• Title/Summary/Keyword: project size

Search Result 917, Processing Time 0.028 seconds

Prediction and Evaluation of Schedule Exceptions on the EPC Projects of Overseas Plants (플랜트 프로젝트 일정위험 예외상황 예측 및 평가)

  • Sung, Hongsuk;Jung, Jong-yun;Park, Chulsoon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.4
    • /
    • pp.72-80
    • /
    • 2016
  • The market size of plant projects in overseas is so large that domestic EPC project contractors are actively seeking the overseas projects and then trying to meet completion plans since successful fulfillment of these projects can provide great opportunities for them to expand into new foreign markets. International EPC projects involve all of the uncertainties common to domestic projects as well as uncertainties specific to foreign projects including marine transportation, customs, regulations, nationality, culture and so on. When overseas project gets off-schedule, the resulting uncertainty may trigger unexpected exceptions and then critical effects to the project performance. It usually require much more time and costs to encounter these exceptions in foreign sites compared to domestic project sites. Therefore, an exception handling approach is required to manage exceptions effectively for successful project progress in foreign project sites. In this research, we proposed a methodology for prediction and evaluation of exceptions caused by risks in international EPC projects based on sensitivity analysis and Bayesian Networks. First, we identified project schedule risks and related exceptions, which may meet during the fulfillment of foreign EPC projects that is performed in a sequence of engineering, procurement, preparatory manufacture, foreign shipping, construction, inspection and modification activities, and affect project performance, using literature review and expert interviews. The impact of exceptions to the schedule delay were also identified. Second, we proposed a methodology to predict the occurrence of exceptions caused by project risks and evaluate them. Using sensitivity analysis, we can identify activities that critically affect schedule delay and need to focus by priority. Then, we use Bayesian Networks to predict and evaluate exceptions. Third, we applied the proposed methodology to an international EPC project example to validate the proposed approach. Finally, we concluded the research with the further research topics. We expect that the proposed approach can be extended to apply in exception management in project management.

Algorithm selecting Software development route suitable for Project environment and characteristics (프로젝트 환경과 특성에 따른 소프트웨어 개발 경로 선정 알고리즘)

  • Jung Byung-Kwon;Yoon Seok-Min
    • The KIPS Transactions:PartD
    • /
    • v.13D no.1 s.104
    • /
    • pp.87-96
    • /
    • 2006
  • This paper focused on the method for customizing software development path, considering the project environments and characteristics. he selection standard of development path is composed of ten items, based on the process of ISO/IEC TR 15721 Information Technology Guide for ISO/IEC 12207 (Software Life Cycle Process) and ISO/IEC 15504 Information technology - Process assessment. The ten items were reflected the project environments and characteristics, at the same time the items conduct the adjustment item of selecting project development path. An algorithm for selecting software development path through items of the project environments and characteristics is presented. To test the algerian in this paper, a system for selecting development path, which reflected algorithm was developed. The development project for web-based system were also adopted to the system for selecting development path. In addition, provened hand-worked project path process differed from machine-worked project path process. The reason why it differs is that outputs were mixed or their names were changed. The effect is to select easily software development route suitable for project environment and characteristics.

A Case Study on Resident Participative Primary Design of Integrated Rural Development Project with Master Planner - Onui Area in Hong Seong - (총괄계획가 시범사업에서 주민참여 기본계획 사례연구 - 홍성 오누이권역을 대상으로 -)

  • Jung, Nam Su
    • Journal of Korean Society of Rural Planning
    • /
    • v.21 no.4
    • /
    • pp.167-175
    • /
    • 2015
  • The aim of this study is to establish resident-participative primary design of integrated rural development project with master planner by setting principals of open competition and transparent decision-making about village-to-village or business-to-business unit enterprise in Onui area, Hong-seong Gun. For effective processing, software projects such as residents education and rural landscape planning are simultaneously conducted for enhancing project understanding and comprehensive development plan including related post project. Above all, competition teams for individual project were organized to establish the resident-participative primary design using survey tables of residents demand. In 6 months resident-participative processing of primary design, continuous education and visiting to advanced area are conducted in team unit. Strengthened ability of team unit can be used in management and maintenance after project development. To do this, residents with the same opinions gathered as one competition team and identified business plans such as village asset, business location, size, program, and method for land securing. Favorable decision-making process by residents who are audience in project presentation of competition team has conducted. After selecting competition teams, continuos consulting are operated for establishing operation and management for developed or remodeled facilities through repetitive education and visiting advanced area. In this process, unit project suggested by competition team are completed. Preliminary selection was conducted by experts who were entrusted by residents. After residents agreement of project main stream such as major facilities and location, final detailed cost of projects are work out. Suggested process in this study which choose the final project by residents would improve residents' voluntary participation in integrated rural development project through open competition in establishing primary design.

