1 |
Choi, W.J., Park, H.K., and Shin, H.O., Automation of the real-time production sequencing system of an automobile Assembly Line. Journal of the korea institute of industrial Engineers, 1996, Vol. 9, No. 1, p 47-59.
|
2 |
Han, Y.H., Modeling and Simulations Analysis of the setup reduction method in automobile painting process. Journal of The Korea Society for Simulation, 2009, Vol. 18, No. 3, p 147-154.
|
3 |
Inman, R.R., ASRS sizing for recreation automotive assembly sequences. International Journal of Production Research, 2003, Vol. 5, p 847-863.
|
4 |
Kim, Y.M. and Seo Y.H., Model Grouping a Mixedmodel Assembly Line. Journal of the korea institute of industrial Engineers, 1996, Vol. 9, No. 2, p 39-45.
|
5 |
Na, Y.K., Lee, D.H., and Oh, G.T., A Solution Procedure for Minimizing AS/RS Construction Costs under Throughput Rate Requirement Constrain. Journal of the Society of Korea Industrial and Systems Engineering, 2002, Vol. 25, No. 4, p 40-45.
|
6 |
Monden, Y., 3rd ed., Industrial Engineering and Management Press, USA, 1998.
|
7 |
Moon, D.H., Kim, H.S., Song, C., and Kim, K.W., A simulation Analysis on the Validity of Color Rescheduling Storage in an automobile Painting Shop. IE Interface, 2003, Vol. 16, No. 2, p 211-221.
|
8 |
Moon, D.H., Song, C.H., and Ha, J.H., A Simulation study on the installation designated Lane for CRS and PBS in an Automative Factory. The Korea Society for Simulation '04 conference in Kangwon Univ, 2004, Vol. 5, p 77-82.
|
9 |
Moon, D.H., Song, C., and Ha, J.H., A Simulation Study on the operations of the painted body storage in an Automobile Factory. IE Interface, 2005, Vol. 18, No. 2, p 136-147.
|
10 |
Ok, C., Kim, D.S., Gong, J.S., and Seo, Y.H., Study on integrated storage systems for automobile production. Journal of The Korea Society for Simulation, 2012, Vol. 21, No. 2, p 91-101.
|
11 |
Atassi, F.R., Implementation of Block Painting In Ford's In-Line Vehicle Sequencing Environment. MS Thesis, System Design and Management Program, MIT, 1996.
|
12 |
Choi, W.J., Park, H.K., and Shin, H.O., A Real-Time Sequence Control System for the Level Production of the Automobile Assembly Line. Computers and Industrial Engineering, 1997, Vol. 33, p 769-772.
DOI
|