• Title/Summary/Keyword: risk-control assessment

Search Result 659, Processing Time 0.031 seconds

Microbial Modeling in Quantitative Risk Assessment for the Hazard Analysis and Critical Control Point (HACCP) System: A Review

  • Min, Sea-Cheol;Choi, Young-Jin
    • Food Science and Biotechnology
    • /
    • v.18 no.2
    • /
    • pp.279-293
    • /
    • 2009
  • Quantitative risk assessments are related to implementing hazard analysis and critical control points (HACCP) by its potential involvement in identifying critical control points (CCPs), validating critical limits at a CCP, enabling rational designs of new processes, and products to meet required level of safety, and evaluating processing operations for verification procedures. The quantitative risk assessment is becoming a standard research tool which provides useful predictions and analyses on microbial risks and, thus, a valuable aid in implementing a HACCP system. This paper provides a review of microbial modeling in quantitative risk assessments, which can be applied to HACCP systems.

Isolation and Characterization of Bacillus sp. Producing Broad-Spectrum Antibiotics Against Human and Plant Pathogenic Fungi

  • Chen, Na;Jin, Min;Qu, Hong-Mei;Chen, Zhi-Qiang;Chen, Zhao-Li;Qiu, Zhi-Gang;Wang, Xin-Wei;Li, Jun-Wen
    • Journal of Microbiology and Biotechnology
    • /
    • v.22 no.2
    • /
    • pp.256-263
    • /
    • 2012
  • A strain of bacterium producing antifungal antibiotic was isolated and identification of the strain was attempted. We could identify the bacterium as being a Bacillus sp., based on morphological observation, physiological characteristics, and 16S rDNA sequence analysis, thus leading us to designate the strain as Bacillus sp. AH-E-1. The strain showed potent antibiotic activity against phytopathogenic and human pathogenic fungi by inducing mycelial distortion and swelling and inhibiting spore germination. The antibiotic metabolite produced by the strain demonstrated excellent thermal and pH (2-11) stability, but was labile to autoclaving. From these results, we could find a broader antifungal activity of Bacillus genus. Isolation and characterization of the active agent produced by the strain are under progress.

Construction of an Exposure Matrix Using a Risk Assessment of Industries and Processes Involving Dichloromethane (작업환경측정 자료를 활용한 Dichloromethane 노출 매트릭스 구축에 대한 연구)

  • Lee, Jae-Hwan;Park, Dong-Uk;Hong, Sung-Chul;Ha, Kwon-Chul
    • Journal of Environmental Health Sciences
    • /
    • v.36 no.5
    • /
    • pp.391-401
    • /
    • 2010
  • A reduction in risk of occupational exposure to chemical hazards within the workplace has been the focus of attention both through industry initiatives and legislation. The aims of this study were to develop an exposure matrix by industry and process, and to apply this matrix to control the risk of occupational exposure to Dichloromethane (DCM). The exposure matrix is a tool to convert information on industry and process into information on occupational risk. The exposure matrix comprised industries and processes involving DCM, based on an exposure database provided by KOSHA (the Korean Occupational Safety and Health Agency), which was gathered from a workplace hazards evaluation program in Korea. The risk assessment of the exposure matrix was performed using Hallmark risk assessment tool. The results of the risk assessment were indicated by a Danger Value (DV) calculated from the combination of hazard rating (HR), duration of use rating (DUR), and risk probability rating (RPR) of exposure to the chemical, and were divided into four control bands which were related to control measures. The applicability of the risk assessment of the exposure matrix was evaluated by a field study, and survey of the employees of the exposure matrix groups. Among 45 industries examined, this study found that greater attention should be paid to two industries: the manufacture of other optical instruments and photographic equipment, and the manufacture of printing ink, and to one process among 47 examined, the packing process in the manufacture of printing ink, because these were regarded as carrying the highest risk. This tool of a risk assessment for the exposure matrix can be applied as a general exposure information system for hazard control, risk quantification, setting the occupational exposure limit, and hazard surveillance. The exposure matrix includes workforce data, and it provides information on the numbers of exposed workers in Korea by agent, occupation, and level of exposure and risk.