Analysis of Economic Effects of the Land Utilization and Promotion Projects(In the Case of Sinseok Area, Dangjin Districts in Chungnam Province) (농지이용증진사업의 경제효과분석)

  • Park, Jae-Keun;Lim, Jae-Hwan
    • Korean Journal of Agricultural Science
    • /
    • v.25 no.2
    • /
    • pp.293-309
    • /
    • 1998
  • This study is aimed at identifying the decision making criteria as B/C ratio, IRR and NPV based on the expected benefits and costs of the land utilization and promotion projects which have implemented to improve agricultural structure under WTO system. To carry out the objectives of the study, Sinseok project area located at Dangjin district, Chungnam province was selected. Sinseok project area has 306.2 ha of paddy area with 172 farm households. The project area will be operated by the 33 specialized farm households after completion of the project which will have 20 years of economic life. After completion of the project, farm size will be increased from 1.8ha to 9.3ha. Land intensity of the project area will be increased by 10%. Increase of land productivity and cost saving due to the labor saving technology as farm mechanization will be expected. According to the survey results, the annual amount of production cost savings per farm was estimated 3.884million won and increased total farm income was expected about 43.8million won per year. The total expexted project benefits was expected 174million won per year. The project costs to promote land utilization and structural change consisted of handling charges, and direct payment for land movility. The decision making criteria representing economic feasibility of the project such as B/C ratio, NPV and IRR were estimated 2.49, 483million won and 30% respectively when the cut-off rate was taken into account 10%. In conclusion, the land utilization and promotion project proppeled by the Korean Government under the agricultural land law is considered economically feasible from the view points of expected project benefits and costs. Accordingly the project have to be implemented more strongly under the G't financial support considering WTO and UR negociation which were aimed at achieving the free trade and improvement of international competitiveness of farm products.

  • PDF

High Loading for Air Pollution in the Byunsan Peninsula of Korea by an Interplay of the Saemangeum Project and Winter Monsoon

  • Ma, Chang-Jin;Kang, Gong-Unn;Kim, Ki-Hyun
    • Asian Journal of Atmospheric Environment
    • /
    • v.6 no.3
    • /
    • pp.234-243
    • /
    • 2012
  • The wintertime high loading for atmospheric pollutants is certainly expected in the Byunsan Peninsula of Korea because of a great-scale reclamation project having construction of 33 km tidal sea dike impounding an area of over 40,000 ha and long-range transport. The goal of this study is to trace the origin of this wintertime burden for ambient particulate matter (hereafter called "PM") in the Byunsan Peninsula of Korea. The size-segregated (i.e., cutoff size from 0.01 ${\mu}m$ to 4.7 ${\mu}m$) PM sampling was conducted at a ground-based site of Byunsan Peninsula located in the west coast of Korean Peninsula during the height of dike constructing. Data archived in this study are the mass concentrations of ionic, elemental, and carbonic components in size-fractioned PM. The elemental mass of individual submicrometer particles was also analyzed. The sum of 5-source (i.e., elemental carbon, organic materials, inorganic secondary pollutants, crustal matter, and sea-salts) concentrations shows the bimodal distribution (major and minor peaks formed around $D_p$, 0.65 ${\mu}m$ and $D_p$, 4.7 ${\mu}m$, respectively) by border with 0.19 ${\mu}m$ of cutoff size. The concentrations of EC in $PM_{1.1-0.01}$ in winter and spring times were 4.62 ${\mu}g\;m^{-3}$ and 3.74 ${\mu}g\;m^{-3}$, respectively. Elemental masses of submicron individual particles are classified into two groups, i.e., the major elements (Cl, Al, Si, S, and P) and the minor trace elements. Cluster analysis differentiated the elements in submicron individual particles into 4-cluster. Among them, three clusters are in agreement with the major (Al, Si, S, and P), minor (Fe, Ca, and K), and trace compositions of coal burning. Meanwhile, Cl classified as an independent cluster has different source profile which was mainly due to the Saemangeum seawall project. Some highly toxic elements (e.g., Cr, Mn, and As (and/or Pb)) were also detected in some part of submicron individual PM. As a consequence, the combination of the Saemangeum project and winter monsoon played a considerable part in the double aggravation of wintertime air pollution in the Byunsan Peninsular.

