Role of Quantity Surveyor and Activities of reeled Associations in Historical Construction Costs Estimation System of Foreign Countries

외국의 실적공사비 제도에서 적산사의 역할과 적산사 협회의 활동현황

  • Sohn, H.K. (KERI(Korea Electrotechnology Research Institute)) ;
  • Lee, H.K. (KERI(Korea Electrotechnology Research Institute)) ;
  • Park, I.P. (KERI(Korea Electrotechnology Research Institute)) ;
  • Park, M.Y. (KERI(Korea Electrotechnology Research Institute)) ;
  • Kwon, Y.M. (KECA(Korea Electrical Contractors Association)) ;
  • Seo, S.S. (KECA(Korea Electrical Contractors Association)) ;
  • Kim, K.G. (KECA(Korea Electrical Contractors Association)) ;
  • Kim, J.H. (KECA(Korea Electrical Contractors Association))
  • Published : 2004.05.28

Abstract

When we have been estimated construction costs, till now, we are used to costs accumulating method of each items based on standard labors rates. But there are some problems of its methods. Our governments are applied to a historical construction costs estimation system fur building construction and civil engineering works from January 2004. The electrical construction works are forecasted that applied to historical construction cost estimation systems. This paper is summarized to roles and systems of quantity surveyor. And we investigated to activities and organizations of its associations.

Keywords