Banding the World Together; The Global Growth of Control Banding and Qualitative Occupational Risk Management

  • Zalk, David M.;Heussen, Ga Henri
    • Safety and Health at Work
    • /
    • v.2 no.4
    • /
    • pp.375-379
    • /
    • 2011
  • Control Banding (CB) strategies to prevent work-related illness and injury for 2.5 billion workers without access to health and safety professionals has grown exponentially this last decade. CB originates from the pharmaceutical industry to control active pharmaceutical ingredients without a complete toxicological basis and therefore no occupational exposure limits. CB applications have broadened into chemicals in general - including new emerging risks like nanomaterials and recently into ergonomics and injury prevention. CB is an action-oriented qualitative risk assessment strategy offering solutions and control measures to users through "toolkits". Chemical CB toolkits are user-friendly approaches used to achieve workplace controls in the absence of firm toxicological and quantitative exposure information. The model (technical) validation of these toolkits is well described, however firm operational analyses (implementation aspects) are lacking. Consequentially, it is often not known if toolkit use leads to successful interventions at individual workplaces. This might lead to virtual safe workplaces without knowing if workers are truly protected. Upcoming international strategies from the World Health Organization Collaborating Centers request assistance in developing and evaluating action-oriented procedures for workplace risk assessment and control. It is expected that to fulfill this strategy's goals, CB approaches will continue its important growth in protecting workers.

An Objective method of risk assessment based on RAM analysis for warship (함정 분야의 RAM분석 기반 위험평가 방안)

  • Beak, Yong-Kawn;Kang, Byoung-Soo;Jo, Kwan-Jun
    • Journal of Korean Society for Quality Management
    • /
    • v.43 no.4
    • /
    • pp.511-520
    • /
    • 2015
  • Purpose: This study suggests a method of risk assessment based on RAM analysis in order to reduce the subjectivity. Methods: RAM analysis is used to assessment risk consequence(RC) and risk likelihood(RL). Result: The calculated result of the product, which has higher risk assessment, shows lower MTBF system. Conclusion: Risk assessment based on objective database will provide objectivity and effective quality control.

Development of genetically modified crops based on considerations of risk assessment and management (위해성평가와 관리를 고려한 유전자변형작물 개발의 필요성)

  • Kim, Chang-Gi;Jeong, Soon-Chun;Yoon, Won-Kee;Park, Kee-Woong;Choi, Kyung-Hwa;Kim, Hwan-Mook
    • Journal of Plant Biotechnology
    • /
    • v.36 no.4
    • /
    • pp.360-365
    • /
    • 2009
  • Over the last five years, we have conducted research on risk assessment of domestically developed genetically modified (GM) crops and found a number of factors which could delay risk assessment process. In this review, we described such cases and discussed the problem of transgene cassette integration, the lack of information on vectors, the poor quality control in seed production and absence of bioinformatic analysis on amino acid sequence homology before GM crop development. To solve these problems, we have suggested the introduction of the screening system of elite event before risk assessment process and quality control strategies for GM seed production. In addition, we suggested that the developers of GM crops should understand the importance of risk assessment and management for the commercialization of those crops and consider the biological and ecological characteristics of host plants. Consistent communications may need to be established between GM crop developers, risk assessors and risk managers at the initial stages of GM crop development to reduce trial-and-errors.

Risk Assessment in the UK Health and Safety System: Theory and Practice

  • Russ, Karen
    • Safety and Health at Work
    • /
    • v.1 no.1
    • /
    • pp.11-18
    • /
    • 2010
  • In the UK, a person or organisation that creates risk is required to manage and control that risk so that it is reduced 'So Far As Is Reasonably Practicable (SFAIRP).' How the risk is managed is to be determined by those who create the risk. They have a duty to demonstrate that they have taken action to ensure all risk is reduced SFAIRP and must have documentary evidence, for example a risk assessment or safety case, to prove that they manage the risks their activities create. The UK Health and Safety Executive (HSE) does not tell organisations how to manage the risks they create but does inspect the quality of risk identification and management. This paper gives a brief overview of where responsibility for occupational health and safety lies in the UK, and how risk should be managed through risk assessment. The focus of the paper is three recent major UK incidents, all involving fatalities, and all of which were wholly avoidable if risks had been properly assessed and managed. The paper concludes with an analysis of the common failings of risk assessments and key actions for improvement.

