Introduction of BIM Quality Standard for Quantity Take-off (건축 물량산출 활용을 위한 BIM품질기준 도입 방안)

  • Kwon, O-Cheol;Jo, Chan-Won;Cho, Joo-Won
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.2
    • /
    • pp.171-180
    • /
    • 2011
  • As high-rise and irregularly shaped building structures have become a trend at home and abroad, BIM technology is now being developed and accepted widely. However, the BIM data and information generated in the design phase cannot be actively reutilized in the construction stage. This is because the major interests of construction companies include working process and cost estimation, while there is not usually enough BIM data created to support these activities. In order to resolve this issue, we need to set up BIM modeling guides that make it possible to extract correct quantity take-off from BIM data. Quality checks are also necessary to ensure that the resulting BIM data is correct. This study suggests ways of securing BIM quality for correct quantity take-off, which is critical for BIM technology applied to the building construction process and its cost estimation.

Estimation of Construction Equipment Production Rates: Focus on Efficiency Rate (건설기계 시공능력 산정에 관한 연구 : 작업효율 중심으로)

  • Park, Hee-Sung;Han, Ye Lyeong;Huh, Youngki;Ahn, Bang Ryul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.1D
    • /
    • pp.67-72
    • /
    • 2008
  • Heavy equipment is a very important factor for successful construction implementation. Also, the cost for heavy equipment is a major part of construction cost. Therefore, the estimation of equipment cost is a critical job in the construction planning phase. A formula for production rates shown in 'Standard Unit Labor' has been used to estimate construction equipment capability per hour and cost. Although the performance of equipment has been improved, the efficiency rates in the formula are not updated lately. Therefore, this research performed several site visits to measure construction equipment working time and then calculates the efficiency rates for hydraulic backhoe, loader, and dump truck. The results show that the measured efficiencies of backhoe and loader are higher than current ones and vice versa for dump truck. This research proposes the needs for a standardized calculation formula and systematic and long-term data collection and measurement for updating efficiency rates for heavy equipment.

Development of A Lot Quality Assurance and Inspection Cost Estimation System for Process-Centered Inspections (공정 중심의 검사 방식에 대한 로트 품질보증 및 검사비용 추정 시스템 개발)

  • Lee, Do-Kyung;Lee, Seung-Woo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.29 no.1
    • /
    • pp.34-40
    • /
    • 2006
  • Many producers put sampling inspection policy into the way of their convenience. Examples of the convenience are irregular lot size and too small sample size. Because they don't use a standard sampling inspection policy, they can not guarantee the quality level of their products. In this study, we developed a user-centered design program which can calculate the AOQL of their products to their buyers in the case of irregular lot size and too small sample size. Also this program propose a linear inspection cost by Hald's model.

Determination of a Robust Economic Order Quantity Using Taguchi Method (다구찌 방법(方法)을 이용한 경제적(經濟的) 발주량(發注量)의 안정성(安定性) 설계(設計))

  • Choe, Jong-Deok;Seo, Sun-Geun
    • Journal of Korean Society for Quality Management
    • /
    • v.20 no.1
    • /
    • pp.68-79
    • /
    • 1992
  • The economic order quantity(EOQ) is a robust quantity, and it is largely insensitive to reasonable errors in the estimation of most of its parameters. Optimal EOQ and reorder point which are not sensitive to the estimates of the various cost model parameters for Kim and Park's model are determined. This of Taguchi's parameter design which finds a robust EOQ and reorder point using reasonable cost structure on the assumption of normally distributed quality characteristic. A numerical example is also presented to illustrate the proposed procedure and computer aided numerical experiments for selected values of backordered fractions and standard deviations are performed.

  • PDF

Comparative Analysis on Unit Price based on Historical Cost Data Estimating for Large and Small-scale Civil Engineering Works (대·소규모 토목공사의 실적공사비 비교 분석)

  • Hong, Sung Ho;Shin, Juyeoul;Kim, Chang Hak;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1707-1718
    • /
    • 2013
  • Historical cost data estimating system has been introduced since 2004 in the construction industry. Based on contract prices of past projects, this estimating system estimates construction cost according to work types. The Korea Institute of Construction Technology (KICT) announces the historical cost data twice a year annually. The unit price of a small construction project is higher than large construction project due to the increase on production cost per work unit, equipment and labor cost, etc. However, the historical cost data estimating system is applied to project estimation uniformly regardless the construction project's size. This study compared and analyzed the historical cost data of large and small construction project to indicate the problem of historical cost date estimating system. The study derived that the unit price of a small construction project is 21.8% higher than that of large construction project.

