• Title/Summary/Keyword: the methods of connection

Search Result 1,367, Processing Time 0.025 seconds

Uncertainty assessment of industrial platinum resistance thermometers for different lead-wire connection methods (산업용 백금저항온도센서의 결선방식에 따른 측정불확도 평가방법)

  • Kim, Yong-Gyoo;Gam, Kee-Sool;Yang, In-Seok
    • Journal of Sensor Science and Technology
    • /
    • v.18 no.4
    • /
    • pp.322-326
    • /
    • 2009
  • To estimate the measurement uncertainty for industrial platinum resistance thermometers(IPRTs) made with 3-wire connection, the immersion temperature profile was investigated using a liquid bath. Two types of IPRTs having lead wires made of silver and nickel were constructed and the immersion profiles were measured at temperatures from -50 $^{\circ}C$ to 250 $^{\circ}C$ using 3-wire and 4-wire method. As immersion depth and temperature increased, the resistances measured by 3-wire method increased linearly but not for 4-wire method. To calibrate a 3-wire IPRT, the immersion effect must be accounted for. We propose a linear equation to assess correctly the measurement uncertainty.

Assessment of Connection Strength and Frictional Characteristic for The Segmental Retaining Wall Unit (보강토 옹벽 전면블록의 연결강도 및 마찰특성 평가)

  • Kim, Jin-Man;Cho, Sam-Deok;Oh, Se-Yong;Lee, Dae-Young
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.1562-1571
    • /
    • 2005
  • The use of geogrid for SRW systems and bridge abutment has increased rapidly over the past 10 years in Korea. The concept of segmental retaining walls and reinforced soil is very old and for example The Ziggurats of Babylonia(i.e. Tower of Babel) were built some 2,500 to 3,000 years ago using soil reinforcing methods very similar to those described in current design. Modern SRW(Semental Retaining Wall) units were introduced in 1960's as concrete crib retaining wall systems. In this paper, the friction properties between segmental concrete units and geogrid are investigated by performing various tests.

  • PDF

A Survey and Proposal of Technical Method for Solving Chatting, Image Chatting Analysis of Chatting Problems (채팅, 화상 채팅의 실태 분석 및 기술적 해결 방안의 제안(I)-실태 분석을 중심으로-)

  • 조동욱;이지혜;이선주;민병찬;한대복;이구범;박범진;김동우;오석근
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2004.05a
    • /
    • pp.35-39
    • /
    • 2004
  • This research describes the survery and analysis of chatting, image chatting sites. For this, serveral investigations have done for analyzing the menu, numbers of connection, numbers of generation, numbers of sexual connection in the domestic representative chatting sites and image chatting sites. Also Q&A has done for analyzing chatting sites problems directly, Finally, the solving methods is discussed.

  • PDF

The Effect of Construction Methods on Geothermal Exchange Rates of Cast-in-place Energy Piles (현장타설말뚝형 에너지 파일의 시공형태별 지중 열교환량에 관한 연구)

  • Park, Yong-Boo;Nam, Yu-Jin;Sim, Young-Jong;Sohn, Jeong-Rak
    • Land and Housing Review
    • /
    • v.3 no.2
    • /
    • pp.169-175
    • /
    • 2012
  • In recent, there are many studies associated with energy piles to save initial construction cost for ground source heat pump system. In this study, to evaluate geothermal exchange rates two types (a connection type and a slinky type) of cast-in-place energy piles (PRD, 4.5m in depth, 1,200 mm in diameter) were constructed for the tests and their efficiencies were compared with numerical analysis results. As a result, starting with operation, geothermal exchange rate gradually decreases due to exchange of lower ground temperature. In the case of connection type, temperature difference is $0.37^{\circ}C$ in heating mode and $0.34^{\circ}C$, in cooling mode, respectively. In addition, in case of a connection type, geothermal exchange rate in heating mode is 2,314W/m and in cooling mode, 252.2W/m whose value is 9% higher than in heating mode. In the case of slinky type, the average geothermal exchange rate in heating mode is 168.0W/m, which is about 27% lower than that of connection type.

