• 제목/요약/키워드: risk breakdown structure

검색결과 35건 처리시간 0.03초

우주발사체 시스템 개발에 있어서의 SE관리기법 적용 (Application of SE Management Techniques for space Launch System Development)

  • 조미옥;조병규;오범석;박정주;조광래
    • 시스템엔지니어링워크숍
    • /
    • 통권4호
    • /
    • pp.90-94
    • /
    • 2004
  • System engineering(SE) management techniques applied for space launch system development are introduced to assess the current status and address the effwctiveness of these techniques. Management plans and guides are prepared for the work breakdown structure , data, comfiguration, interface control, Quality assurance, procurement, reliability, risk and verification/validation . Further improvement is required for the system engineering management plan(SEMP) to merge the international cooperation into current engineering managment system.

  • PDF

CRMS를 활용한 건설공사의 리스크관리 절차모형 개발 (Development of a Risk Management Procedure Model for the Construction Project Using Construction Risk Management System)

  • 김창학;강인석;박홍태
    • 대한토목학회논문집
    • /
    • 제30권4D호
    • /
    • pp.423-432
    • /
    • 2010
  • 본 연구에서는 공사기획단계와 시공단계에서 공사의 성공적 이행을 보장하기 위해 기존의 리스크관리 프로세스를 살펴보고 이에 적합한 새로운 리스크분석 모델인 CRMS를 제시한다. CRMS는 시공자가 건설공사의 이행중 리스크를 확인하고, 분석하고, 관리해 가기 위한 리스크관리절차이다. 이것은 시공자가 인지한 리스크를 정량화하고 이에 적절한 리스크관리 방안을 수립하는데 큰 도움을 줄 수 있다. 특히 건설공사의 리스크관리 중 가장 중요하고 어려운 부문이 리스크를 인지하는 것으로 볼 수 있다. 따라서 본 연구에서는 건설공사의 리스크인지를 쉽게 할 수 있는 절차의 개발에 좀 더 집중하였다. 리스크의 확인은 프로젝트의 외적 리스크와 내적 리스크로 구분한다. 글로벌 리스크의 경우 확인을 용이하게 하기 위해 분석에 필요한 목록을 제시하고, 아울러 RBS의 구축방법과 WBS와의 연계방안을 제시하였다. 이러한 연구결과는 리스크관리용 전산시스템을 개발하기 위한 기초자료로 활용되게 될 것이다.

도시재생사업의 리스크요인 분류 및 중요도 산정 (Risk Factor Classification and Weight Estimation for Urban Regeneration Project)

  • 조재경;현창택;윤유상;김윤식;차용운
    • 한국건설관리학회논문집
    • /
    • 제13권4호
    • /
    • pp.89-99
    • /
    • 2012
  • 대규모 복합개발 형태로 추진되는 도시재생사업은 사업의 특성상 사업이 장기화, 참여주체들 간의 갈등요소, 복잡한 인 허가 과정, 잦은 정책변화 등의 리스크요인을 내포하고 있다. 따라서 사업 진행과정 중 발생할 수 있는 수많은 리스크요인들을 사전에 효율적으로 관리할 수 있는 체계적인 리스크관리가 필요하다. 그러나 도시재생사업과 같은 대규모 복합개발사업의 리스크관리는 아직 도입단계로 주로 일회적인 리스크관리계획이 수립되고 있다. 따라서 본 연구에서는 수많은 리스크요인들이 내재된 도시재생사업의 체계적인 리스크 관리를 위하여, 선행연구와 사례분석을 통해 도시재생사업의 리스크요인을 제시하였다. 그리고 도시재생사업의 추진단계에 따라 리스크요인을 분류하고 그에 대한 중요도를 산정하여, 단계별 중점 리스크요인을 제시하였다.