A Study on the Time Series Analysis of the Actual Unit Cost based on the Bid Prices (시계열을 이용한 실적단가 예측방안에 관한 연구)

  • Park, Won-Young;Seo, Jong-Won;Kang, Sang-Hyeok;Choi, Bong-Joon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.50-57
    • /
    • 2009
  • The Korea Standard of Estimate which has been used as the only basis of Cost estimate of public construction projects is failed to reflect the fluctuation of current construction cost. Therefore, the government decided to gradually introduce historical construction cost into cost estimate of public construction projects from 2004 and to reduce the use of Korean Standard of Estimate. This paper presents a series of process and the methodology for computing Actual Cost and analyzing the fluctuation patterns based on not only previous contract prices which made a successful bid but also all of the other bid prices. Also, this paper mainly handles a device for extracting strategic bid price such as low price bid for assuring reliable data and for predicting the construction cost which is built by Wavelet Analysis of Time series Analysis data and Neural Network. It is anticipated that the effective use of the proposed process for estimating actual unit cost would make the cost estimation more current and reasonable.

Computer-aided approach of parameters influencing concrete service life and field validation

  • Papadakis, V.G.;Efstathiou, M.P.;Apostolopoulos, C.A.
    • Computers and Concrete
    • /
    • v.4 no.1
    • /
    • pp.1-18
    • /
    • 2007
  • Over the past decades, an enormous amount of effort has been expended in laboratory and field studies on concrete durability estimation. The results of this research are still either widely scattered in the journal literature or mentioned briefly in the standard textbooks. Moreover, the theoretical approaches of deterioration mechanisms with a predictive character are limited to some complicated mathematical models not widespread in practice. A significant step forward could be the development of appropriate software for computer-based estimation of concrete service life, including reliable mathematical models and adequate experimental data. In the present work, the basis for the development of a computer estimation of the concrete service life is presented. After the definition of concrete mix design and structure characteristics, as well as the consideration regarding the environmental conditions where the structure will be found, the concrete service life can be reliably predicted using fundamental mathematical models that simulate the deterioration mechanisms. The prediction is focused on the basic deterioration phenomena of reinforced concrete, such as carbonation and chloride penetration, that initiate the reinforcing bars corrosion. Aspects on concrete strength and the production cost are also considered. Field observations and data collection from existing structures are compared with predictions of service life using the above model. A first attempt to develop a database of service lives of different types of reinforced concrete structure exposed to varying environments is finally included.

Role of Quantity Surveyor and Activities of reeled Associations in Historical Construction Costs Estimation System of Foreign Countries (외국의 실적공사비 제도에서 적산사의 역할과 적산사 협회의 활동현황)

  • Sohn, H.K.;Lee, H.K.;Park, I.P.;Park, M.Y.;Kwon, Y.M.;Seo, S.S.;Kim, K.G.;Kim, J.H.
    • Proceedings of the KIEE Conference
    • /
    • 2004.05b
    • /
    • pp.176-179
    • /
    • 2004
  • When we have been estimated construction costs, till now, we are used to costs accumulating method of each items based on standard labors rates. But there are some problems of its methods. Our governments are applied to a historical construction costs estimation system fur building construction and civil engineering works from January 2004. The electrical construction works are forecasted that applied to historical construction cost estimation systems. This paper is summarized to roles and systems of quantity surveyor. And we investigated to activities and organizations of its associations.

  • PDF

Benefit analysis model of the national map revision program using replacement cost method (대체비용법을 이용한 수치지형도 갱신사업의 편익분석 모형 연구)

  • Son, Hwamin;Yang, Sungchul;Ga, Chillo;Yu, Kiyun;Huh, Yong
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.31 no.1
    • /
    • pp.79-87
    • /
    • 2013
  • This study proposed a method to analyze the economic benefit of the national map revision program using the replacement cost method. The replacement cost method measures the benefit of a project as the minimum cost to replace functions of the project with those of alternative goods or services in an existing market. Thus, the demands on 1/5,000 topographic map revision in 18 administrative tasks such as city and district management planning were surveyed in three local autonomous entities. Then the cost to alternatively fulfill the demands was estimated with the standard construction estimating system for the field surveying and surveying results in commercial GIS companies for the site investigation. With this cost estimation model, the benefit of the current national map revision program to the local autonomous entities was estimated as 265,960,999 won. And cost benefit ratios according to several revision frequencies from 0.5 to 4 year were also compared to find the optimal frequency.

Demolition and Maintenance/Repair Cost Estimation of Road Drop Obstacle for Safety Risk Removal of Anti-tank Defense Facility (대전차 방어시설의 안전위해요소 제거를 위한 낙석 장애물 철거 및 유지보수 비용 산정 연구)

  • Yoo, Yang-Soo;Park, Young Jun;Eun, Hee-Chang;Baek, Jang-Woon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.4
    • /
    • pp.375-382
    • /
    • 2020
  • Rock drop obstacles on major roads in the border area in South Korea has been installed and operated to prevent and block the movement of enemy units. However, the increase in traffic volume due to the development of the border region causes many problems such as road traffic congestion due to rock drop, traffic safety, and impaired urban aesthetics. Therefore, this study aimed to provide guidelines for demolition and replacement facility installation for rock drop obstacles, which are differently applied to each unit, and to suggest the direction of the Ministry of National Defense's policy regarding maintenance cost for necessary rock drop obstacles required for operation. In this study, as part of a guideline study on the removal of rock drop obstacles and the installation of alternative facilities, a standard unit price was suggested for essential rock drop obstacles, so as to be used as judgment data when deciding whether to remove rock drop obstacles.