1 |
Kim, Mooyoung. 2011." A Study on Determining Method of Integrated Logistics Support Elements in Defense system Test Development Phase."2011 Autumn Conference of Koran Institute of Industrial Engineers, 996-1001.
|
2 |
Kim, Jungho et al. 2011. "The Scientific Method of Risk Identification using FMECA."2011 Spring Conference of Koran Institute of Industrial Engineers, 264-270.
|
3 |
Sohn, Jungmok, Chang, Chungmoo, and Won youdong. 2012. "A Case Study of RAM Analysis Using Field Data:Focusing on Korean Warship." Journal of the Korea Contents Association 12:395-412.
|
4 |
Defence Acquisition Program Administration. 2009. Practice Guideline for Integrated Logistics Support Development.
|
5 |
US DoD. 2005. DoD guide for achieving Reliability, Availability, and Maintainability.
|
6 |
Shin, Sangsik, Lee, Kilsoo, and Cho Heunggi. 2013. "An Objective Method of Risk Assessment Based on Stochastic Modelling."Journal of the Korean Society for Quality Management 41:465-474.
DOI
|
7 |
Yun, Wonyoung et al. 2011. "Simulation Modeling for RAM Analysis of a Searching System." Journal of the Korean Society for Quality Management 39:353-363.
|
8 |
Woo, Heesung, Jung, Sanggyu, and Lee, Changwoo. 2013. "A Study on the Evaluation Criteria Development for Selecting Intensive Management Items and Its Application Plan."Journal of the Korean Society for Quality Management 41:475-486.
DOI
|