Cryogenic Distillation Apparatus for Hydrogen Isotopes Separation (수소동위원소 분리를 위한 초저온증류장치)

  • 송규민;손순환;김광신;김위수
    • Proceedings of the Korea Institute of Applied Superconductivity and Cryogenics Conference
    • /
    • 2001.02a
    • /
    • pp.163-166
    • /
    • 2001
  • KEPCO has a plan to construct TRF (tritium removal facility) in wolsong nuclear power plant site by 2005. In advance of WTRF construction, the pilot plant was installed at KEPRI in order to show process reliability of WTRF. The main processes of this pilot plant are LPCE(liquid phase catalytic exchange) and CD (cryogenic distillation). Deuterium is separated from heavy water in LPCE process and concentrated in CD process. CD process consists of cold box, where are a distillation column and heat exchangers, vacuum system, cryogenic refrigerant supply system and instrument & control system. The experience of the pilot plant will be used in WTRF design review, operating procedure revision and fundamental education for the operators.

  • PDF

Process Model for development of EVMS in Nuclear Power Plant Project (원전건설 성과관리시스템(EVMS) 개발을 위한 프로세스 모델 연구)

  • Kim, Yun-Myung;Won, Seo-Kyung;Shin, Il-Sub
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.58-59
    • /
    • 2014
  • EVM(Earned Value Management) is a management methodology for integrating scope, schedule and resources, and for objectively measuring project performance and progress. EVMS(Earned Value Management System) has been used for the performance measurement of R&D and construction projects in developed countries such as United States, United Kingdom and Australia. The nuclear power plant (NPP) projects in Korea have not applied EVMS. However, EVMS has come into request for overall schedule and cost risk management and performance measurement in overseas project of the nuclear power plant as a contractor. In this paper, based on the global EVMS guidelines, EVMS per unit processes have been developed for NPP projects. Moreover, using Business Process Management (BPM), it proposes an integrated process model with tasks, roles, and procedures for EVMS for NPP construction projects.

  • PDF

Main Steam Temperature Controller Design of a Fossil Power Plant by Generic Model Control (Generic Model Control에 의한 화력발전소의 주증기 온도제어기 설계)

  • Cho, Y.C.;Nam, H.K.;Lee, K.S.;Yoon, S.H.
    • Proceedings of the KIEE Conference
    • /
    • 1995.07b
    • /
    • pp.673-675
    • /
    • 1995
  • A nonlinear process-model based control for main steam temperature control of a 100MW oil-fired drum-type fossil power plant is delveloped and its performances are compared to those of the conventional PID control. The process model for simulation is derived based "first priciple approach" and is validated in steady and transient conditions. The model is in good agreements with the field test data. Performances of the nonlinear PMBC for main steam temperature control are far superior to those of PID in all aspects for the disturbances of ramp increase in load and step change in fuel Btu value.

  • PDF

Development of EPC Business Process Management Model for Improving Plant Project Management (플랜트프로젝트 사업관리 업무절차 개선을 위한 EPC 수행단계별 BPM모델 개발)

  • Park, Bum-Jin;Lee, Min-Jae;Lee, Tai-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.149-158
    • /
    • 2008
  • Plant construction is being a motive power of national economic growth, because it is a higher value-added business which has enormous influence through other industry. But, plant projects management of the domestic company was poor. So, the development of EPC Business Process Management method has been encouraged. Therefore, this paper performed several researches for setting up the EPC Business Process Management Model for improving plant project management. And the details are as follows. First of all, this study collected the work procedure manuals of 12 large-sized international construction companies. Secondly, from the analyzing gathered EPC work procedure manuals, issues of work procedure manuals were analyzed and improvement plans were drawn out. Basis on this, This study presents a method to improve project management for EPC plant project. 'The Work Procedure Matrix for EPC Management' and 'Key Unit Works for EPC Management' were drawn out by using overseas construction management theories and international regulations. In addition, 'The EPC Business Process Management Models' reformed to the Business process method, that is the set of specifications, documents and procedures used to manage the EPC plant project. And it describes how the EPC work procedure manuals will be used. Finally, this study suggests the model of EPC Business Process Management System. The framework of Plant project management can be clarified by using 'The Work Procedure Matrix'. And 'Key Unit Works' are used to organize the work procedure needed to improve plant projects management. The results of this study will help to improve in project management efficiency for plant construction.

