• 제목/요약/키워드: replacement time

검색결과 1,363건 처리시간 0.03초

고장형태(故障形態)를 고려(考慮)한 다부품장비(多部品裝備)의 최적교환시기(最適交換時期) 결정(決定) (Determination of Optimal Replacement Period for A Multicomponent System Consider with Failure Types)

  • 이승준;강창욱;황의철
    • 품질경영학회지
    • /
    • 제19권2호
    • /
    • pp.117-124
    • /
    • 1991
  • In this paper, it is assumed that a system is composed of an essential unit and a nonessential unit. During the running of the system, an essential unit is replaced at periodic replacement time T or at nth failure of essential unit whichever occurs first. Nonessential unit is replaced at its failure and at the replacement of essential unit. This paper derive optimal replacement period which minmises the total expected cost for replacement. The unimodality of totoal maintenance cost function is proved under the assumption that hazard rate of each component is continuous and monotone increasing failure rate(IFR). Based on this condition, it is shown that the optimal replacement period is finite and unique.

  • PDF

심장판막 치환술후 직업복귀에 대한 임상적 고찰 (A Clinical Study for Return to Work after Heart Valve Replacement - A Case Report -)

  • 김현경
    • Journal of Chest Surgery
    • /
    • 제24권10호
    • /
    • pp.967-972
    • /
    • 1991
  • Between Feb. 1982 and July 1990, 173 patients [male: 89, female: 84] Who underwent heart valve replacement for acquired valvular heart disease on the Department of Thoracic and Cardiovascular Surgery, School of Medicine, Pusan National University, were reviewed for return to work after heart valve replacement. The replaced valve were mitral [128, 74.0%], aortic[10, 5.8%], mitral & aortic[35, 20.2%]. Two tricuspid valve replacement were excluded. Several important factors influencing the return to work were age, the employment status before surgery, the number of replaced valve, the pre - op NYHA functional class and cardiac function [ejection fraction]. These factors were closely related to the optimal time of heart valve replacement. It can be concluded that the rate of return to work and the quality of life would be improved if valve replacement were performed at an earlier stage of valvular heart disease.

  • PDF

심장다판치환술의 임상적 고찰 (Clinical Evaluation of Multiple Valve Replacement)

  • 오상기
    • Journal of Chest Surgery
    • /
    • 제33권2호
    • /
    • pp.160-166
    • /
    • 2000
  • Background: The purpose of this study is to evaluate and analyze the surgical results in patients undergoing operations for multiple for multiple valvular heart diseases. Material and method: From April 1982 to June 1997 multiple valve replacement was performed in 150 patients mitral and aortic valve replacement were done in 135 patients mitral and tricuspid valve replacements in 10 patients triple replacements in 4 patients and aortic and tricuspid valve replacement in 1 patient. Of the valves implanted 157 were St. Jude 104 Duromedics 20 Carpenter-Edwards 6 Bjork-Shiley 6 Ionescu-Shiley and 2 Medtronics. Result: The hospital mortality rate was 10.7% (16/150) and the late mortality rate was 7.2% (8/134) The mortality rate was high in early operative period but decreased with time. The causes of death were low cardiac output in 9 sudden death in 3 congestive heart failure in 3 bleeding in 2 cerebral thrombosis in 1 leukemia in 1 multiorgan failure in 1 and so on . The actuarial survival rate excluding operative death was 83.1% at 15 years. Conclusion: With a follow-up now extending to 15 years the multiple valve replacement continues to be reliable procedure with relatively low mortality and morbidity.