Shape Decision and Shear Experiment of High-Shear Ring Anchor for Steel-Concrete Connection (강재 접합용 고전단 링앵커의 형상 개발과 전단실험)

  • Jeon, Sang Hyeon;Kim, Mun-Kil
    • Journal of Urban Science
    • /
    • v.7 no.2
    • /
    • pp.29-36
    • /
    • 2018
  • The demand for reinforcement in accordance with remodeling, seismic retrofit, and change of use of the existing structure is increasing. Originally, shear wall new and extension method has been adopted a lot as seismic retrofit methods. Recently, dry seismic retrofit method that uses structural steel is mostly adopted in order to minimize spatiotemporal aspect and underpinning that occurs when a construct shear wall. We redesigned the form of old and new concrete joint high-shear ring anchor that was developed according to recent reinforcement method and determined construction method. Shear tests were performed on High-Shear Ring Anchor for steel-concrete connection. Comparison with 4 tests shows that the average of test-to-prediction ratios is 1.01.

On the Comparison of Call Overload Control Methodologies in ATM Networks (ATM 통신망에서의 호 과부하 제어방식 비교)

  • Song, Ki-Sang;Lee, Jean
    • IE interfaces
    • /
    • v.9 no.3
    • /
    • pp.168-179
    • /
    • 1996
  • Automatic repeated recalling from individual computing equipments such as PC and workstations, to access ATM networks may result in call overload to networks. Call overload causes to waste network resources and fail to meet user call processing QoS requirements. We evaluate two call connection request methods: the back-off recall method(BRM) which makes recall with random waiting time after rejection, and the direct recall method(DRM) which repeats call connection request whenever call request is rejected. We evaluate their performances by simulation and it shows that as the total number of attached terminals to each access node increases, BRM performs better than DRM in terms of the call acceptance level and effective network bandwidth utilization.

  • PDF

New approach to dynamic load balancing in software-defined network-based data centers

  • Tugrul Cavdar;Seyma Aymaz
    • ETRI Journal
    • /
    • v.45 no.3
    • /
    • pp.433-447
    • /
    • 2023
  • Critical issues such as connection congestion, long transmission delay, and packet loss become even worse during epidemic, disaster, and so on. In this study, a link load balancing method is proposed to address these issues on the data plane, a plane of the software-defined network (SDN) architecture. These problems are NP-complete, so a meta-heuristic approach, discrete particle swarm optimization, is used with a novel hybrid cost function. The superiority of the proposed method over existing methods in the literature is that it provides link and switch load balancing simultaneously. The goal is to choose a path that minimizes the connection load between the source and destination in multipath SDNs. Furthermore, the proposed work is dynamic, so selected paths are regularly updated. Simulation results prove that with the proposed method, streams reach the target with minimum time, no loss, low power consumption, and low memory usage.

A MESH INDEPENDENCE PRINCIPLE FOR PERTURBED NEWTON-LIKE METHODS AND THEIR DISCRETIZATIONS

  • Argyros, Ioannis K.
    • Journal of applied mathematics & informatics
    • /
    • v.7 no.1
    • /
    • pp.139-159
    • /
    • 2000
  • In this manuscript we study perturbed Newton-like methods for the solution of nonlinear operator equations in a Banach space and their discretized versions in connection with the mesh independence principle. This principle asserts that the behavior of the discretized process is asymptotically the same as that for the original iteration and consequently, the number of steps required by the two processes to converge to within a given tolerance is essentially the same. So far this result has been proved by others using Newton's method for certain classes of boundary value problems and even more generally by considering a Lipschitz uniform discretization. In some of our earlierpapers we extend these results to include Newton-like methods under more general conditions. However, all previous results assume that the iterates can be computed exactly. This is mot true in general. That in why we use perturbed Newton-like methods and even more general conditions. Our results, on the one hand, extend, and on the other hand, make more practical and applicable all previous results.

