The purposes of this study were to investigate the operational affecting productivity in hospital foodservice, and to examine the relationships between operational factors affecting productivity. The 28 hospitals over 400 beds in Seoul were mailed questionnaires assessing the factors that affect productivity in hospital foodservice(23 hospitals responded). Data analyses included descriptive statistics. Pearson product moment correlation analysis, and stepwise multiple regression analysis. The result of Pearson product moment correlation analysis indicated that the percentage of patient meals was significantly correlated to the productivity (r=.5560, p<.01). Stepwise multiple regression analysis indicated that the percentage of patient meals and the average work hours of employees were significant predictors of the operational factors at productivity.
The purposes of the study were to identify the operational characteristics in employee feeding facilities, and to examine the correlations of productivity and these characteristics. A questionnaire was developed and mailed the 500 dietitians in employee feeding facilities in Seoul and Kyoungki Do. Usable questionnaires were received from 117 respondents for a response rate of 23.4%. The questionnaire was designed to determine the productivity index and to investigate the relationship between operational characteristics and productivity index. The questionnaire was contained 2 parts with a total of 16 statements. Data were analyzed for descriptive statistics and Pearson correlation analysis using SPSS/PC programs. The average productivity indices of 117 facilities were 6.91 meals/hr. Total meals served/week was significantly correlated to the productivity index (r=0.441, p < 0.001). No of average servings per meal, percentage of convenience food use, average minutes for service/day, and employment in professional practice of dietitian were also positively correlated, while food cost was negatively correlated to the productivity.
Measuring performance of corporate information system has become one of the core issues in that development of the information system requires substantial amount of investments and the system works as a crucial leverage to enhance competitive edge. Most of the previous researches for performance of the information system have narrow and limited focus on such as the effect of user satisfaction and productivity. This paper suggests a model to measures the comprehensive performance which is classified as user scope (user involvement and satisfaction), operational scope (task productivity, task innovation, customer satisfaction, management control) and efficiency scope (financial performance), and to represent the relationship among the scopes by the path analysis model. Followings are conclusions from statistical hypothesis test of the model: (i) user involvement through user satisfaction has positive effect on all the performances in the operational scope, (ii) task innovation and customer satisfaction in the operational scope has statistically significant impact on financial performance but task productivity and management control do not. This conclusion indicates that task productivity and management control has the long term effect in nature, and evaluation of the information system has managerial implication when it Is measured in comprehensive performance which includes internal operational performances as well as financial performance.
This study analyzed the changes in the operational productivity of fourteen Korean container lines from 2019 to 2021 using MP I(Malmquist Productivity Index). The results indicated that the operational productivity of the shipping companies has increased by 38.4% annually, representing the TCI (Technical Change Index) increasing by 58.3% and the TECI (Technical Efficiency Change Index) decreasing by 12.6%. The increase in the operational productivity of the container shipping lines was mainly attributed to the high rise in ocean freight rates rather than an increase in fleet size or ship technical efficiency. However, the deep-sea shipping lines (i.e. HMM and SM lines) experienced increases in both the TCI and TECI, which was not the case for other shipping lines(i.e. Intra-Asian short-sea shipping lines). The intra-Asian short-sea shipping lines enhance their productivity due to the TCI but failed to appreciate the cost savings of the increased fleet effects due to the low SECI(Scale Efficiency Change Index) values.
The purpose of this paper is to analyze the productivity of the costal fisheries in Jeonnam Province. In this study, the operational characteristics and Cobb-Douglas production function of coastal fisheries were examined based on a research on the actual condition of costal fisheries (RACF). The statistical analysis of RACF data reveals that Cobb-Douglas production function consists of the three variables: fishing quantity per ton-age, the number of fisherman per ton-age and fishing equipment cost per ton-age. The results of this study show us that the relation and productivity between labor and capital of the operational equipment in the coastal fisheries. If extensive comparable biological and market data become available, analysis model can be widely applied to yield more accurate results.
Kim, Chang-Wan;Eh, Youn-Yang;Lee, Jin-Soo;Song, Dong-Hyo
The Journal of Fisheries Business Administration
/
v.53
no.1
/
pp.1-16
/
2022
This paper aims to propose a new systematic approach to analyze the factor productivity and to investigate those characteristics of factor productivity in operational and managerial perspectives. The Cobb-Douglas production function is adopted to estimate the labor and capital productivity. In estimating those productivities the data of The Research on the Actual Condition of Coastal Fisheries (RACF), especially those of Jeon-Nam Province are used. The statistical analysis of RACF data shows that the characteristics are a little bit different between labor and capital of the operational equipment in the coastal fisheries. The Cobb-Douglas type production function is useful in estimating the factor productivity, especially in case of 'coastal Stow-net fishery' even though the limited data is used. However, in case of 'trap fishery,' the Cobb-Douglas production function appears to have some limitations in estimation. This implies that estimating the factor productivities in fisheries employing broad perspectives and various methods are needed.
