• 제목/요약/키워드: project team

검색결과 1,102건 처리시간 0.028초

터키 유라시아 터널 프로젝트에 대한 사례연구 (A Case Study on Turkey Eurasia Tunnel Project)

  • 김도형;방규민;전기찬;김동현;김택곤
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 춘계 학술발표회
    • /
    • pp.58-69
    • /
    • 2010
  • Turkey Eurasia Tunnel Project is large scale road construction project of which the total length is 14.6km. The subsea shield TBM tunnel will be constructed under Bosphorus strait and the project site is in poor condition as composite ground, high water pressure and earthquake. The design procedure of subsea tunnel was introduced with tender design materials. That procedure contains tunnel type, TBM type and the principal design items considering geological condition such as high water pressure, composite ground and seismic area. This paper states the progress for geotechnical investigation, seismic analysis and TBM tunnel design. Analysis for geotechnical investigation is in progress, aseismatic design is going on stability study for liquefaction and structure. In addition, the performance of shield TBM to be considered such as advance rate and improvement of TBM was reviewed. The plan of fire safety was also reviewed with respect to fire protection.

  • PDF

건설사업 성공을 위한 발주자 리더십과 베스트 프랙티스 관계 연구 (Relationships between Construction Client's Leadership and Best Practice for Project Success Empirical Finding from Best Practice Cases)

  • 오영섭;김한수
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.216-219
    • /
    • 2004
  • 건설사업의 핵심 주체는 크게 발주자, 설계자, 시공자로 구분할 수 있다. 특히, 발주자는 건설 프로젝트를 생성시키는 주체이며 건설사업의 생산성 및 효율성 역시 궁극적으로는 발주자에 의해 결정된다. 팀 작업으로 이루어지는 건설사업의 성격 상, 발주자의 다양한 역할 중 리더십은 무엇보다 중요한 요소이다. 본 연구의 목적은 건설 프로젝트의 다양한 성공 사례 중 발주자의 리더십이 프로젝트의 주요 요인으로 보고된 사례를 중심으로 건설 프로젝트에서의 Blest Practice를 분석함으로서 발주자 리더십과 Beest Practice와의 관계를 발굴하는데 있다. 이를 통해 발주자 리더십의 속성에 대한 이해를 높이고, 발주자의 Best Practice 실천을 위한 주요 초점을 제시하고자 한다.

  • PDF

The Nutrition Assessment and Care for the Elderly in Japan

  • Sugiyama, Michiko;Nishimura, Akio;Koyama, Hideo
    • Journal of Community Nutrition
    • /
    • 제2권1호
    • /
    • pp.12-26
    • /
    • 2000
  • In Japan, a new nursing insurance system was enforced in April 2000, where premiums were paid according to the level of necessary care. Our project, Nutrition Care and Management(NCM) for the elderly was started in 1995, funded by the Ministry of Health and Welfare of Japan. The NCM project was to provide appropriate nutrition care for the elderly and to see that it effectively functions as part of the health care services. There were 4 stages to the project : the first stage was to find out the PEM status among the elderly patients in hospital and home-care settings in Japan. The 2nd stage was to develop and evaluate nutritional assessment methods, anthropometry, resting energy expenditure measuring methods using of portable indirect calorimeter, and the convenient protein energy intake assessment methods, etc. for the elderly patients with PEM risk. The 3rd stage was to examine the effectiveness of the nutrition care plan induced of protein energy supplement and team care in improving nutrition among the elderly patients. The last stage was to develop the NCM set for the elderly patient based on the past three years of scientific evidence. it is expected that the NCM system for the elderly will provide adequate nutritional care management, improve the elderly care environment and create effective resource management.