건축공사 착공 전 단계의 공정리스크 관리도구 개발 - 철골공사 중심으로 - (The Development of Schedule Risk Management Tools at the Preconstruction Phase in Building Construction - Focused on the Steel Work -)

  • 서상욱;윤유상;김선국
    • 한국건설관리학회논문집
    • /
    • 제6권1호
    • /
    • pp.177-185
    • /
    • 2005
  • 건축공사에서의 리스크 관리자들은 전체 공기에 영향을 미치는 공정리스크 관리에 대한 중요성에 대해 공감하고 있지만 그 에 대한관리 절차 및 도구 등이 체계화되어 있지 않아 공정관리에 어려움을 겪고 있다. 또한 기존의 리스크 관련 연구에서의 리스크 분류체계는 현장업무 중심으로 이루어지지 않아 실용화되기에 한계가 있다. 따라서 본 연구에서는 전체 공정에 많은 영향을 미치는 철골공사를 대상으로 공사 프로세스 중심의 리스크 분류체계와 주요 공정 리스크 요인과 연계한 업무 플로우를 제시하였고, 공정리스크 관리업무의 효율성을 제고하기 위해 공정리스크 중요도를 분석하였으며, 이를 기반으로 공정 리스크 요인별 대응방안 및 세부대책으로 이루어진 공정 리스크 관리 도구를 개발하였다.

LNG-FPSO 선박 장비들의 보전활동 지원시스템 개발에 관한 연구 (A Study on the Development of Maintenance System for Equipment of LNG-FPSO Ship)

  • 이순섭;강동훈;이종현;이승준
    • 해양환경안전학회지
    • /
    • 제22권2호
    • /
    • pp.233-239
    • /
    • 2016
  • 본 연구에서는 LNG-FPSO 선박에 탑재되어 있는 장비들의 운영효율을 최대화하기 위한 상태기반유지보수(CBM) 활동을 지원하는 보전시스템을 개발하였다. 개발된 보전시스템에서는 상태기반유지보수를 수행할 주요 장비들을 식별하여 이를 PWBS(Product Work Breakdown Structure)로 정의하였고 식별된 장비들로부터 실시간 수집되는 센서데이터를 이용하여 장비들의 고장분석과 최적 유지 보수 방안을 결정하기 위한 경제성평가 등을 수행하며, 이들을 수행하기 위해 필요한 입출력 데이터를 저장, 관리하는 고장사례 및 유지보수데이터베이스를 구축하였다. 개발시스템의 성능검증을 현재 개발 중인 LNG-FPSO 선박의 Inlet 시스템의 Compressor와 화물창의 Pump Tower 등과 같은 주요 장비들을 대상으로 실시하였고 이를 바탕으로 상태기반유지보수의 가능성을 확인하였다.

터파기 공사 사고가 공사에 미치는 경제적 영향 (The Economic Impact of Excavation Work Failure on a Construction Project)

  • 고광노;이강
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.643-646
    • /
    • 2007
  • 도심지 지가가 높아짐에 따라 건축물의 공간 활용도에 대한 기대치가 높아지게 되었고, 건축물은 더 크고, 더 깊고, 더 높게 지어지는 방향으로 나아가고 있다. 이에 따라, 공사의 첫 단계이자 전체 건물의 기초가 되는 지하 공사는 그 중요성이 날로 더해가고 있다. 최소한의 비용으로 최단기간에 터파기 공사를 완료해야 하는 도심지 공사의 특성상 공사 관계자들은 지하 공사를 계획, 설계, 시공, 설계하는 과정에서 심혈을 기울이고 있다. 그럼에도 불구하고 지하 공사 전번에 걸쳐 있는 불확실성과 위험 요소 때문에 공사 실패 사례가 발생하고 있다. 더욱이 이러한 사고가 어느 정도의 경제적 피해를 끼쳤는지에 대한 보고나 연구없이 사고 사례만 알려지기 때문에 지하 공사의 위험성에 대한 경각심이 부족한 것이 우리나라 건축의 현실이다. 이런 사고를 타산지석으로 삼아 터파기 공사 공법을 선정하고 지하 공사를 이행하는데 있어서 하나의 지침이 되기를 바라면서 지하 공사 실패 사례가 과연 어느 정도의 경제적 피해를 발생시키는지를 개산견적 기법을 도입하여 추정해 보았다.

