• 제목/요약/키워드: production management component

검색결과 141건 처리시간 0.035초

분산객체와 XML 기반의 생산계획 컴포넌트 개발에 관한 연구 (A Study on Software Component Development for Production Management Using Distributed Objects and XML Technologies)

  • 민대기;장태우;박찬권;박진우
    • 산업공학
    • /
    • 제15권1호
    • /
    • pp.10-19
    • /
    • 2002
  • New trends such as electronic commerce, virtual organizations, e-business applications, etc. increase the dependence of production management on information software systems and contribute to the needs for global, distributed object systems. This paper presents a component based approach for production management systems under the multi-tier distributed information system architecture using UML(Unified Modeling Language), CORBA(Common Object Request Broker Architecture) and XML(eXtensible Markup Language) technologies, and propose rules for mapping a UML class diagram to a XML DTD (Document Type Definition). And we adapt it to the prototype system implementation. The components are implemented by CORBA and we use XML messages for the information exchange between components.

적시 부품 공급 계약을 갖는 두 단계 공급망에서 부품 생산과 재고 분배의 통합적 구현 (Coordination of Component Production and Inventory Rationing for a Two-Stage Supply Chain with a VMI Type of Supply Contract)

  • 김은갑
    • 한국경영과학회지
    • /
    • 제37권2호
    • /
    • pp.45-56
    • /
    • 2012
  • This paper considers a supply chain consisting of a component manufacturer and a product manufacturer. The component manufacturer provides components for the product manufacturer based on a vendor-managed inventory type of supply contract, and also faces demands from the market with the option of to accept or reject each incoming demand. Using the Markov decision process model, we examine the structure of the optimal production control and inventory rationing policy. Two types of heuristics are presented. One is the fixed-buffer policy and the other uses two linear functions. We implement a computational study and present managerial insights based on the observations.

Component Commonality and Order Matching Rules in Make-to-Forecast Production

  • Morikawa, Katsumi;Deguchi, Yusuke;Takahashi, Katsuhiko;Hirotani, Daisuke
    • Industrial Engineering and Management Systems
    • /
    • 제9권3호
    • /
    • pp.196-203
    • /
    • 2010
  • Make-to-forecast production is a way to realize high customization and fast responsiveness. This study firstly investigates the effect of introducing a common component in a make-to-forecast production environment. The common component can eliminate a modification step, which is a major cost component in make-to-forecast production. It is illustrated, however, that introducing a versatile component that merely covers several variants is unattractive, and thus adding values to the common component is inevitable in this environment. Secondly, an order-matching rule under the condition that two partially overlapped delivery lead time intervals exist is proposed. The rule considers the effect of matching orders to units that can cover both intervals. An alternative re-matching rule is also developed and examined. Numerical experiments clarify that the proposed rule generally realizes higher contribution ratio and lower percentages of orphans and rejected orders. The proposed re-matching rule increases the average contribution ratio at the expense of increased orphans and order rejections.

회전익기 다품종부품 개발을 위한 형상관리 체계 (Configuration Management System for Rotorcraft Multi-Component Developement)

  • 김현기;김학범;김성찬
    • 한국항공운항학회지
    • /
    • 제20권3호
    • /
    • pp.35-43
    • /
    • 2012
  • Medium size rotorcraft consist of approximately 5,000 key components. The components must satisfy the target weight and performance requirement through optimization. Therefore a rotorcraft component has approximately 100 times higher unit cost for mass production than the equivalent of an automobile's, along with huge development cost. Configuration management consists of four main parts : configuration identification, configuration control, configuration audit, and data management. In development programme, configuration management is one of the methods to save development cost, and setting a well-structured configuration management system according to the Military Standard is an important factor in success of the programme. The paper proposes a configuration management system suitable for development of various multi-use components development and presents that the configuration management was performed successfully during dual-use component development programme using the established system.

자동차부품기업의 UML기반 자재관리시스템 설계 및 구현 (Design and Implementation of UML-Based Material Management System for Automotive Part Company)

  • 박정혁;서기철;문태수
    • 한국정보시스템학회지:정보시스템연구
    • /
    • 제12권2호
    • /
    • pp.129-149
    • /
    • 2003
  • One of the important applications in Enterprise Resource Planning(ERP) systems is the Manufacturing Resource Planning(MRPII) system using Bill of Material(BOM). The manufacturing resource planning determines the quantity and timing of the production or purchase of subassemblies and raw materials needed to support the Master Production Scheduling(MPS). The bill of material is the recipe, a list of the materials needed to make a product. This paper intends to suggest a component-based materials management system using Unified Modeling Language(UML), as an application system for automobile part industry. Applying component based materials management systems designed with UML methodology, we analyzed the workflow and the document on materials management process from production planning to inventory management, and implemented a prototype of efficient materials management system, as a surrogate of existing material requirement planning(MRPI) system. To produce many other assemblies for a automobile part firm, component parts are assembled into subassemblies that are joined to assemble the finished product. Through the system suggested in this study, the level of inventory has cut down and the cost of inventory management has decreased. Also, the development method using UML makes the analysis and design phase to shorten in implementation period of MRPII system. The implementation of materials management system using CBD shows the ease of use in software reuse and the interoperability with corporate Internal information system. The result of applying object-oriented CBD technique is to minimize the risk of life cycle and facilitate the reuse of software as mentioned to limitation of information engineering methodology.