  • PDF

동력분산형 고속철도 차량성능 및 운용 기반기술 연구 (Study on the Key Technologies for Performance and Operation of the High-Speed EMU)

  • 송달호;민경호
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.1227-1232
    • /
    • 2008
  • High-speed train of push-pull type called as G7 train has been developed and chosen as the model of KTX-II which will be operated on Honam Line nexr year. However, the EMU-type high-speed train appeared to be the recent trend that foreign markets have shown. Also, in the near future, a great number of new train sets are needed to accommodate the increased passengers in our country. Thus, development of the high-speed EMU was decided, planned, and started. In the development, included were almost all fundamental key technologies such as noise and vibration reduction in a passenger cabin, running characteristics, aerodynamic analysis, crashworthiness evaluation, EMI/EMC analysis, design of the cooling system for the propulsion control system, enhanced performance of transformer and switching converters, synchronous traction motor with permanent magnets, new design of front nose and ergonomic interiors, application of advanced information technology(IT) and smart sensors and the cost reduction of construction of railway bridges, etc. Each key technologies are carried out as sub-project independently but under the supervision of a project. The project will develop the high advanced level of technologies and provide necessary know-why's and support the team in charge of the development of the high-speed EMU, Hyundai Rotem Co. Ltd. The high-speed EMU will be successfully developed with the support of the project.

  • PDF

철도차량 개발과정에서의 소음관리방안 (Noise Assurance Plan in the Project for Design a New Rolling Stock)

  • 정경렬;김경택;이병현
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2003년도 춘계학술대회논문집
    • /
    • pp.542-548
    • /
    • 2003
  • This paper describes an overall Noise Assurance Plan(NAP) in the project for developing a new rolling stock. In this paper, the procedure for implementing noise control activities for each development stage on the basis of the NAP is also described. The NAP was developed by KITECH(Korea Institute of Industrial Technology) and ODS(${\Phi}$degaard & Danneskiold-Samsoe in DENMARK). Generally, the main objective of NAP is that noise assurance plan applies to the establishment of organization and personnel's roles and responsibilities, set-up of overall procedure and internal audit program. Here, a few comments are made to the deviations of the actual procedure(G7 Project) relative to the suggested NAP presented. The major difference between the suggested NAP and the actual procedure was the late involvement of the noise consultant resulting in suggestions for design improvements could not be implemented due to the advanced stage of the design. Similarly, the important task of preparing sub-supplier specifications was performed. The proposed NAP will be an efficient tool for noise management in the R&D project for new rolling stock. Specially, in case that several companies and institutes are involoved in the R&D team

  • PDF

온라인 프로젝트기반 학습모형 적용과 효과: 공학회계 사례 (Effects of Online Project-Based Learning Application: A Case of Engineering Accounting Course)

  • 김문수
    • 공학교육연구
    • /
    • 제25권2호
    • /
    • pp.13-21
    • /
    • 2022
  • In many existing studies, the analyses on the application and effect of the project-based learning model (PBL), a student-centered teaching and learning strategy, have been emphasized and carried out in various majors and courses. This case study analyzes the effects of applying a project-based learning model to the engineering accounting course for engineering students in 2021 in the context of the COVID-19 pandemic, compared with the offline course in 2019 and the simple online course in 2020. Project team consisting of 2-3 students carried out online collaborative learning activities for solving open-ended problems through the 5-step PBL procedure including presenting the final result. Except for this online PBL application in 2021, textbooks, lecture contents, assignments, and tests were implemented the same for each semester for three years. Through lecture evaluation and survey by students, the online PBL application semester showed higher effects in inducing student-centered learning, lecture satisfaction, and student competency improvement compared to the non-applying semesters, further, it was evaluated that the online PBL application to the course and evaluation method were more appropriate than other semesters. It is expected that the online PBL method and operation procedure applied in this study can be utilized as a best practice for the design and operation of various online courses for student-centered collaborative learning activities and educational effects.

EVALUATION OF SUSTAINABILITY OF CONSTRUCTION OPERATIONS: A FRAMEWORK FOR THE NEW ZEALAND CONSTRUCTION INDUSTRY

  • Jasper Mbachu
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.550-557
    • /
    • 2009
  • The concepts of 'sustainable development', 'sustainable construction' and 'green building' have been elevated to priority levels in all types and phases of construction project development worldwide. Consultants and contractors are now required to seriously consider the impact of their operations on the natural environment and the society, and consequently adopt sustainable construction practices in the development process to minimize and mitigate the negative impacts of their activities. However, existing sustainability rating tools apply to the design, post-construction and operation phases of a building; no tool exists for the rating of the performance of the contractor or the project team at the construction phase. This study aimed to develop a model for evaluating the sustainability of construction operations, drawing on the global best practice standards on sustainability. Practical applications of the model were carried out through case studies to evaluate the performances of fifteen construction firms in New Zealand. The developed model and the outcomes of the case studies were presented, including potential areas of weaknesses, strengths, constraints to achievement or adoption of sustainable construction practices and areas for improvement in the operations of the firms. The successful application of the developed model in practice shows its usefulness and ease of application. It is therefore recommended for adoption as a simple but effective system for measuring and reporting on sustainability performance or sustainability of construction operations of firms in New Zealand and elsewhere.

