A Study on Estimating Method for Actual Unit Cost Based on Bid Prices in Public Construction Projects (시설공사 입찰단가를 활용한 실적단가의 산정 방안에 관한 연구)

  • Kang, Sang-Hyeok;Park, Won-Young;Song, Soon-Ho;Seo, Jong-Won
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.159-166
    • /
    • 2006
  • It was found that Korean Standard of Estimate which has been used as the only basis of cost estimate of public construction projects had some side effects such as jerry-build construction and over-estimation because it failed to reflect the current price and the state-of-the-art construction methods in a changing construction environment. Therefore, the government decided to gradually introduce historical construction cost into cost estimate of public construction projects from 2004. This paper presents analytic criteria and a process model for deducing more current and reasonable historical construction cost for contract items from not only previous contract prices but also all of the other bid prices that were not contracted. The procedure of estimating actual unit cost proposed in this paper focuses on the removal of abnormal values including strategically too low or high prices and the time correction. In addition, basic research is conducted for the correction of actual unit cost through the analysis of fluctuation of bid price depending on bidding types and rates of successful bid. It is anticipated that the effective use of the proposed process model for estimating actual unit cost would make the cost estimation more current and reasonable.

A Study on the Improvement of Optimum Cost Estimation of Cultural Property Utilization Business by Case Study (사례분석을 통한 문화재 활용사업의 적정대가기준 수립에 관한 연구)

  • Lee, Young-Mi;Oh, Se-Wook;Ahn, Bang-Ryul;Park, Hee-Taek
    • The Journal of the Korea Contents Association
    • /
    • v.17 no.4
    • /
    • pp.119-131
    • /
    • 2017
  • The recent cultural properties utilization projects by the Cultural Heritage Administration have no rational standards to pay reasonable prices to stakeholders participating in budget compilation or projects. Therefore, there are frequent conflicts when calculating budgets between the Cultural Heritage Administration supervising projects and local governments or private organizations. Especially, as the items or detailed standard of budget compilation from planning to completion of projects are unclear, it is hard to stably operate projects, and eventually, they are no more than one-shot events without being developed into long-term projects. Thus, this study analyzes the overall operational status, systems, and problems of current cultural properties utilization projects. A national-level budget compilation standard system is then suggested, for the stable operation of cultural properties utilization projects. In addition, this study benchmarks the items and detailed standard of budget compilation used in similar areas, and also puts together actual cases.

A Development of Work Breakdown Structure and Link to Standard Estimation System for 3D Printing Building (건축물 3D 프린팅 공종분류체계 도출 및 표준품셈 연계방안 제시)

  • Ju, Ki-Beom;Seo, Myoung-Bae;Park, Hyung-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.702-708
    • /
    • 2018
  • 3D printing technology is attracting increasing attention as a key technology of the fourth industrial revolution that can change the production paradigm of existing industries. The introduction of construction 3D printing technology has been slower than other industries because of the characteristics of the construction field. On the other hand construction automation using 3D printing is required to reduce the production population, as well as improve productivity and safety. In this study, a construction 3D printing work breakdown structure and link method to a standard estimation system were developed as a preliminary preparation for introducing 3D printing to construction. Based on expert consultation on construction and 3D printing, a hypothetical scenario was developed based on existing construction 3D printing technology. According to the scenario, 16 kinds of works required for 3D printing construction work were derived. The existing work breakdown structure and standard estimation system were analyzed, and the 3D printing work was linked. 3D printing works that were the same as the existing breakdown structure were found, and non-existent works were added to the similar breakdown structure. These results are expected to be helpful for future 3D printing construction management and cost estimation. The actual standard estimation system through 3D printing work will need to be calculated.

Development of a Computer System and Suggestion of Man-Hours for Demolition Cost Estimation (해체공사비 산정을 위한 품산정 기준과 전산시스템의 개발)

  • Kim, Hyo Jin;Kang, Leen Seok;Lee, Dong Wook;Kim, Chang Hak
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.3
    • /
    • pp.1007-1015
    • /
    • 2014
  • The importance of construction waste reusing and recycling is becoming increasingly large because the demolition industry is in current trend to pursue for sustainable growth. As the considering situation of the domestic housing construction and existing house, a scale of demolition industry is expected to be increased continuously. But the related cost regulations that are used in tendering in the demolition industry are insufficient, also the computer system for estimating the demolition costs have not been developed yet. Therefore, in this study suggests man-hours of 21EA items which are utilized to estimate demolition cost and work rate of $1.0m^3$ breaker which is used mostly in domestic demolition industry after analyzing a case study for deconstruction works. The computer system is developed for the estimating demolition cost easily, which are including five modules such as a project information, a unit cost management, a standard unit cost table, a bill of quantity, and a reporting system. This computer system is possible to apply for estimating cost of both mechanical demolition and blasting demolition. The biggest advantage of this system is to estimate cost to utilize standard WBS which is linked with standard unit table and each DB. This can help unskilled users use easily for it.

Integer-Pel Motion Estimation for HEVC on Compute Unified Device Architecture (CUDA)

  • Lee, Dongkyu;Sim, Donggyu;Oh, Seoung-Jun
    • IEIE Transactions on Smart Processing and Computing
    • /
    • v.3 no.6
    • /
    • pp.397-403
    • /
    • 2014
  • A new video compression standard called High Efficiency Video Coding (HEVC) has recently been released onto the market. HEVC provides higher coding performance compared to previous standards, but at the cost of a significant increase in encoding complexity, particularly in motion estimation (ME). At the same time, the computing capabilities of Graphics Processing Units (GPUs) have become more powerful. This paper proposes a parallel integer-pel ME (IME) algorithm for HEVC on GPU using the Compute Unified Device Architecture (CUDA). In the proposed IME, concurrent parallel reduction (CPR) is introduced. CPR performs several parallel reduction (PR) operations concurrently to solve two problems in conventional PR; low thread utilization and high thread synchronization latency. The proposed encoder reduces the portion of IME in the encoder to almost zero with a 2.3% increase in bitrate. In terms of IME, the proposed IME is up to 172.6 times faster than the IME in the HEVC reference model.