Application of the Risk-Based Analysis to EIA (환경영향평가에 있어 위해성분석 기법의 도입)

  • Chung, Yong
    • Journal of Environmental Impact Assessment
    • /
    • v.4 no.3
    • /
    • pp.1-8
    • /
    • 1995
  • In generally speaking, the purpose of Environmental Impact Assessment(EIA) is to give the environment its due place in the decision-making process by clearly ealuating the environmental consequence of a proposed activity before action is taken. The introduction of conventional EIA is to be seen as an end product of a very long evolutionary process, starting with rudimentary but evolving pollution control measures for air, water, noise, land and chemicals, each governed by separate, and separately administered pieces of legislation. In EIA process, the measures of status, scoping, proposed mitigation and communication have not been very quantitative in their significancy. Of course, the determinations have uncertainity in the implications for significant impacts. To improve the determination of significant impacts, some more comprehensive methodologies of EIA has been proposed with the concepts of risk analysis in the proposed projects. The concepts of risk analysis has been introduced to the expression of human health impairment due to environmental pollutants since the early 1980's. The risk analysis being meant by the statistical significance of impact has a process quantitatively considering uncertainities and importances of ecological systems and human health as well. The process of risk analysis shows assessment, doseresponse in toxicity, exposure assessment and risk characterization. With the risk assessment, it could be suggested for the proper measurements against their anticipated risk in the EIA. This paper deals the priciples developing process and application of the risk-based analysis in EIA.

  • PDF

Construction Work by Type Risk Factors increased levels proposed model for the PCRA(Pre Construction Risk Assessment) - Focusing on building construction - (건설공사 공종별 위험성평가 위험요인 도출 수준 향상을 위한 PCRA 모델 제안 -건축공사 중심으로-)

  • Bok, Hoon;Kim, Hyeong-Tae;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.16 no.3
    • /
    • pp.9-22
    • /
    • 2014
  • Constructions sites are affected by Diversity workplace, complexity of construction, Change of place, Mobility of workers and so on. In a single establishment, Prime contractors and subcontractors have to conduct their work at the same time. There are a lot of unpredictable risks when the construction is running, coordination between contractors is very important to do a risk assessment under the condition. Large Construction companies were investigated by previous studies. Survey research is applied to the risk assessment. In the writing, Risk assessment of the entire lower level. Because of the low level of risk factors to find. Also, There was a limit to investigate accidents. Confirmed that Effort to derive a risk factors were desperately of the risk assessment. Results were obtained through previous studies. The PCM is several experts should be joined. Experts Site Manager, Supervisor, Safety Manager, Director Contractor, Work team leader is required to participate. Construction plans, Process Planning to the risk find beforehand. And Determines how the operations and the control. Also, Made it into the database. and PCRA can be used in the risk assessment was developed.

Proposal for Government Quality Assurance Risk Assessment System for Military Supplies (군수품 정부품질보증 위험성 평가제도 개선을 위한 제언)

  • Namsu Ahn
    • Journal of Korean Society for Quality Management
    • /
    • v.51 no.2
    • /
    • pp.155-170
    • /
    • 2023
  • Purpose: Nowadays, the risk assessment system is widely used in many industrial and public areas to reduce the possible risks. The system is used to determine the priorities of the government quality assurance works in Defense Agency for Technology and Quality. However, as the risk assessment system is used for other purposes, there are some items that need improvement, and in this study, we propose improvement plans by benchmarking the risk assessment systems of other institutions. Methods: In this paper, first, the procedures of risk assessment system used in many industrial sites were reviewed, and how each institution specialized and applied the system. Afterwards, by benchmarking various risk assessment systems, an improvement plan on how to operate the risk assessment system in the case of government quality assurance for centrally procured military supplies was presented, and practical application cases were presented to prove the usefulness of the improvement plan. Results: The proposed risk assessment system differs from the existing system in five major aspects. First, inputs, outputs, and key performance indicators were specified from the systematic point of view. Second, risk analysis was analyzed in four dimensions: probability of occurrence, impact, detection difficulty. Third, risk mitigation measures were classified, control, transfer, and sharing. Fourth, the risk mitigation measures were realized through document verification, product verification, process verification, and quality system evaluation. Finally, risk mitigation measures were implemented and the effectiveness of the risk mitigation measures was evaluated through effectiveness evaluation. Conclusions: In order for the risk assessment procedure proposed in this study to be applied to actual work, it is necessary to obtain the consent of the person involved in the work due to the increased time for risk identification and preparation of the government quality assurance log, and a change in the information system that performs the actual work is required. Therefore, the authors of this study plan to actively perform internal seminar presentations and work improvement suggestions to apply these research outputs to actual work.