  • PDF

THE DEVELOPMENT OF BUILDING MAINTENANCE SYSTEM FOR DETERMINING PRIORITIES OF PUBLIC FACILITY REPAIRS & REPLACEMENT (I)

  • Chun-Kyong Lee;Tae-Gab Jung;Byong-Jin Yu;Tae-Keun Park
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.376-381
    • /
    • 2011
  • In Korea Water Resources Corporation (K-Water) has seen four problems rising in four aspects of property management of approximately 1,300 buildings scattered through put to country. To solve these, ground data for repair and replacement works to be conducted for prevention will be prepared and building maintenance system (hereinafter referred to as PBMS) intended to record related repair and replacement work histories and calculate LCC of the related these items will be developed. PBMS, a web-based system, will be developed for users' convenience and data monitoring in real time. To sum up, PBMS are expected to maximize efficiency in four aspects including the establishment of repair and replacement work plans for prevention, history management, DB for predicting future work to be occurred and enable the determination of priorities by being developing into facility condition assessment systems through the results of analysis of repair and replacement histories and LCC.

  • PDF

정기교체 및 최소수리를 고려한 작업주기 횟수 최적화 (Optimal Working Cycles for Minimal Repair Policy)

  • 이진표
    • 품질경영학회지
    • /
    • 제48권1호
    • /
    • pp.201-214
    • /
    • 2020
  • Purpose: The purpose of this paper is to determine an optimal number of cycle times for the replacement under the circumstance where the system is replaced at the periodic time and the multiple number of working cycles whichever occurs first and the system is minimally repaired between the replacements if it fails. Methods: The system is replaced at periodic time () or cycle time, whichever occurs first, and is repaired minimally when it fails between successive replacements. To determine the optimal number of cycle times, the expected total cost rate is optimized with respect to the number of cycle times, where the expected total cost rate is defined as the ratio of the expected total cost between replacements to the expected time between replacements. Results: In this paper, we conduct a sensitivity analysis to find the following results. First, when the expected number of failures per unit time increases, the optimal number of cycle times decreases. Second, when the periodic time for replacement becomes longer, the optimal number of cycle times decreases. Third, when the expected value for exponential distribution of the cycle time increases, the optimal number of cycle times increases. Conclusion: A mathematical model is suggested to find the optimal number of cycle times and numerical examples are provided through the sensitivity analysis on the model parameters to see the patterns for changes of the optimal number of cycle times.

An Experimental Study on the Properties of Concrete using High Volume of Coal Ash

  • Kim, Moo Han;Choi, Se Jin
    • Architectural research
    • /
    • 제4권1호
    • /
    • pp.39-44
    • /
    • 2002
  • Recently, the coal-ash production has been increased by increase of consumption of electric power. So it is important to secure a reclaimed land from pollution and develop practical application of coal ash. This is an experimental study to compare and analyze the properties of concrete using high volume of coal ash (including fly ash and bottom ash) as a part of fine aggregate. For this purpose, the mix proportions of concrete according to replacement ratio of coal ash (10, 20, 35, 50%) were selected. And then air content, slump, setting time, bleeding content, chloride content, compressive strength and carbonation test were performed. According to test results, it was found that the bleeding content of concrete using the coal ash decreased according to increase of replacement ratio. And the chloride content of concrete using the bottom ash as a part of fine aggregate increased as the replacement ratio of bottom ash increased, but it is satisfied with the total chloride content of concrete recommended by KCI - $0.3kg/m^3$ below. Also, the compressive strength of concrete using the bottom ash was similar to that of plain concrete(BA 0) after 28days of curing and the carbonation depth of concrete increased as the replacement ratio increased. However, the carbonation depth of concrete using the fly ash decreased as the replacement ratio of fly ash increased.