  • PDF

지속적인 기업체 연계 프로젝트 기반의 캡스톤 설계 운영시스템 (Operation System of Capstone Design Based on Continuous Industry Related Project)

  • 권순각;김성우;박유현
    • 공학교육연구
    • /
    • 제16권3호
    • /
    • pp.61-68
    • /
    • 2013
  • 캡스톤 설계 교과목은 학생들의 실무 프로젝트 향상을 위해서 대학교 학부과정에서 개설되어 있다. 본 논문은 캡스톤 설계 교과목을 효율적으로 운영하기 위한 방안을 제시한다. 제시하는 캡스톤 설계는 기업체의 외부 아웃소싱 연구소 형태로 운영되고 기업체가 주제를 제시하며 당해 연도 4학년 학생들이 프로젝트를 수행하고, 다음 해에는 3학년 학생들이 이어 받아 진행하게 함으로써 단발성이 아닌 지속적으로 유지되도록 운영한다. 이를 토대로 기업체는 원하는 프로젝트 결과물을 얻을 수 있고, 대학교는 학생들에게 실무중심의 팀프로젝트 경험을 쌓게 함으로서 기업체-대학교가 상호 이득을 얻을 수 있을 것이다. 제안하는 운영시스템을 실제로 컴퓨터공학 계열학과에 적용하고, 교과목 수강 학생과 참여 기업체의 멘토를 대상으로 설문조사를 수행하고, 제안시스템의 운영 결과를 분석한다.

진성리더십이 구성원의 프로젝트 성과에 미치는 영향 (Leader's Authentic Leadership and Follower's Project Performance)

  • 탁진규;서정은;노태우
    • 디지털융복합연구
    • /
    • 제17권6호
    • /
    • pp.105-112
    • /
    • 2019
  • 최근의 경영 현장과 더불어 대학에서 리더의 진정성은 점차 중요한 이슈로 부각되고 있다. 리더가 리더십을 발휘하는데 있어서 구성원들은 리더의 진정성 정도에 따라 태도, 행동 및 성과에 많은 영향을 받는다. 이에 본 연구는 리더의 진성리더십이 조직분위기 및 프로젝트 성과에 어떠한 영향을 미치는지를 분석함으로써 진성리더십이 지니는 중요성을 시사하는데 목적이 있다. 따라서 대학에 재학중인 학생들을 대상으로 설문을 진행하였으며, 회수된 175부의 설문지가 분석에 사용되었다. 가설검증을 위한 통계분석은 STATA 14.0를 사용하여 구조방정식으로 검증하였다. 연구결과를 요약하면, 첫째, 리더의 진성리더십은 구성원의 진성리더십에 정(+)의 영향을 미쳤다. 둘째, 구성원의 진성리더십은 프로젝트 성과에 정(+)의 영향을 미쳤다. 셋째, 리더의 진성리더십과 구성원의 진성리더십 간의 관계에 있어서 조직분위기는 조절역할을 하였다. 넷째, 구성원의 진성리더십과 직무성과 간의 관계에 있어서 조직분위기는 조절역할을 하였다.

미얀마 우수농산물 재배기술 전수사업 (Project of Improving Good Agriculture Practice and Income by Intergrated Agricultural Farming)

