The load on the power grid of South Korea is expected to grow continuously until the late 2020s, and it is necessary to increase the transfer capacity from the Eastern grid to the Seoul-Gyeonggi region by reinforcing the transmission network for the electric power system to remain stable. To this end, the grid reinforcement by two bipole LCC HVDC transmission systems have been considered on account of the public acceptability and high growth of the fault current level, even though an additional 765kV system construction is more economical. Since the probability of the existing 765kV double circuit transmission line trip is extremely low, a dynamic simulation study was carried out to estimate the efficient HVDC capacity able to stabilize the transient stability by utilizing the HVDC overload capability. This paper suggests the application plan to reduce the HVDC construction capacity with ensuring the transient stability during the 765kV line trip.
Kim, Donghwan;Jung, Kyosun;Lim, Kyungbae;Choi, Jaeho
Journal of Power Electronics
/
v.16
no.1
/
pp.38-47
/
2016
This paper presents DG based droop controlled parallel inverter systems with virtual impedance considering the unequal resistive-inductive combined line impedance condition. This causes a reactive power sharing error and dynamic performance degradation. Each of these drawbacks can be solved by adding the feedforward term of each line impedance voltage drop or injecting the virtual inductor. However, if the line impedances are high enough because of the long distance between the DG and the PCC or if the capacity of the system is large so that the output current is very large, this leads to a high virtual inductor voltage drop which causes reductions of the output voltage and power. Therefore, the line impedance voltage drops and the virtual inductor and resistor voltage drop compensation methods have been considered to solve these problems. The proposed method has been verified in comparison with the conventional droop method through PSIM simulation and low-scale experimental results.
The display market has been replaced by the FPD (Flat Panel Display) from the CRT (Cathode-Ray Tube) since the late 1990s. In the FPD production line, the most equipment has high price. Thus, when the equipment has multi-function, the repetitive process is arranged for the equipment. However, such disposition of equipment results in more complicated process flow owing to repetitive operations. This reduces the production capacity and increases lead-time in turn. In this paper, we develop an AutoMod simulation system that derives to information about the quantity, production lead-time, utilities of facilities, and occupation rates of racks. In this simulation system, we consider the situation where the equipment might be broken and suspended randomly. For the developed system, we first evaluate a production plan with current layout and then, propose a revised alternative plan. Using the same simulation scheme, we investigate comparing the production quantity and lead-time with the two plans. In addition, for a proposed alternative, we try to forecast the most adequate rule between the two job dispatching rules which are FOR (Fewest Operation Remaining) and FCFS (First Come First Serve) through simulation.
Journal of the Korean Institute of Telematics and Electronics S
/
v.34S
no.5
/
pp.94-103
/
1997
It is necesary that analog buffer circuit should drive an external load in the VLSI design such as switched capacitor efilter (SCF), D/A converter, A/d converter, telecommunicatin circuit, etc. The conventional CMOS buffer circuit have many probvlems according as CMOS technique. Firstly, Capacity of large load ar enot able to opeate well. The problem can be solve to use class AB stages. But large load are operated a difficult, because an element of existing CMOS has a quadratic functional relation with inptu and outut voltage versus output current. Secondly, whole circuit of dynamic rang edecrease, because a range of inpt and output voltages go down according as increasing of intergration rate drop supply voltage. In this paper suggests that new differential CMOS line driver make out of operating an external of large load. In telecommunication's chip case transmission line could be a load. It is necessary that a load operate line driver. The proposal circuit is planned to hav ea high generation power rnage of voltage with preservin linearity. And circuit of capability is inspected through simulation program (HSPICE).
