1 |
H. J. Park, M. B. Seo, K. B. Ju, "A Development of Work Item and Duration Estimation Method for 3D Printing based Building" Journal of Korea Academia-Industrial Cooperation Society, Vol. 18, No. 12, pp. 200-207, 2017 DOI: https://doi.org/10.5762/KAIS.2017.18.12.200
DOI
|
2 |
K. S. Lee, H. P. Park, U. N. Oh, S. H. Park, "A Study on the Establishment Plan of Integrated Construction Information Classification", Journal of Korea Institute of Construction Engineering and Management, Vol. 3, No. 2, pp. 99-106, 2002 UCI: http://uci.or.kr/G704-001084.2002.3.2.004
|
3 |
KICT (2017a) 2017 Standard Estimation System, Ministry of Land, Infrastructure and Transport, and KICT, 2017
|
4 |
C. Son, S. Hong, H. Kim "Strategies for improving a measurement system of standard unit productivity data on construction projects" Journal of the Architecture Institute of Korea, Vol.26, No.6, pp. 157-166, 2010 UCI: http://uci.or.kr/G704-B00167.2010.26.06.014
|
5 |
D. H. Lee, K. H. Kim "Status and Improvement of Standard Estimating System for Reinforced Concrete" Journal of the Architectural Institute of Korea Structure & Construction, Vol.32, No.10, pp. 47-54, 2016 DOI: https://dx.doi.org/10.5659/JAIK_SC.2016.32.10.47
DOI
|
6 |
Aundrey Rudenko, Available From: http://www.totalkustom.com/ (accessed Oct., 18, 2018)
|
7 |
Controur Crafting, http://contourcrafting.com/ (accessed Oct., 18, 2018)
|
8 |
IMCRC Center, http://imcrc.org/ (accessed Oct., 18, 2018)
|
9 |
Apis Cor., http://apis-cor.com/en/ (accessed Oct., 18, 2018)
|
10 |
Korea Concrete Institute, Standard Concrete Specification, 2003.
|