Browse > Article
http://dx.doi.org/10.6106/KJCEM.2020.21.3.039

Comparative Analysis on Productivity Data and Cost Estimate System of Road Bridge Construction in Korea and China  

Chang, Cheng (Department of Architectural Engineering, Pusan National University)
Huh, Youngki (Department of Architectural Engineering, Pusan National University)
Publication Information
Korean Journal of Construction Engineering and Management / v.21, no.3, 2020 , pp. 39-47 More about this Journal
Abstract
There are two kinds of cost estimate system in construction in china. Quota valuation model is a traditional cost estimate system under the unity of quantity and price, which is easier and has been used for decades. But the Quota valuation model becomes increasingly unsuited to the needs of society with the development of market economy. To meet the needs of China's market economy development and construction works in the field of international cooperation, the Bill of Quantities valuation model was introduced in 2003. However, there are still many shortcomings and deficiencies in the course of implementation of Bill of Quantities valuation model. In addition, interest in the Chinese construction market continues to increase in Korea due to the recent new North Korean policy and China's the Belt and Road policy. This paper aims to examine the cost estimate system of public construction works in China, and to provide basic data for deriving future improvement plans by comparing and analyzing it with standard cost estimate system in Korea.
Keywords
Productivity; Construction Cost Estimation System; Standard System of Cost Estimation; Bill of Quantities;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Beijing Municipal Commission of housing and Urban-Rural Development. (2013). The budget quota for Beijing public utilities works, 1st ed, Beijing, China Architecture & Buiding Press, pp. 129-130.
2 Choi, S.H., and Sho, K.H. (2019). Practice of Architecture Quality Survey & Cost Estimation, 1st ed, Seoul, Kimoondang Press, pp. 424-429.
3 Ge, L., Yuan, C.L., Yi, S., Bei, B., and Wang, L.P. (2019). "Research on Improvement and Perfection of Construction Project Quota." Construction Economy, 40(4), pp. 73-78.
4 Jiang, X. (2014). "Study on the Organization of Competitive Enterprises Norm Based On the Detail List." MS thesis, Chang'an University, Xi'an, China.
5 Lei, S., and Yin, Z.J. (2018). "Research on the Influence of Budget Quota Difference of Beijing, Tianjin, and Hebei on Project Cost." Construction Economy, 39(2), pp. 54-57.
6 Liu, B.B. (2017). "Study on the Influence of Construction Scheme on Project Construction Cost under the price pattern of quantities" MS thesis, Anhui Jianzhu University, Hefei, China.
7 Liu, X.T., and Zhu, X.S. (2017). "Problems in the Valuation with Bill of Quantity and Suggestions for Improvement." Construction Economy, 38(6), pp. 47-50.
8 Liu, Z. (2012) "The Study on Compiling the Budget Quota of Highway Maintenance and Processing Method of the Raw Data" MS thesis, Chang'an University, Xi'an, China.
9 Mao, J.J. (2003). "Research on the Theory and Application of Chinese Engineering Budget Quota." MS thesis, Southwestern University of Finance and Economics. Sichuan, China.
10 Ministry of housing and Urban-Rural Development of People's Republic of China. (2013). "Code of bills of quantities and valuation for construction works. (GB50500-2013)."
11 Zhang, M. (2018). "Research on the Establishment and Application of Building Construction Enterprise Quota." Construction Economy, 28(5), pp. 5-8.
12 Public Procurement Service. (2019). "Enforcement Decree of the Act on Contracts to Which the State is a Party." (Presidential Decree No.30078), China.
13 Qi, G.Z. (2016). "Present Situation Problems and Thoughts on Bidding Control Price Under BOQ List Pricing Mode." Engineering cost management, 2016(3), pp. 40-44.
14 Shanghai Municipal Commission of housing and Urban-Rural Development. (2017). The budget quota for Beijing public utilities works, 1st ed, Shanghai, Tongji University Press, pp. 3-8.
15 Xiao, L.B. (2006). "Comparing Analyzing and Studying on the Existence of the Dual-Track Projectcost-valuation Model and Its Environment." MS thesis, Chongqing University, Chunqing, China.
16 You, L.H. (2005). "A Comparative Study on the Average Actual Costing and Estimated costing in Pricing for Construction Works." MS thesis, Chungnam National University, Daejeon Metropolitan City, Korean.