A Factor Analysis of the Size Decision of Community Facilities in Rural Village - Focused on Community Facilities Developed by the Rural Development Project - (농촌마을 커뮤니티시설 규모설정 요인분석 - 농산어촌지역개발로 조성된 커뮤니티시설을 중심으로 -)

  • Hwang, Sungki;Cho, Seonggeol;Eom, Seong Jun;Qu, Rui;Ha, Deokcheon;Jeong, Kiseok;Kang, Hyunmo;Rhee, Shinho
    • Journal of Korean Society of Rural Planning
    • /
    • v.25 no.1
    • /
    • pp.99-111
    • /
    • 2019
  • To analyze main factors of size planning of community facilities that were created as part of development of a rural area, the present condition of factors deciding size of community facilities was analyzed, factors that influence size planning by the type of community facility were drawn with Delphi anaysis. The results of analyzing the present condition of size planning factors of community facilities show that facilities have been generally planned as multi-purpose and multi-functional facilities. And on the basis of the purpose of facilities, their functions and organization, and their operation programs, facilities are classified into community-centered, agritourism-centered, and combined ones. Using Delphi analysis, major factors that could affect size planning of community facilities were drawn on 26 community-centered, 28 agritourism-centered, and 30 combined. And the factors tended not to be applied well for size planning of community facilities.

A Study on the Calculation of Organization Scale in Construction Management -Focusing on Building Construction- (건설사업관리(CM) 관리인력 규모산정을 위한 사례연구 - 공공공사 건축공사 사례를 중심으로 -)

  • Ahn, Sang-Hyun;Kim, Jin-Dae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.65-72
    • /
    • 2013
  • While growth of domestic CM market has slowed down due to economic recession, it recently shows sign of scale as some public agencies are relocating their headquarters. Since the introduction of CM system, a number of client organizations have acquired construction project management capabilities, however, sufficient efforts are not made to estimate the size of construction project management organization. This study drew a method for estimating the size of the organization managing construction project by utilizing statics analysis and project costs per member based on 10 public construction projects and tried to review applicability through case studies. With this study, we would like to make a contribution to achieving smoother work performance and success of the construction project by estimating and allocating proper scale of management workforce.

Software Development Process for Project Complexity and Size (프로젝트 난이도와 규모에 따른 소프트웨어 개발 프로세스)

  • Yoon, Seok-Min;Kim, In-Sik
    • Journal of the Korea Society of Computer and Information
    • /
    • v.14 no.6
    • /
    • pp.33-40
    • /
    • 2009
  • In this thesis, for the assessment of software development process for project complexity and project size : one of digital watermarking algorithm is selected and examined. Digital watermarking provides a solution to illegal copying of digital contents and has many other useful applications, including web broadcast monitoring, transaction tracking, authentication, copy control and device control. This thesis focused on the method for customizing software development path, considering the project environments and characteristics. The selection standard of software development path is composed of process items, based on the ISO/IEC 15721 Information Technology Guide for ISO/IEC 12207 (Software Life Cycle Process) and ISO/IEC 15504 Information technology - Process assessment. To evaluate the algorithm, a system for selecting development path, which reflected algorithm, was examined.

Studies on the Control of Porosity and Mean Pore Size in Cordierite Ceramics (Cordierite의 기공률 및 기공경조절에 관한 연구)

  • Yang, Jin
    • Journal of the Korean Ceramic Society
    • /
    • v.35 no.4
    • /
    • pp.399-405
    • /
    • 1998
  • The effect of each factor on the porosity and mean pore size of cordierite(2Mg$.$2{{{{ {Al}_{2 } {O }_{3 } }}$.$5{{{{ {SiO}_{2 } }}) ceram-ics which have been mainly used for hot gas filter was investigated by using orthogonal array. The poros-ity was observed to increase with the content of graphite added as pore-forming material and decrease with increasing talc size. The effects of the other factors the graphite size sintering temperature and hold-ing time at sintering temperature were observed to be small relatively. In case of mean pore size the ef-fect of talc size on the mean pore size of cordierity was investigated to be the largest. The mean pore size was observed to increase with increasing talc size.

  • PDF