• Title/Summary/Keyword: power of test

Search Result 10,124, Processing Time 0.037 seconds

Low Cost SOC(System-On-a-Chip) Testing Method for Reduction of Test Data and Power Dissipation (테스트 데이터와 전력소비 단축을 위한 저비용 SOC 테스트 기법)

  • Hur Yongmin;Lin Chi-ho
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.41 no.12
    • /
    • pp.83-90
    • /
    • 2004
  • This paper proposes an efficient scan testing method for compression of test input data and reduction of test power for SOC. The proposed method determines whether some parts of a test response can be reused as a part of next input test data on the analysis of deterministic test data and its response. Our experimental results show that benchmark circuits have a high similarity between un-compacted deterministic input test data and its response. The proposed testing method achieves the average of 29.4% reduction of power dissipation based on the number of test clock and 69.7% reduction of test data for ISCAS'89 benchmark circuits.

Wireless Measurement Technology for Power Plant Performance Diagnosis (발전설비의 성능진단 적용 무선계측 기술)

  • Kim, Ui-Hwan;Lee, Eung-Gon;Hong, Eun-Gi
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.3 no.1
    • /
    • pp.9-16
    • /
    • 2017
  • The performance test is conducted for the purpose of determining the accurate thermal performance of the power generation facility or deriving the factors of thermal efficiency degradation. Compared to the acquisition method of power plant thermal performance test data by compensating cable or transmission cable, performance test using wireless instrument can acquire digital data in order to shorten the period due to installation and demolition of instrument and enhance safety of workers and relatively accurate data can be acquired thereby improving work efficiency. Wireless instruments have already been introduced to the market a long time ago, and some of them are used in industry such as petrochemical industry. However, there is no example which has been conducted for performance test of power generation facilities. In order to apply power generation facilities, a reliable system capable of acquiring performance data smoothly without affecting the control system is required. The wireless measurement system can eliminate the measurement defects and errors such as the damage due to the movement of the connecting cable, the extension due to the extension of the shield wire, the contact failure at the contact point between the measuring sensor and the connecting wire, This method has the advantage of collecting relatively accurate performance test data.

A New Scan Partition Scheme for Low-Power Embedded Systems

  • Kim, Hong-Sik;Kim, Cheong-Ghil;Kang, Sung-Ho
    • ETRI Journal
    • /
    • v.30 no.3
    • /
    • pp.412-420
    • /
    • 2008
  • A new scan partition architecture to reduce both the average and peak power dissipation during scan testing is proposed for low-power embedded systems. In scan-based testing, due to the extremely high switching activity during the scan shift operation, the power consumption increases considerably. In addition, the reduced correlation between consecutive test patterns may increase the power consumed during the capture cycle. In the proposed architecture, only a subset of scan cells is loaded with test stimulus and captured with test responses by freezing the remaining scan cells according to the spectrum of unspecified bits in the test cubes. To optimize the proposed process, a novel graph-based heuristic to partition the scan chain into several segments and a technique to increase the number of don't cares in the given test set have been developed. Experimental results on large ISCAS89 benchmark circuits show that the proposed technique, compared to the traditional full scan scheme, can reduce both the average switching activities and the average peak switching activities by 92.37% and 41.21%, respectively.

  • PDF

The effects of a concentration, an auditory reaction time and a muscle power on an agility (집중력, 청각반응속도, 순발력이 민첩성에 미치는 영향)

  • Kim, Mi-Kyoung;Nam, Ji-Yoon;Noh, Su-Yeong;Han, Dong-Wook
    • Journal of Korean Physical Therapy Science
    • /
    • v.19 no.3
    • /
    • pp.17-22
    • /
    • 2012
  • Background : The purpose of this study was to investigate the relationship between an agility and a concentration, an auditory reaction time and a muscle power. Methods : Twenty one healthy female college students who were 20-21 years participated in the experiment; after being introduced to the methods, they voluntarily signed a consent form. And they received several test related with this study; side step test for an agility, Harris & Harris test for a concentration, brain auditory evoked potential test for an auditory reaction time and vertical jump test for a muscle power. Result : There was no relationship between the agility and the concentration and the auditory reaction time. However, the muscle power related with the agility significantly. Conclusion : In conclusion, these findings suggest that a muscle power training is a good way to promote an agility. So, we can find out that, in an player who requires an agility, a muscle power training is the most important way for promoting an agility than a concentration training or an auditory reaction time training.

  • PDF

Study of a Durability Test for Single-input Multi-output Power Take-off Gearboxes (단일입력 다출력 PTO 기어박스의 내구성시험에 관한 연구)

  • Lee, Yong Bum;Yoo, Han Ju
    • Journal of Drive and Control
    • /
    • v.14 no.1
    • /
    • pp.29-34
    • /
    • 2017
  • This study analyzed a life test method for a power take-off (PTO) gearbox. An engine transfers mechanical power (rotation and torque) to a hydraulic pump through a PTO Gearbox with one input shaft and three output shafts. PTO gear box durability under high loads over long time periods was tested using dynamometers. In order to reflect the rated operating conditions, power must be distributed to each output shaft, and experiments were conducted under various conditions to verify the characteristics of the distributed power. An accelerated life test was designed using speed and torque as acceleration factors. Also, efficiency tests were conducted under various load conditions. Also, a lubrication oil composition analysis was performed to analyze gearbox wear status.