Estimating the Price of Standard Waste Bags Using a Structural Model (구조모형을 이용한 적정 종량제 봉투 가격 추정에 관한 연구)

  • Yang, Jun Seok;Choi, Eun Chul;Lee, Sangheon
    • Environmental and Resource Economics Review
    • /
    • v.31 no.1
    • /
    • pp.31-50
    • /
    • 2022
  • This paper estimates the price of standard waste bags that satisfies the polluter pays principle. Unlike previous studies, this paper suggests a method that can find new equilibrium prices using a structural relationship between the demand and cost function for the wastes. To do this, we employ the fixed-point iteration. The main findings of this paper are as follows. Assuming that the polluter pays principle is achieved at the average cost for the waste treatment, the price need to be set at a level about 3.12 times higher than the current one. The estimation result using a structural model, however, shows that the price should be set at a level four times higher than the present. This results are because the quantities reduced of the wastes make the cost per quantity of wastes due to the fixed costs increase. If applying the estimated price to the demand function, the amount of discharge of waste generated nationwide can be reduced by 10%.

The Estimation of Standard Child Care Service Cost in Family Childcare Centers (가정어린이집 표준보육비 산정 연구)

  • Kim, Hye Gum;Lim, Yang Mi;Jo, Hye Young
    • Korean Journal of Childcare and Education
    • /
    • v.9 no.5
    • /
    • pp.37-78
    • /
    • 2013
  • This study aimed to analyze the operating expenses and to estimate the standard child-care service cost in family childcare centers. The subjects were 442 family childcare centers in Korea and the data were analyzed with descriptive statistics by using SPSS 18.0 programs. The main results were as follows. Firstly, as the result of operating expenses analyses of family childcare centers, monthly average staff wages were 5,120,000 won and average general operating costs per month were 5,114,170 won. Therefore, monthly average operating costs of family childcare centers were totally 10,234,170 won. Secondly, the four standard child care service costs were calculated on the basis of the directors holding an additional teacher's position concurrently, whether the additional cooking staff were employed or not, and the type of lunch/snack materials.

A Contribution to the National Economy System of Unpaid Household Labor (무보수 가사노동의 국민경제에 대한 기여도 평가)

  • 문숙재;윤소영;김은희
    • Journal of the Korean Home Economics Association
    • /
    • v.40 no.10
    • /
    • pp.161-176
    • /
    • 2002
  • This study is a basic research for the estimation of the value of unpaid household labor within the national economy system to be reflected in the related policy-making. By measuring economic value of unpaid household labor and estimating the ration to GDP, this study attempted to confirm the productivity of the unpaid household labor and thus contribute to the improvement of socio-economic status of women. Especially, it focused on the development of a standard of estimating unpaid household labor as a method applicable to the present economic and legal system. To organize the method of economic valuation of unpaid household labor and calculate the ration to GDP, this study used three approaches: replacement cost method individual function, replacement cost method generalist and opportunity cost method. Although the estimated result revealed that the economic value of unpaid household labor showed a great extent of deviation according to the estimating methods and the wage rate, total value of household labor ranged from one hundred and thirty eight to two hundred and thirty trillion wens, about 28-48% of GDP in Korea.

Study for Architectural Standard Details Based On BIM Information Framework (BIM 표준프레임워크 기반의 건축 표준상세도면 구축방안)

  • Kwon, Soon-Ho;Lee, Woon-Jae;Jo, Chan Won
    • Korean Journal of Computational Design and Engineering
    • /
    • v.18 no.2
    • /
    • pp.93-103
    • /
    • 2013
  • In the situation where there should be a gap between the design environments of 2D drawing and 3D BIM modeling, it is unavoidable aspect to face confusion caused by parallel usage of both technologies unless the project delivery systems are entirely upgraded to 3D. Therefore, it is critical to make efforts to minimize this confusion. Meanwhile, detailed drawings have very important roles in the construction process because they do not only concretely express construction methods for a given design plan but also provide basis for quantity takeoff and construction cost estimation etc. This paper suggests a plan to standardize detailed information based on BIM standard framework in order to make BIM realize the information. In the short term, this plan provides improved environment where both BIM and CAD technologies can be applied and, in the long term, it provides bases for BIM to replace CAD technology.

Comparative Analysis on Productivity Data and Cost Estimate System of Road Bridge Construction in Korea and China (한국 및 중국 도로교량공사의 생산성자료 및 예정가격 산정시스템 비교분석)

  • Chang, Cheng;Huh, Youngki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.39-47
    • /
    • 2020
  • There are two kinds of cost estimate system in construction in china. Quota valuation model is a traditional cost estimate system under the unity of quantity and price, which is easier and has been used for decades. But the Quota valuation model becomes increasingly unsuited to the needs of society with the development of market economy. To meet the needs of China's market economy development and construction works in the field of international cooperation, the Bill of Quantities valuation model was introduced in 2003. However, there are still many shortcomings and deficiencies in the course of implementation of Bill of Quantities valuation model. In addition, interest in the Chinese construction market continues to increase in Korea due to the recent new North Korean policy and China's the Belt and Road policy. This paper aims to examine the cost estimate system of public construction works in China, and to provide basic data for deriving future improvement plans by comparing and analyzing it with standard cost estimate system in Korea.