Journal of Korean Society of Industrial and Systems Engineering
/
v.37
no.2
/
pp.1-8
/
2014
The automobile manufacture is a typical integrated assembly production that the numerous parts are committed sequentially to the assembly line. In this type of automobile manufacture, WBS (white body storage) and PBS (paint body storage) are operated to adjust the production sequence and to buffer. Starvation (impossibility of production owing to the insufficient supply) or blocking (impossibility of production owing to the over capacity) could occur in some chance, hence, both storages (WBS, PBS) are integrated as a prevention. This system is called integrated storage. In this paper, we suggest the simulation model of 'WBS-PBS integrated storage' and methodology of operation considering both 'Color grouping' and 'Option leveling.'
When operating Express and Standard trains, which run with two different scheduled time, in a single line with limited number of side tracks for overtaking standard trains, it is required to have various modeling methodologies and simulations in order to calculate an optimum headway to maximize the capacity of the line with the best scheduled time. Especially it is inevitable that following trains have to slow down or stop in the middle of their operations due to the preceding trains, in case it is inappropriate controlled about either in which station an overtaking should be taken or how long it should be. This study is to analyze TPS data which have been produced with a simulation program which the team has invented to optimize Express and Standard mixed traffic plan and to introduce an algorism which shows detected conflict data, calculates appropriate dwell time after getting overtaken and helps to decide stations for overtaking.
Journal of the Korean Society of Clothing and Textiles
/
v.25
no.1
/
pp.103-114
/
2001
In Korean clothing industry, most of the womens wear is manufactured by subcontractors. Because womens fashion is getting more rapidly changing, subcontractors production run of each orders is getting shorter too. Also the volume of each order is quite small compare to mens or childrens. So subcontractors are always in a hurry to adjust their production capacity to new order. Therefore they cannot afford to plan production line and allocate works efficiently enough to manufacture competitive products in terms of cost, lead time, as well as quality. The purpose of this study is to suggest a production planning model for womens apparel manufacture, which are relevant to the situation of Korean clothing industry.
Liu, Weiwei;Wang, Fu;Zhang, Chennan;Zhang, Jingyu;Wang, Lei
KSII Transactions on Internet and Information Systems (TIIS)
/
v.15
no.4
/
pp.1216-1231
/
2021
With the increase in the population of our cities and the rapid increase in the number of private cars, urban traffic has become more and more congested. At this stage, urban public transportation has become one of the main ways to improve urban traffic congestion. Aiming at the problem of how to improve the basic capacity of buses in multi-line transfer stations, this paper conducts simulation research based on anylogic software. Through micro-simulation analysis of vehicles entering, stopping, and exiting the station, combined with the delay model theory, the vehicle is given Stop organization optimization and station layout improvement methods, so that vehicles can run in the station more stably, smoothly and safely. Case analysis shows that applying this method to the roadside parking problem, the main and auxiliary bus stations have a significant improvement in operating capacity compared with the conventional tandem double bus stations, and the service level of the main and auxiliary bus stations has been significantly improved.
This paper suggests the method that forecast Dynamic Line Rating (DLR). Thermal Overload Risk (TOR) of next time is forecasted based on current weather condition and DLR value by Monte Carlo Simulation (MCS). To model weather element of transmission line for MCS, we will propose the use of weather forecast system and statistical models that time series law is applied. Also, through case study, forecasted TOR probability confirmed can utilize by standard that decide DLR of next time. In short, proposed method may be used usefully to keep safety of transmission line and reliability of supply of electric Power by forecasting transmission capacity of next time.
Journal of the Korea Academia-Industrial cooperation Society
/
v.16
no.7
/
pp.4918-4924
/
2015
In this paper, we consider the capacity improvement of systems exploiting dual-polarized antennas for two-user transmission. To this end, we analyze the upper bounds of ergodic capacities for multicast and unicast data services in the systems, and propose the condition for adjusting the complex cross-polarization discriminations (XPDs) to maximize the ergodic capacities. In addition, we present the adjustment condition of the complex XPDs that can achieve spectral efficiencies close to the maximum ergodic capacities with lower system complexity. Lastly simulation results demonstrate that the systems using the proposed conditions can obtain higher spectral efficiencies than the ones employing different adjustment conditions including the exiting adjustment condition.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.