  • PDF

제품개발 프로젝트관리 프로세스 개발 (Development of Project Management Process for Product Development)

  • 민택기
    • 산업경영시스템학회지
    • /
    • 제33권3호
    • /
    • pp.93-101
    • /
    • 2010
  • Regarding project management, many organizations have developed and distributed general project management knowledge systems, and application fields use the knowledge systems to apply the process suitable for characteristics of a project. This study suggests project management process models to apply to product development projects and introduces the application cases. This product development project management process model is composed of five top processes of initiation and preparation, planning, implementation management, control, and termination and transfer. The five processes are re-divided into 18 bottom processes. These processes are expressed as input, control, output, and mechanism by using the IDEF0 model. This model is applied to the new car development project of a Korean automobile company and introduces the cases, which shows a project charter, a work breakdown structure, a project schedule, a progress s-curve, a risk register, and a performance report.

우주 발사 시스템 개발에 있어서의 SE 관리기법 적용 (Application of SE Management Techniques for Space Launch System Development)

  • 조미옥;조병규;오범석;박정주;조광래
    • 시스템엔지니어링학술지
    • /
    • 제1권1호
    • /
    • pp.53-60
    • /
    • 2005
  • System engineering(SE) management techniques applied for space launch system development are introduced to assess the current status and address the effectiveness of these techniques. Management plans and guides are prepared for the work breakdown structure, data, configuration, interface control, quality assurance, procurement, reliability, risk and verification/validat ion. Further improvement is required for the system engineering management plan(SEMP) to merge the international cooperation into current engineering management system.

  • PDF

성과관리시스템(EVMS) 도입을 위한 원전 건설사업비 관리체계 세분화 방안에 관한 연구 (A Study on the Cost Hierarchical System of Nuclaer Power Plant Construction Project for Introcusting Earned Vaule Management System)

  • 이상현;김우중
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.230-231
    • /
    • 2019
  • The nuclear power plant construction project is large-scale, has various stakeholders and computer system, and is produced and managed a large amount of information. The domestic nuclear power plant construction project has accumulated data based on many years of experience in the system. It has the competitiveness to suggeest alternatives that meet the requirement of the client in the overseas nuclear power plant project. Earned value management, which integrates schedule and cost, is possible to risk management. It was developed the earned value management system considering the the actual data properties and types of the preceding nuclear power plant construction projects. It will be able to increase the nuclaer power plant export competieiveness. Therefore, it was palned to carry out future stuies so that it be able to complement the measure to integrate cost and schedule in consideration of actual data(quantity of activity, etc.).

  • PDF

건설사업의 리스크 식별에 관한 사례연구 (A Case Study of the Risk Identification in Construction Project)

  • 안상현
    • 한국건설관리학회논문집
    • /
    • 제16권1호
    • /
    • pp.15-23
    • /
    • 2015
  • 건설산업에서 리스크관리는 글로벌 경쟁력 지표를 평가하는 요소로써 활용될 뿐만 아니라 기관 및 기업들의 경쟁력을 확보하기 위한 분야로써 꾸준한 관심을 받고 있다. 효과적인 건설리스크 관리를 위해서는 재무관리, 보험관리, 안전관리 등 기업차원의 전사적인 리스크관리 범위에서 실제 건설현장에서 활용할 수 있는 구체적인 업무 프로세스의 개선이 필요하다. 건설리스크 관리를 위해서는 무엇보다 어떤 리스크가 내재되어 있는지 식별하는 단계가 중요하며 리스크 식별이 선행되어야 그에 따른 대응전략 수립 및 관리방안에 대한 모색이 이루어진다. 본 연구에서는 리스크 식별, 분석, 대응방안 수립, 모니터링 및 관리 등 건설리스크 관리를 위한 단계 중 리스크 식별에 대한 업무 프로세스 개선에 초점을 맞추어 사례현장의 리스크 식별을 위한 체크리스트 도출 과정 및 방법을 제안하고자 한다. 사례현장은 사업단계별 리스크 분류체계 도출을 통해 리스크 요인에 대한 원인을 파악하여 리스크 요인의 위험도 저감 또는 제거를 위한 점검 방안으로써 체크리스트를 도출하였다. 이러한 사업의 특성 및 성격을 고려한 체크리스트 도출 과정은 효과적인 리스크 식별을 가능하게 하고 체계적인 리스크관리 수행을 유도하여 프로젝트의 성공적인 완수에 기여할 것으로 예상된다.