• Title/Summary/Keyword: proceeding bearing

Search Result 2,015, Processing Time 0.03 seconds

Optimization of Hot Forging Process of Flange Type Wheel Bearings by Statistical Technique (통계적 기법을 활용한 플랜지형 휠베어링의 열간단조 공정 최적화)

  • Lee, J.S.;Moon, H.K.;Song, B.H.;Hur, B.Y.
    • Proceedings of the Korean Society for Technology of Plasticity Conference
    • /
    • 2006.05a
    • /
    • pp.434-437
    • /
    • 2006
  • Due to the shape of spindle with small diameter and heavy section, rapid cooling is difficult. It is difficult to fabricate the tapered wheel bearings with fine microstructure. Thus, their mechanical characteristics, such as yield strength and fatigue resistance, decrease. Producing the tapered wheel bearings with good workability during orbital forming after hot forging, hot forging process with several process parameters was optimized by means of statistical technique of Six-Sigma scheme. As a result, the lower heating temperature is, the lower the hardness and yield strength of forgings are. Also, the faster conveyer velocity is, the lower the hardness and yield strength of forgings are. To avoid therefore occurrence of the surface rupture during orbital forming, the heating temperature should be controlled as low as possible and the conveyer velocity should be controlled as fast as possible.

  • PDF

Dry sliding wear behavior of plain low carbon dual phase steel by strain hardening and oxidation (가공경화와 산화층 형성에 의한 이상조직 저탄소강의 건식 미끄럼 마멸 거동)

  • Yu, H.S.;Kim, Y.S.
    • Proceedings of the Korean Society for Technology of Plasticity Conference
    • /
    • 2006.05a
    • /
    • pp.149-152
    • /
    • 2006
  • Dry sliding wear behavior of low carbon dual phase steel, of which microstructure consists of hard martensite in a ductile ferrite matrix, has been investigated. The wear characteristics of the dual phase steel was compared with that of a plain carbon steel which was normalized at $950^{\circ}C$ for 30min and then air-cooled. Dry sliding wear tests were carried out using a pin-on-disk type tester at various loads of 1N to 10N under a constant sliding speed condition of 0.2m/sec against an AISI 52100 bearing steel ball at room temperature. The sliding distance was fixed as 1000m for all wear tests. The wear rate was calculated by dividing the weight loss measured to the accuracy of $10^{-5}g$ by the specific gravity and sliding distance. The worn surfaces and wear debris were analyzed by SEM, EDS and a profilomter. Micro vickers hardness values of the cross section of worn surface were measured to analyze strain hardening behavior underneath the wearing surfaces. The were rate of the dual phase steel was lower than the plain carbon steel. Oxidation on the sliding surface and strain hardening were attributed for the higher wear resistance of the dual phase steel.

  • PDF

The Settlement Behavior Analysis of SCP of Multi-Layered Ground in Incheon (인천지역 다층지반에 시공된 SCP의 침하거동 분석)

  • Yoon, Won-Sub;Kim, Jong-Kook;Park, Sang-Jun;Cho, Chul-Hyun;Chae, Young-Su
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.1042-1050
    • /
    • 2008
  • In this study, SCP method was used by purpose to improve loose sand and soft clay that is drilled Sand Compaction Pile in underground. Settlement behavior of field analyzed through SCP method. When sand Compaction Pile drilled in clay, forming composite ground that foundation and Sand Compaction Pile behavior. According to SCP method can expect bearing capacity improvement, Settlement reduction, lateral flow protection. SCP increase the consolidation settlement of ground and it reduce settlement for that purpose increase liquefaction resistance, lateral Resistance. Because SCP had been widely used for sand. Area of Inchon-A by sand compose clay and silt to upper Ground and compose soft clay to under ground. After pre-loading, it measured settlement by extensometer and settlement extensometer that purpose of ground improvement with 13% in replacement ratio. The result analyzed settlement behavior is similar to Multi-layered Ground that it happened to elastic settlement at upper ground and to consolidation settlement at under ground.

  • PDF

A Study on the Negative Skin Friction Depending upon the Locations of Piles in a Group Using Model Test (모형시험을 통한 무리말뚝 내 단독말뚝의 위치별 부주면마찰력에 관한 연구)

  • Lim, Jong-Seok;Park, Jong-Hee;Sim, Jong-Sun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.1077-1087
    • /
    • 2010
  • Generally most of pile foundations are constructed with group pile rather than single pile. The study on efficiency and bearing capacity which are major elements for rational design of this group pile has been actively progressed, whereas there are truly only a few studies of negative skin friction working on group pile due to the consolidation of ground. The purpose of this study is to determine, among the elements of negative skin friction applied to pile, the occurrence modality of negative skin friction at center, side, and corner of $3{\times}3$ group pile using model test and, based on those observations, to propose the effective design direction of group pile.

  • PDF

Determination of Construction Method for Noise & Vibration-Free Screw Concrete Piles (무소음.무진동 스크류콘크리트말뚝의 시공법 설정)

  • Choi, Yong-Kyu;Kim, Dong-Chul;Kim, Sung-Su;Nam, Moom-S.
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.360-368
    • /
    • 2010
  • Noise and vibration triggered by pile driving in a construction site not only give hard time to the surrounding areas but could also cause residents nearby to file civil complaints to the extent of bringing construction to a halt. To deal with this issue, construction engineers have worked strenuously to develop low noise & low vibration pile methods. A noise & vibration-free screw concrete pile method proposed in this study is one of the successful outputs. It penetrates pile underground by rotating and pressing in body of the pile to avert noise and vibration while maximizing bearing capacity. A prototype of noise and vibration-free precast screw pile method was manufactured, which is not seen anywhere in Korea and elsewhere, and have undergone pilot tests twice to determine construction method.