International conference on construction engineering and project management
/
2015.10a
/
pp.639-640
/
2015
Traditional construction planning based on historical data and heuristic adjustment can no longer incorporate all the operational details and guarantee the expected performance. The variation between the expected and the actual production leads to cost overruns or delay. Although predicting reliable productivity on construction site is getting more important, the difficulty of this increases. In this regard, this paper suggested to develop BIM-integrated simulation framework. This framework could predict productivity dynamics by considering factors affecting on construction productivity at operational phase. We developed the following processes; 1) enabling a BIM model to produce input data for simulation; 2) developing the construction operation simulation; 3) running simulation using BIM data and obtaining productivity results. The BIM-integrated simulation framework was tested with structural steel erection model because steel erection work is one of the most critical process influencing on the whole construction budget and duration. We could improve to predict more dynamic productivity from this framework, and this reliable productivity helps construction managers to optimize resource allocation, increase schedule reliability, save storage cost, and reduce material loss.
The productivity and cost of clear cutting operations were examined to broaden our knowledge on the harvesting system in a Larix leptolepis stand of Korea. The harvesting system was divided into tree operations which were chainsaw (STIHL MS440) felling, tower yarder (Koller301-4) yarding and harvester (WOODY H50) processing. The average cycle time of felling, yarding and processing were 98 s/cycle, 245 s/cycle and 150 s/cycle. The total stump-to-pile operational productivity was 43.07 $m^3/hr$. The highest production activity was the felling 17.93 $m^3/hr$, followed by the productivity of processing 15.62 $m^3/hr$ and then by the productivity of yarding 9.52 $m^3/hr$. In addition the total stump-to-pile operational cost was 24,086 $won/m^3$. The highest cost activity was the yarding 14,557 $won/m^3$ (60.4% of the total cost), followed by the costs of processing 8,461 $won/m^3$ (35.2%) and then by the costs of felling 1,068 $won/m^3$.
While Korean construction companies are adapting themselves to rapidly changing business landscape at home and abroad, intensifying competition among competitors in local as well as global market deteriorates the profitability of construction industry, which leads to another problem. In response to such challenges, many construction companies continue to innovate their business portfolio and organization structure, with strong commitment to business process innovation. Furthermore, they need to analyze the productivity of project site management manpower overhauling business processes systematically and develop effective alternative strategies. This research aims to analyze the productivity of project site management manpower. Current operational practices of construction site organizations have been analyzed with focus on large construction companies in Korea and data gathered from project sites have been analyzed from a wide range of perspectives, In so doing, this research is expected to provide basic inputs for any subsequent attempt to estimate proper resource requirement for site management tasks in construction projects and analyze the management productivity of such resources by enabling construction companies to better understand the current operational status of site organization.
This study was carried out to investigate the operational time and productivity of logging operation by chain saw, yarder attached on tractor, tower-yarder, mini-truck, mini-forwarder, and chipping operations by mini-chipper, large-chipper in order to develop the efficient logging operation system for utilization of forest-biomass. As a result, the average felling and bucking time using chain saw at the site 1 and 2 was observed to be 182.7 sec/cycle and 518.5 sec/cycle respectively. The average yarding time was 202.5 sec/cycle using yarder attached on tractor and 295.1 sec/cycle using tower-yarder. The average forwarding time was 2,073 sec/cycle using mini-truck and 2,248.4 sec/cycle using mini-forwarder. The operational time of felling and bucking using chain-saw can be delayed according to the direction of fallen trees. The selection of felling direction is very important to yarding operation because the direction between width-yarding and felling are interrelated. Productivity can be improved through educating and training operators in the yarding operations. Mini-forwarder is needed to use because of higher productivity and lower cost than mini-truck. The operational productivity of felling and bucking by chain saw was $66.96m^3/man{\cdot}day$ and $43.86m^3/man{\cdot}day$ at site 1 and 2 respectively. The yarding productivity was $5.68m^3/man{\cdot}day$ by yarder attached on tractor, $10.74m^3/man{\cdot}day$ by tower-yarder. The forwarding productivity was $21.29m^3/man{\cdot}day$ by mini-truck, $28.57m^3/man{\cdot}day$ by mini-forwarder. The chipping productivity was $4.42m^3/man{\cdot}day$ by mini-chipper, $21.87m^3/man{\cdot}day$ by large-chipper.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.