A study on R&D project evaluation system for enhanching work effectiveness (업무효율 향상을 위한 연구개발사업 평가관리시스템 구현)

  • Ryu, Jee-woong;Song, Jong-chul;Moon, Byung-joo;Jung, Hoe-kyung
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2012.10a
    • /
    • pp.515-517
    • /
    • 2012
  • The importance of R&D project to enhance the national competitiveness continuously increase. So, it is the most important point that is evaluating the outcome and the utilizability of the project. And we need the system that can manage the evaluation of the project. In this paper, I want to discuss about the way of process management that is the evaluation of the R&D project using a system.

  • PDF

Analyzing Characteristics of Construction Complaints with Construction Project Type

  • Lee, Ju-Hui;Lee, Changjun;Yun, Sungmin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.3
    • /
    • pp.52-61
    • /
    • 2023
  • Conflicts in a construction project not only make negative impacts on project performance such as schedule delay or cost overrun but also require social cost to resolve the conflicts. Although the conflict needs a preemptive management because a conflict usually begins with a complaint, existing studies have focused on conflict resolution after it occurs. This study identifies and categorizes complaints which mainly appear in the construction projects. Those complaints were evaluated and quantified in terms of occurrence frequency and potential to conflict through a questionnaire survey with industry experts. Using the survey results, this study examines the characteristic of complaints in linear project and clustered project, and analyzes what kind of complaints occur by project type. As the results, this study derives the complaints with high potential to the conflicts that should be managed first during managing a construction project in each project type.

An Analytical Appraisal of Building Information Modelling (BIM) Guidelines to Identify Variations in the Procedures

  • Das, Dakshata;Moon, Sungkon
    • Journal of KIBIM
    • /
    • v.6 no.3
    • /
    • pp.1-14
    • /
    • 2016
  • The usage of Building Information Modelling (BIM) in building projects has enabled improvement in project planning, implementation and collaboration process amongst various stakeholders within architecture, engineering and construction (AEC) industry. However, variations exist in the current practices of BIM implementation and coordination process in the industry. These variations result in inconsistent degree of BIM use across the construction industry. This inconsistency gives rise to several managerial and technological challenges such as data interoperability issues and purposeful integration and exchange of information within the BIM components. In order to tackle the issue, it is essential to analyse the different BIM approaches employed by the industry practitioners. BIM guidelines serve as a critical link between the BIM model, and its subsequent execution. They therefore provide the best reflection of BIM application and processes. This research paper aims to address the variations existing in BIM practices across the construction industry. It includes an extensive study of 21 existing, publicly available BIM-based guidelines in order to establish an understanding of the present state of practice and deduce issues and concerns related to them. All guidelines analysed in this paper are first categorised based on authorship and the release date for efficient comparison. The points of similarity and difference between them are thereby realized and outlined. In addition, the transition of project implementation process from traditional methods to BIM technology is also explained. The existence of inconsistencies in the BIM guidelines reviewed in this paper reflects the need of a BIM 'Code Compliance Check'. The Code Compliance Check will serve as a regulatory project guideline that will further improve the potential of BIM by incorporating a consistent BIM modelling methodology for the entire construction industry.

Risk Management Software Utilization in the Singapore Construction Industry: Evaluation and Improvement

  • Hwang, Bon-Gang;Chua, Pee Mee
    • Journal of Construction Engineering and Project Management
    • /
    • v.1 no.2
    • /
    • pp.28-36
    • /
    • 2011
  • Risk management is popularly and widely used in various industries to handle uncertainty that can negatively affect their businesses. While in the current Information-Technology oriented age, software packages are designed to assist in carrying out risk management processes, the construction industry does not seem to have software that is tuned to its specific characteristics and processes. Therefore, this study first explores the types of software that are commonly used for risk management in the Singapore construction industry. Also, using one-sample t-test, it is tested if the software programs used in the construction industry have effectively catered the needs of the users. For the analysis, a survey questionnaire was developed and the representatives from 34 companies participated in the survey. Furthermore, this study also makes use of the current risk management framework defined in ISO31000 to design a risk management software algorithm that can suit the needs for the Singapore construction industry. The results from this study will contribute to identifying strategic areas, in terms of use of risk management software, on which the industry needs to focus, ultimately enhancing their performance of risk management.