Development and Performance Test of DC Smart Metering System for the DC Power Measurement of Urban Railway (도시철도 직류 전력량 계측을 위한 직류용 스마트미터링 시스템 개발 및 성능시험)

  • Jung, Hosung;Shin, Seongkuen;Kim, Hyungchul;Park, Jongyoung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.5
    • /
    • pp.713-718
    • /
    • 2014
  • DC urban railway power system consists of DC power network and AC power network. The DC power network supplies electric power to railway vehicles and the AC power network supplies electric power to station electric equipment. Recently, because of power consumption reduction and peak load shaving, intelligent measurement of regenerative energy and renewable energy adapted on DC urban railway is required. For this reason, DC smart metering system for DC power network shall be developed. Therefore, in this paper, DC voltage sensor, current sensor, and DC smart meter were developed and evaluated by performance test. DC voltage sensor was developed for measuring standard voltage range of DC urban railway, and DC current sensor was developed as hall effect split core type in order to install in existing system. DC smart meter possesses function of general intelligent electric power meter, such as measuring electricity and wireless communication etc. And, DC voltage sensor showed average 0.17% of measuring error for 2,000V/50mA, and current sensor showed average 0.21% of measuring error for ${\pm}2,000V/{\pm}4V$ in performance test. Also DC smart meter showed maximum 0.92% of measuring error for output of voltage sensor and current sensor. In similar environment for real DC power network, measuring error rate was under 0.5%. In conclusion, accuracy of DC smart metering system was confirmed by performance test, and more detailed performance will be verified by further real operation DC urban railway line test.

A study on the aging characteristics for model III watthour meters (보통전력량계(III 형)의 경년변화 특성연구)

  • Kim, Young-Lae;Hong, Sun-Hak;Park, Ku-Perm;Song, Il-Keun
    • Proceedings of the KIEE Conference
    • /
    • 1993.11a
    • /
    • pp.9-12
    • /
    • 1993
  • This study investigated the propriety and the extension of the term of validity about the using watthour meters at present. The subject of study is 1Cent 2W 220V 30(10)A, 1Cent 3W 110V 30(10)A of model III watthour meters. They are the used metes(products in 1984) and the repaired meters(products in 1977) in the end of the period. The investigation is as follows. o Investigation of external appearance o Driving current test o Creeping test o Noise test o Error test o Durability test. Results of the study have been the number of 13.3% exceeded permitting error and the number of 31.3% failed in endurable test of 500 hours. So, the using meters are not suitable to extend the term of validity without the improvement of several characteristics.

  • PDF

Conformance Test Technique for the Electric Power IT Protocol based on TTCN-3 (TTCN-3를 이용한 전력 IT Protocol Conformance Test 기법)

  • Song, Byeong-Kwon;Jang, Yong-Gi;Jeong, Tae-Eui;Kim, Gun-Woong;Kim, Jin-Chul;Kim, Young-Eok
    • Proceedings of the KIEE Conference
    • /
    • 2008.11a
    • /
    • pp.373-375
    • /
    • 2008
  • TTCN-3(Testing & Test Control Notation Version 3) defined in EISI(2001) are the standardized test specification and test implementation language of applicable for all kinds of black-box testing for reactive and distributed system, telecom systems, Mobile system, Internet, CORBA based system, java, XML, etc. This paper using the TTCN-3 on an Electric Power IT Protocol DLMS(Device Language Message Specification) standards for the implementation of the device equipment test the suitability of the protocol.

  • PDF

The field-test of Power Quality Meter and Power Management System in order to verify the performance (PQM 및 PQMS 성능검증을 위한 실증시험)

  • Choi, Sun-Kyu;Song, Il-Keun;Kwon, Tae-Ho;Han, Jae-Wook
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2005.05a
    • /
    • pp.235-239
    • /
    • 2005
  • This paper gives a field-test method and result of PQM(Power Quality Meter) and PQMS(Power Quality Management System). The field-test was carried out as our own method. So, the test method has several kinds of improvement in this paper because it is first time to try the field-test of the equipment. However, we expect that the test result of PQM & PQMS has been used as a reference data which makes a scheme of evaluating performance of the equipment that has been used or is developed.

  • PDF

Reliability Assessment Criteria of Power Light Emitting Diodes for Lighting fittings (조명용 Power LED의 신뢰성평가기준)

  • Park, Chang-Kyu;Jeong, Hee-Suk;Jeong, Hai-Sung;Baik, Jai-Wook
    • Journal of Applied Reliability
    • /
    • v.9 no.3
    • /
    • pp.219-231
    • /
    • 2009
  • Power light emitting diodes(LED) for lighting fittings are so much environment-friendly, highly reliable and consume less energy that they are widely used at home and in industries such as electronics, telecommunications and industrial machineries. However, they are exposed to a very diverse environment and consists of complex components and, therefore needs careful approach to the enhancement and assessment of reliability of the item. In this article reliability assessment criteria for LED are established in terms of performance assessment test, reliability assessment test and accelerated test.

  • PDF