A Study on the Development of Maintenance System for Equipment of LNG-FPSO Ship |
Lee, Soon-Sup
(Department of Naval Architecture and Ocean Engineering, Gyeongsang National University)
Kang, Donghoon (Department of Naval Architecture and Ocean Engineering, Gyeongsang National University) Lee, Jong-Hyun (Department of Naval Architecture and Ocean Engineering, Gyeongsang National University) Lee, Seung-Jun (Argonet co, ltd.) |
1 | Lee, S. S. and J. W. Kim(2014), Case Study for Development of Maintenance System for Equipment of LNG-FPSO Topside, Journal of Ocean Engineering and Technology, Vol. 28, No. 6, pp. 533-539. DOI |
2 | Lee, S. S., S. B. Lee and J. W. Kim(2015), Development of Maintenance System for Equipment of LNG-FPSO Ship, Proceedings of Annual Autumn Conference of the Korean Society of Naval Architects, pp. 33-38. |
3 | Park, J. S., H. C. Kim, D. W. Jang, Y. Park and H. W. Lee(2007), Reliability Centered Maintenance for Traction Power Systems, Report of Korea Railroad Research Institute(KRRI 07-097), pp. 19-28. |
4 | SINTEF(2009), OREDA(Offshore Reliability Data), OREDA Participants, Norway. |
5 | Smith, A. M. and G. R. Hinchcliffe(2004), RCM Gateway to World Class maintenance, Elsevier Butterworth-Heinemann, Oxford. pp. 35-63. |
6 | Son, S. H, K. S. Kim and U. C. Jeon(2014), Offshore Oil & Gas Plant for Ship Engineer, CIR, Seoul, pp. 129-146. |
7 | Dongnam Leading Industry Office(2012), Systems for Offshore Plant-Part II LNG-FPSO Topside Systems, Dongnam Global Offshore Cluster, pp. 3-4. |
8 | GE Energy(2013), Offshore Platforms & FPSOs, GE Energy, Nevada, pp. 3-6. |
9 | Kim, J. W. and S. S. Lee(2014), Development of Maintenance System for Equipments of LNG-FPSO Topside, Proceedings of Annual Autumn Conference of the Korean Society of Ocean Engineering, pp. 174-177. |
10 | Lee, D. H.(2014), Research of design improvement, in particular LNG containment system for Floating LNG, PH. D Thesis, Pusan National University, pp. 10-11. |