH. Ordinance on Prevention of Health Impairment due to Asbestos , JAPAN. 2007
9 South Carolina Code of Laws. South Carolina Consolidated Procurement Code , US. 2009
10 WISHA. State Asbestos Regulation and Guidance , US. 2010
11 Communities and Local Government. Planning, building and the environment , UK. 2010