  • PDF

연약지반에 축조하는 강제치환 호안사석의 시공관리방법에 관한 연구

  • Kim, You-Seong;Park, Pyung-Gab
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.1466-1472
    • /
    • 2010
  • In order to construct extremely large scale of sea dike like Saemanguem dike, extremely large amount of mass of rock are needed. In this case, it is general methods to estimate required amount of rock mass based on characteristics of consolidation settlement and bearing capacity of seabed, because it is impossible to estimate exact amount of rock material based on varied seabed condition.. Even in this general methods, it is very few case to manage rock mass amount by estimation of actual input rock mass but the main point is focused on the final section formation considering of designed section and reserve embankment, so excessive or underestimating result of rock mass would be occurred surely. This general methods is not resonable in the points of economic and stable. In this study, optimum construction management method of rubble mound in the 3rd section construction of Saemanguem sea dike is suggested based on comparing required rock mass estimating from consolidation settlement theory with actual input rock mass. It is found out that the optimum input quantity of rock mass is about $1,900{\sim}2,000m^3$/day.

  • PDF

An Experimental Study on the Effects of Bottom Ash Compaction Pile in the Sea Clay Layer (해성 점토지반의 저회다짐말뚝 보강 효과에 관한 실험적 연구)

  • Park, Se-Hyun;Han, Yun-Su;Do, Jong-Nam;Chun, Byung-Sik
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.595-598
    • /
    • 2010
  • Many economical and efficient methods such as sand drain method(SD), plastic board drain(PBD), sand compaction pile, vacuum consolidation method, etc., have been used for soft grounds. The case of sand compaction pile has an effect on accelerating consolidation and increasing bearing capacity by penetration at regular intervals under soft grounds for reducing the drainage path. But, this method has caused not only the nature damage by extracting the sands indiscreetly but also the economical problem for importing the sands because it needs so much sand to make the sand compaction pile. Thus, this study choosed the bottom ash which has similar engineering characteristics with sand. It was performed that clogging test and large direct shear test changing the bottom ash replacement ratio in soft ground for studying strength characteristics of soft ground using bottom ash compaction pile. As a result of the test, the internal friction angle was largely increased and the cohesion was decreased as the replacement ratio increased.

  • PDF

End bearing Behavior of Open-ended Steel Pipe Piles Resting on Harden Cement Milk (시멘트밀크 고결체 위에 강관말뚝 선단 매입된 말뚝거동)

  • Park, Young-Ho;Kim, Sung-Hwan;Kim, Nag-Young;Kim, Hong-Jong;Park, Yong-Seok
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.1140-1147
    • /
    • 2010
  • To find the soil plug of steel piles shaped by jet grouting, 4 blocks of cement milk with cube of 1.2m were made. 4 open-ended steel piles on the blocks were rested. The inner end part of 2 the piles was not reinforced. Cement milk 65%(SIG-1) and 100%(RJP-1) were filled into the block and height of 4.2 times of inner the pile diameter respectively. And the other the piles were welded 2 steel ring. The filling of the cement milk was an equal method as before(SIG-2 and RJP-2). Also the strain gauges were installed and the static pile load tests were done at the piles all. As a result, list in great order for effect of soil plug was (1)SIG-1, (2)SIG-2, (3)RJP-1, (4)RJP-2. This is because of strength and filling height of cement milk. And the higher the strength is, the greater the confining coefficient is.

  • PDF

A Case Study on the Design of High Capacity Foundations for High-Rise Buildings (국외 초고층 건축물의 대형기초 적용 사례)

  • Cho, Sung-Han;Han, Byoung-Kwon;Lee, Je-Man;Kim, Tae-Bum
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2007.09a
    • /
    • pp.78-89
    • /
    • 2007
  • Two design examples of deep foundations for high-rise buildings on soft ground are introduced in this paper. The first one is a 54-story building in Ho-Chi-Minh city, Vietnam, which was designed to be founded on $2.8m{\times}1.0m$ barrette foundations with approximately 60m to 75m depth. Based on a number of design guides and existing load test data from the construction sites in Ho-Chi-Minh city, the capacity of a barrette foundation in sand or clay layered ground was calculated to be 17.2MN to 27.8MN depending on the installing depth. The second one is a 40-story building in Baku city, Azerbaijan, which was designed to be supported by 2.0m diameter bored pile foundations with approximately 23m depth. As analytical or empirical guides for the local ground conditions were very limited, the design procedure from the SNiP Code, one of Russian specifications, was adopted and used to calculate the pile capacity. The capacity of bored pile foundation in highly weathered soil was expected to be 14.8MN to 15.5MN depending on the boring depth.

  • PDF

Load Transfer Characteristics on Drilled Shafts by Hole Stability Fluids (공벽유지용 유체에 따른 대구경 현장타설말뚝의 하중전이특성)

  • Lim, Dae-Sung;Park, Seong-Wan;Park, Jung-Hwan;Oy, Se-Hun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.1100-1105
    • /
    • 2008
  • In most drilled shafts construction sites, it is common, depending on the site condition, to use either water or slurry as fluids for maintaining stability of the holes, however, there are yet no design manuals by hole stability fluids. In this paper, in order to evaluate load transfer characteristics of the drilled shafts by hole stability fluids, two test piles are constructed over the soft ground of the lower Busan Bay based on the Bi-directional Pile Load Test. The test results showed that no ultimate states has found under the condition of applied loads with fresh water and slurry as hole fluids for drilled shafts. Then, the load transfer behavior were estimated with the data measured in fields and the effect of hole stability fluids were compared. All these results are presented in the paper.

  • PDF