Changes of Gas Conditions of Iron Ore Sintering Process with FGR (제철 소결의 배가스 순환 적용에 따른 가스 조건 변화)

  • Ahn, Hyungjun;Choi, Sangmin;Cho, Byungkook
    • 한국연소학회:학술대회논문집
    • /
    • 2012.04a
    • /
    • pp.19-20
    • /
    • 2012
  • Flue gas recirculation(FGR) is applied to sintering process to cope with issues including plant efficiency and environmental effects. However, it inevitably brings changes of incoming and outgoing gas conditions as plant configurations. Objective of this study was to build a process model for a sintering bed using a flowsheet process simulator and obtain information of mass and heat balance for gas flows over various process configurations with FGR.

  • PDF

Gradational Risk Management in Procurement Phase for Plant Projects (플랜트 프로젝트의 구매조달 단계별 리스크 분석에 관한 연구)

  • Na, Sung-Yub;Moon, Seung-Jae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.5 no.3
    • /
    • pp.59-65
    • /
    • 2009
  • In the plant EPC project, the procurement work can be considered as the most important part that affects the success or failure of project as it has the closest mutual influence in every execution process of the project. Procurement takes up generally 60% ~ 70% of the entire project budget and the current trend of plant EPC project becoming larger in scale and a variety of process technology being applied. So, it is needed to identify the risks that are expected to occur according to the stages of procurement work, namely, proposal stage, manufacturer selection and purchasing agreement stage, expediting the process management of manufacturer stage, inspection stage and logistics & transportation stage. The management of observation and control of the risks should be performed with the response techniques which are 'avoid',' transfer'and' mitigate'.

  • PDF

Development on Cleaning System of Condenser for Nuclear Power Plant by Using Sponge Ball (스펀지 볼을 이용한 원전용 복수기 튜브 세정 시스템 개발)

  • Yi, Chung-Seob;Lee, Chi-Woo
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.14 no.6
    • /
    • pp.21-26
    • /
    • 2015
  • This study presents a development of the cleaning system in a nuclear power plant condenser. The tube cleaning system is very important equipment in a power plant condenser. Specially, removal of the fouling is a key process in the condenser tube. The objective of this study is development of a ball collector system for cleaning a condenser by using a sponge ball. This study uses CFD in order to optimize design of the ball strainer screen. Through the CFD, the implication of the ball strainer screen for static pressure distribution is examined. Results of research, this study have developed a 1/5 scale model for application to the power plant and developed a performance test equipment.

A study on the adaptive predictive control of steam-reforming plant using bilinear model (쌍일차 모델을 이용한 스팀개질 플랜트의 적응예측제어에 관한 연구)

  • 오세천;여영구
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1996.10b
    • /
    • pp.156-159
    • /
    • 1996
  • An adaptive predictive control for steam-reforming plant which consist of a steam-gas reformer and a waste heat steam-boiler was studied by using MIMO bilinear model. The simulation experiments of the process identification were performed by using linear and bilinear models. From the simulation results it was found that the bilinear model represented the dynamic behavior of a steam-reforming plant very well. ARMA model was used in the process identification and the adaptive predictive control. To verify the performance and effectiveness of the adaptive predictive controller proposed in this study the simulation results of steam-reforming plant control based on bilinear model were compared to those of linear model. The simulation results showed that the adaptive predictive controller based on bilinear model provides better performance than those of linear model.

  • PDF

Analysis of Cool-down Operation of Liquid Hydrogen Tank (액체수소 저장탱크의 냉각 방법 분석)

  • HWALONG YOU;BYUNGIL CHOI;KYUHYUNG DO;TAEHOON KIM;CHANGHYUN KIM;MINCHANG KIM;YONGSHIK HAN
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.34 no.6
    • /
    • pp.641-649
    • /
    • 2023
  • This study analyzes the cool-down process of liquid hydrogen storage tanks, which have advantages in terms of large-capacity transfer, storage, and utilization as hydrogen demand increases. A hydrogen liquefaction plant is selected for analysis and an efficient tank cooling method is sought by comparing the time required for the cool-down process with the gas consumption in connection with the gassing-up process required for the operation of the liquid hydrogen storage tank. The results of this study can be referred to in the operation process after the initial start-up and maintenance of the hydrogen liquefaction plant.

Simulation of the dihydrate process for the production of phosphoric acid

  • Yeo, Y.K.;Cho, Y.S.;Moon, B.K.;Kim, Y.H.
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1988.10b
    • /
    • pp.875-878
    • /
    • 1988
  • In this work it is shown how the methods used in chemical engineering for the analysis and simulation of processes may be applied to the actual phosphoric acid plant. Attention has been focused on the dihydrate process for which the necessary fundamental experimental data and plant operation data are available. The results of the simulation have shown that a reasonable description of the process at hand is possible by the proposed method. However, because of the complexity of the process, of the limited basic experimental data reported in literature, and the limitations of mathematics, the model was somewhat idealized and gave a reliable representation of the influence of only a few of the variables that affect the performance of the plant.

  • PDF