  • 이영철;최동용
    • 현장농수산연구지
    • /
    • 제16권1호
    • /
    • pp.193-206
    • /
    • 2014
  • ○ 미얀마 우수농산물 재배기술 전수사업은 농림축산식품부의 국제협력과제로 2011년 12월~2013년 12월에 걸쳐 수행되었다. ○ 사업의 주 내용은 미얀마의 신 수도인 네이피도 시의 핀마나 타운쉽에 소재한 국립농업연구소의 구내에 실시되었다. - GAP 훈련센터 건물과 지원되는 차량 농기계를 위한 차고 및 정비고를 건설하고 훈련센터 건물내에 O.J.T. 교육을 위한 기계 설비를 지원 설치하여 GAP 제도의 이해와 교육에 활용이 되도록 함 ○ 생산 농산물의 저온 저장을 위한 저온 저장고의 설치 <훈련센터 건물+시범 농장>하여 수확한 농산물이 변질·부패되지 않고 손실이 없이 저장하여 출하 할 수 있도록 하였다. - 훈련센터 내에 교육장을 설치하여 20명의 교육생이 교육받을 수 있도록 에어컨, Beam Project와 스크린, 오디오, 책상, 의자, 캐비넷(탈의장) 설비를 갖춤 - 사무실 장비로 컴퓨터, 프린터 복사기, 냉장고, 파일박스 등을 갖추어 공무원 학생, 교사 등이 교육할 수 있게 함 - 여기에 실습용(농산물의 세척, 탈수 포장) 라인과 관정개발, 전기, 양수설비 등을 갖추어 실습에 이용할 수 있게 함 - 영농기계로 트랙터(50마력), 컴바인(4조식), 틸러(10Hp 3대)와 부속 작업기(트레일러, 쟁기, 로터베이터)를 지원하여 영농에 활용하도록 함 - 시범농장 5ha를 조성하고 여기에 필요한 지하수 개발, 물탱크 설치(20톤 및 50톤) pipe 라인, 용수로 스프링클러 관수, 점적관수 시설을 설치함 - 채소 육묘에 필요한 비닐하우스(300m2)와 이동식 벤치, 미니 스프링클러 관수시설을 하였고 시범농장에 전기가 인입되지 않아 3상4선의 동력선을 500m 이상 가설 함 - 영농에 필요한 양수기, 방제용 고압분무기 등을 설치하여 건기와 우기가 뚜렷한 미얀마에서 필요한 때 언제든지 영농에 이용할 수 있게 함 - 미얀마의 선진 농민과 농업부 공무원을 대상으로 2주간 한국 초청연수를 실시하여 한국의 발전된 농업시설, 영농방식, GAP제도, 마케팅시스템, 농산물 가공 GAP처리 시설(쌀 도정, 과일 선별 포장, 딸기 수확 포장, 엽채류 재배 수확 포장 등)과 벼 기계화 재배-육묘 이식 시스템 및 육종기술 등을 견학시켜 대한민국의 선진 기술을 직접 보고 배움 - 지원하는 농기계의 운전, 유지관리, 보수를 위한 교육은 농기계 회사와 협조하여 기술자 1명을 한국에 초청하여 2주간에 걸친 농기계 담당자 교육 연수 ○ GAP제도와 실무에 관한 교육은 1차 P.M.C. 요원을 대상으로 강의, 토론 등을 통하여 소개 제시하고 한국의 관련법, 제도, 인증 실무요령 등을 제공하여 미얀마 GAP 인증제도 도입에 참고하도록 하였다. - 한국의 농산물품질관리법 GAP 인증 실무에 관한 고시 등을 번역하여 제공 ○ 미얀마 농업관개부 발행(2013 Myanmar Agriculture in brief) 5쪽에서 미얀마 농업생산 발전의 중요 요소로 GAP 제도의 도입을 강조하고 8쪽에서 그 활동내용을 소개하고 있다. 57쪽에서 GAP Project가 대한민국의 K.R.C.에 의해 이루어지고 있음을 소개하고 있다. ○ 교육장을 활용한 미얀마 농업관계 공무원과 학생에 대한 교육이 이루어지고 있고 인계인수가 끝난 2013. 12월에도 교육이 실시되고 있다. ○ 조성된 시범농장에서 GAP 기준에 맞는 영농이 계속되고 있으며 채소류의 생산 및 처분을 3회에 걸쳐 실시하였다. ○ 아직 미얀마 일반 소비자나 생산 농민에게 생소한 새로운 제도이지만 미얀마 농업관개부의 적극적인 의지로, 빠른 시일 내에 정착된 것으로 예상된다. ○ 본 프로젝트가 시기적으로 미얀마 정부의 농업정책 방향과 잘 맞아 프로젝트 규모에 비하여 미얀마의 농업정책 수립과 세부시행 방침에 크게 기여하게 되었음을 매우 기쁘게 생각한다.