  • PDF

Development of production planning system for shipbuilding using component-based development framework

  • Cho, Sungwon;Lee, Jong Moo;Woo, Jong Hun
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • 제13권1호
    • /
    • pp.405-430
    • /
    • 2021
  • Production planning is a key part of production management of manufacturing enterprises. Since computerization began, modern production planning has been developed starting with Material Requirement Planning (MRP), and today Enterprise Resource Planning (ERP), Advanced Planning and Scheduling (APS), Supply Chain Management (SCM) has been spreading and advanced. However, in the shipbuilding field, rather than applying these general-purpose production planning methodologies, in most cases, each shipyard has developed its own production planning system. This is because the applications of general-purpose production planning methods are limited due to the order-taking industry such as shipbuilding with highly complicated construction process consisting of millions of parts per ship. This study introduces the design and development of the production planning system reflecting the production environment of heavy shipyards in Korea. Since Korean shipyards such as Hyundai, Daewoo and Samsung build more than 10 ships per year (50-70 ships in the case of large shipyards), a planning system for the mixed production with complex construction processes is required. This study draws requirements using PI/BPR (process innovation and business process reengineering) methodology to develop a production planning system for shipyards that simultaneously build several ships. Then, CBD software development methodology was applied for the design and implementation of planning system with drawn requirements. It is expected that the systematic development procedure as well as the requirements and functional elements for the development of the shipyard production planning system introduced in this study will be able to present important guidelines in the related research field of shipbuilding management.

주문- 조립시스템의 설계 및 성능평가 (Design and Performance Evaluation of an Assemble-To-Order System)

  • 박찬우;이효성
    • 한국경영과학회지
    • /
    • 제27권4호
    • /
    • pp.41-65
    • /
    • 2002
  • We study a multi-component production/inventory system in which individual components are made to meet various demand types. We assume that the demands arrive according to a Poisson process, but there is a fixed probability that a demand requests a particular kit of different components. Each component is produced by a flow line with several stations in which the processing times of each station follow a two-stage Coxian distribution. The production of each component is operated by an independent base-stock policy with blocking. We assume that the time needed to assemble final products follows a general distribution and the capacity of an assembling facility is sufficiently large. The objective of this study is to obtain key performance measures such as the distribution of the number of each orders for each final product and the mean time of fulfilling a customer order. The basic principle of the proposed approximation method is to decompose the original system into a set of subsystems, each subsystem being associated with a flow line. Each subsystem is analyzed in isolation using a Marie's method. An iterative procedure is then used to determine the unknown parameters of each subsystem. Numerical results show that the accuracy of the approximation method is acceptable.

ActiveX 컴포넌트를 이용한 철도 지반정보 관리프로그램의 개발 (Development of the Railroad Geotechnical Information Management System using ActiveX Component)

  • 황선근;이성혁;김현기;김정무
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2003년도 추계학술대회 논문집(II)
    • /
    • pp.436-441
    • /
    • 2003
  • The railroad geotechnical management system using ActiveX component is developed In this study. Component software is realized as a way that can offer good productivity and stability in software production through maximizing the reusability of software. Developed component software is very useful in saving to much time required for the development, increasing the re-usage rates, utilizing the component per function and substantially reducing the expenses for the tests and the error corrections. In addition, since it is easy to replace with other types of components that satisfy the needs of users, we can easily customize the applications.

  • PDF

알루미늄 합금 제조공정에서의 선형계획모델 기반 재활용 원재료 혼합 비율 결정 알고리즘 (A Linear Programming-Based Algorithm for Raw Recycled Material Mixtures in the Aluminum Alloy Fabrication Process)

  • 강민주;김지훈;송경진;변유진;김재곤
    • 산업경영시스템학회지
    • /
    • 제47권2호
    • /
    • pp.40-47
    • /
    • 2024
  • As environmental concerns escalate, the increase in recycling of aluminum scrap is notable within the aluminum alloy production sector. Precise control of essential components such as Al, Cu, and Si is crucial in aluminum alloy production. However, recycled metal products comprise various metal components, leading to inherent uncertainty in component concentrations. Thus, meticulous determination of input quantities of recycled metal products is necessary to adjust the composition ratio of components. This study proposes a stable input determination heuristic algorithm considering the uncertainty arising from utilizing recycled metal products. The objective is to minimize total costs while satisfying the desired component ratio in aluminum manufacturing processes. The proposed algorithm is designed to handle increased complexity due to introduced uncertainty. Validation of the proposed heuristic algorithm's effectiveness is conducted by comparing its performance with an algorithm mimicking the input determination method used in the field. The proposed heuristic algorithm demonstrates superior results compared to the field-mimicking algorithm and is anticipated to serve as a useful tool for decision-making in realistic scenarios.

조선소 생산공정모니터링 시스템 개발을 위한 요구사항 분석 및 아키텍처 수립 (Requirement analysis and architecture establishment for ship production monitoring system)

  • 이광국
    • 한국정보통신학회논문지
    • /
    • 제18권9호
    • /
    • pp.2079-2086
    • /
    • 2014
  • 조선소에서 생산관리는 생산성 향상과 가장 밀접한 업무 중의 하나이다. 현업 생산관리자와 공정계획 엔지니어들은 상호 간의 정보 공유 미흡으로 인해 공정계획 및 공정관리에 대한 충분한 생산정보를 얻지 못한다. 본 연구에서는 생산계획과 공정관리의 요구사항 분석을 통하여 생산공정모니터링 시스템에 대한 주요 이슈를 도출하고, 콤포넌트 기반 설계 기법을 활용하여 시스템 아키텍처를 수립하였다. 제안한 시스템의 주요 기능은 블록 조립에서 안벽의장 단계까지 수립하여 생산공정현황을 시각적으로 보여 줄 뿐 아니라 공정정보 공유를 극대화하는 것이다. 본 시스템은 생산관리자에게 신뢰성 있고 정확한 생산 정보를 제시간에 제공할 수 있을 것으로 기대된다.