대용특성을 이용한 예방정비모형 : 주기적으로 관측하는 경우 (Preventive Replacement Model Based on Substitutive Characteristics : the case of periodic observation)

  • 구자항;장중순;김원중
    • 품질경영학회지
    • /
    • 제20권2호
    • /
    • pp.33-43
    • /
    • 1992
  • Items are assumed to fail by degradation. An appropriate stochastic model of such item is a cumulative process in which an item can fail only when the total amount of wear exceeds a prespecified failure level. This paper presents replacement policy in which an item is replaced at a certain level of wear before failure or at failure, whichever occurs first. Yet, when measuring the item wear level is very expensive, destructive or time-consuming, it may be economical to use substitutive characteristics that are correlated with the item wear level and relatively inexpensive to measure. The item's wear level could usually be estimated by monitoring such substitutive characteristics only except for a breakdown, which may be observed immediately at its occurrence. The purpose of this paper is to find an optimal periodic replacement policy based on such substitutive characteristics that balance the cost of replacement with the cost of failure and result in a minimum total long-run average cost per unit time. The optimal level of substitutive characteristics to replace the item is obtained. Numerical example illustrate how the model can be used to determine the optimal replacement policy.

  • PDF

음식관여도 유형에 따른 레스토랑 간편식 선택속성 중요도-수행도 분석 (Importance-Performance Analysis of Restaurant Meal Replacement (RMR) Selection Attributes According to Food Involvement Type)

  • 최승균;홍완수
    • 한국식생활문화학회지
    • /
    • 제38권6호
    • /
    • pp.402-414
    • /
    • 2023
  • This study evaluated the consumers' demands and points of improvement for restaurant meal replacement through importance-performance analysis by the restaurant meal replacement segment market using food involvement. The results were as follows. First, after segmenting the restaurant meal replacement market using food involvement, it was classified into three markets (multiple involvements, exploration-oriented, and product quality-oriented). Second, an analysis of the importance of restaurant meal replacement selection attributes revealed taste, sanitation, quality, freshness, price, saving time, texture, ingredients, preparation process, and quantity to be highly important. An analysis of the differences according to the market type revealed the multiple involvement type to be more important than other groups, considering the restaurant meal replacement selection attribute element. Third, an analysis of the importance-performance analysis of restaurant meal replacement selection attributes revealed that quantity and price as the selection attributes that needed to be improved first in all three markets. In addition, in the multiple involvement type, food additives appeared as a selection attribute requiring priority improvement, revealing the characteristics of a market that cares about diet and health.

2차원 무료 보증이 종료된 이후의 보전정책 (Maintenance Policies Following the Expiration of Two-Dimensional Free Replacement Warranty)

  • 김호균
    • 한국신뢰성학회지:신뢰성응용연구
    • /
    • 제15권1호
    • /
    • pp.6-11
    • /
    • 2015
  • Maintenance plays an important role in keeping product availability, reliability and quality at an appropriate level. In this paper, two-types of maintenance policies are studied following the expiration of two-dimensional (2D) free replacement warranty. Both the fixed-maintenance-period policy and the variable-maintenance-period policy are based on a specified region of the warranty defined in terms of age and usage where all failures are minimally repaired. An accelerating failure time (AFT) model is used to allow for the effect of usage rate on product degradation. The maintenance model that arises following the expiration of 2D warranty is discussed. The expected cost rates per unit time from the user's point of view are formulated and the optimal maintenance policies are determined to minimize the expected cost rate to the user. Finally numerical examples are given to illustrate the optimal maintenance polices.

최소수리비용이 고장시간의 함수일 때 연장된 보증 정책 (Extended warranty policy when minimal repair cost is a function of failure time)

  • 정기문
    • Journal of the Korean Data and Information Science Society
    • /
    • 제23권6호
    • /
    • pp.1195-1202
    • /
    • 2012
  • 본 논문에서는 최소수리의 비용이 시스템의 수명시간에 의존하는 경우에 연장된 보증이 주어진 수리가 가능한 시스템에 대하여 사용자 측면에서의 총기대비용을 구하였다. 이를 위해서 연장된 보증을 정의하고 사용자 측면에서 연장된 보증이 종료된 이후의 교체모형을 가정하였다. 특히, 시스템의 교체모형에서 사용자가 연장된 보증을 선택하기 위한 기준을 제시하였으며, 시스템의 고장시간이 와이블 분포를 따를 때 수치적 예를 통하여 이를 설명하였다.