FIT OF FIXTURE/ABUTMENT INTERFACE OF INTERNAL CONNECTION IMPLANT SYSTEM (내측연결 임플란트 시스템에서 고정체와 지대주 연결부의 적합에 관한 연구)

  • Lee Heung-Tae;Chung Chae-Heon
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.42 no.2
    • /
    • pp.192-209
    • /
    • 2004
  • Purpose : The purpose of this study was to evaluate the machining accuracy and consistency of implant/abutment/screw combination or internal connection type. Material and methods: In this study, each two randomly selected internal implant fixtures from ITI, 3i, Avana, Bicon, Friadent, Astra, and Paragon system were used. Each abutment was connected to the implant with 32Ncm torque value using a digital torque controller or tapping. All samples were cross-sectioned with grinder-polisher unit (Omnilap 2000 SBT Inc) after embeded in liquid unsaturated polyester (Epovia, Cray Valley Inc). Then optical microscopic and scanning electron microscopic(SEM) evaluations of the implant-abutment interfaces were conducted to assess quality of fit between the mating components. Results : 1) Generally, the geometry of the internal connection system provided for a precision fit of the implant/abutment into interface. 2) The most precision fit of the implant/abutment interface was provided in the case of Bicon System which has not screw. 3) The fit of the implant/abutment interface was usually good in the case of ITI, 3I and Avana system and the amount of fit of the implant/abutment interface was similar to each other. 4) The fit of the implant/abutment interface was usually good in the case of Friadent, Astra and Paragon system. The case of Astra system with the inclined contacting surface had the most Intimate contact among them. 5) Amount of intimate contact in the abutment screw thread to the mating fixture was larger in assembly with two-piece type which is separated screw from abutment such as Friadent, Astra and Paragon system than in that with one-piece type which is not seperated screw from abutment such as ITI, 3I and Avana system. 6) Amount of contact in the screw and the screw seat of abutment was larger in assembly of Friadent system than in asembly of Astra system of Paragon system. Conclusion: Although a little variation in machining accuracy and consistency was noted in the samples, important features of all internal connection systems were the deep, internal implant-abutment connections which provides intimate contact with the implant walls to resist micro-movement, resulting in a strong stable interface. From the results of this study, further research of the stress distribution according to the design of internal connection system will be required.

Finite element analysis on the connection types of abutment and fixture (수종의 내부연결형 임플란트에서 연결부의 형태에 따른 응력분포의 유한요소 분석)

  • Jung, Byeong-Hyeon;Lee, Gyeong-Je;Kang, Dong-Wan
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.50 no.2
    • /
    • pp.119-127
    • /
    • 2012
  • Purpose: This study was performed to compare the stress distribution pattern of abutment-fixture connection area using 3-dimensional finite element model analysis when 5 different implant systems which have internal connection. Materials and methods: For the analysis, a finite element model of implant was designed to locate at first molar area. Stress distribution was observed when vertical load of 200 N was applied at several points on the occlusal surfaces of the implants, including center, points 1.5 mm, 3.0 mm away from center and oblique load of 200 N was applied $30^{\circ}$ inclined to the implant axis. The finite element model was analyzed by using of 3G. Author (PlassoTech, California, USA). Results: The DAS tech implant (internal step with no taper) showed more favorable stress distribution than other internally connected implants. AS compare to the situations when the loading was applied within the boundary of implants and an oblique loading was applied, it showed higher equivalent stress and equivalent elastic strain when the loading was applied beyond the boundary of implants. Regardless of loading condition, the abutments showed higher equivalent stress and equivalent elastic strain than the fixtures. Conclusion: When the occlusal contact is afforded, the distribution of stress varies depending on the design of connection area and the location of loading. More favorable stress distribution is expected when the contact load was applied within the diameter of fixtures and the DAS tech implant (internal step with no tapering) has more benefits than the other design of internally connected implants.