Strategies Contents for Financial Independent RIS in Proton Accelerator Science and Technology

  • Bae, Khee-Su
    • International Journal of Contents
    • /
    • v.7 no.2
    • /
    • pp.32-35
    • /
    • 2011
  • This research would be the first step toward in the long processes of proton technology industrial cluster development by focusing on the region's readiness and acceptability of the proton technology project. As is shown in our questionnaire survey, the top priorities needed to consider for the Proton Technology project are found to be job creation (mean 3.74), regional economic development (mean 3.72), industry infrastructure(3.54), institution for science and education(3.53), economic inequalities(3.33), tourism industry revitalization(3.20). For public servants top priorities in order found to be regional economic development, job creation, industry infrastructure, institution for science and education, economic inequalities, tourism industry revitalization. Universities' priorities in order found to be job creation, regional economic development, institution for science and education, industry infrastructure, economic inequalities, tourism industry revitalization. The mean reliability score for the each party was found to be mayor((3.04), citizens(2.99), province(2.97), private corporation(2.96), and universities((2.93). Of particular note, the mean score except the mayor were all below median (3.00). province(3.24), city council member(3.20), public employees (3.09), private corporation(3.03), nonprofit organization (2.97), mass media (2.96), citizens(2.96), and universities(2.89). The universities and colleges also should revise their strategic plans and thus restructure their internal academic programs, and must develop their own collaborative programs with Proton Engineering Frontier Project, related industries, city, and other government units. Not only educating, training, and providing top-notched man powers to the proton technology industries will be one of their primary missions.

Investigating Main Causes for Schedule Delay in Construction Projects in Bangladesh

  • Rahman, MD. Mizanur;Lee, Young Dai;Ha, Duy Khanh
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.3
    • /
    • pp.33-46
    • /
    • 2014
  • Delay is the most common problem in the construction industry. It has many negative effects on project's success in terms of time, cost, quality, and safety. From the literature review, a total of thirty-five factors of delay were selected. These factors were divided into seven groups related to materials, manpower, owner, consultant, contractor, construction, and external problems. This study was carried out to identify the main causes of delay for a construction project through their importance level. The importance level was determined based on the frequency of occurrence and severity of impact. The structured questionnaire has distributed to the respondents who have much experience in construction management in Bangladesh. The results of analysis indicated that top five factors of construction delay according to their level of importance are: (1) price of construction materials increased very rapidly, (2) political situation (revolution/ public strikes), (3) shortages of skilled workers, (4) poor site management and supervision by contractor, (5) incompetent/ immature subcontractors. These findings of this study are expected to be significant contributions to Bangladesh construction industry in controlling current performance of project on time overrun.

Development of a methodology for analysing and quantifying the impact of delay factors affecting construction projects

  • Shebob, Abdulhamid;Dawood, Nashwan;Shah, Raj K.
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.3
    • /
    • pp.17-29
    • /
    • 2012
  • Delays are one of the biggest problems facing by the construction industry and they have significant financial and social impact in construction projects. The paper presents a framework of Delay Analysis System (DAS) with the aim of analysing the impact of delay factors in Libyan construction projects. The system has designed by integrating the possible delay factors, critical activities of a project using@risk simulator. A case study of building project was demonstrated to identify the impact of delays and the sensitivity of delay factor. The case study result showed that the project might be delayed by 97 to 103 days in comparison to the planned duration. The developed DAS is a tool for analysing and identify the impacts of delay factors and assist to construction manager to take necessary measure in reducing the delay impact. The paper provides a methodology for analysing the possible delay impact in a construction project and informing to construction manager in advance of the possible delay factors.

Role of Capital Expenditure in the Economic Evaluation of National R&D Investment Project for Cooperative Research of University-industry-research Institute: Cases of Woodchip Power Plant Construction (국가 R&D 산학연협동연구 투자계획안의 경제성 평가에서 자본적 지출의 역할: 목재칩을 이용한 발전소 건설의 경우를 중심으로)

  • YEO, Heejung
    • Journal of Korea Technology Innovation Society
    • /
    • v.18 no.4
    • /
    • pp.621-640
    • /
    • 2015
  • The aim of this study is to provide evidence of how a change in the process of calculating the economic valuation of a project can affect the decision regarding national R&D investment. The paper examines a R&D project of cooperative research program of university-industry-research institute for the construction of a woodchip power plant to explore the role of capital expenditure in the economic evaluation of an investment project. The paper finds that the simple introduction of capital expenditure in the profitability analysis affects the perspectives on the construction plan. The results of this study indicate that standardization of the calculation process that takes different characteristics of industries into account is needed in the preliminary feasibility study of national R&D projects.

Project Cost Management in Construction Industry in Ho Chi Minh City

  • Kim, Soo-Yong;Tuan, Kiet Nguyen;Luu, Van Truong;Le, Tam Thuong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.70-71
    • /
    • 2015
  • Cost management always being the matters for project manager as well as other entities involved the construction projects. Vietnam is emerging country, many construction works were carried out and lot of construction projects will be developed in the near future with a huge investment capital come from outside and inside Vietnam. In recent years, international project management firms enter the Vietnam construction market, some issues emerged need to be solved. In which cost and schedule of the construction project was put in a thoroughly consider of not only project management team but also stakeholders. The research attempts to identify and assess the relationship of factors affecting the construction cost in construction phase in Ho Chi Minh City, Vietnam. Five main factor groups Owners/clients; Consultants; Contractors; Resource and Other were identified to propose the solution for cost management.

  • PDF

Impacts of Contract types on Construction Project Performance - Cost Reimbursable and Lump Sum - (계약방식에 따른 건설프로젝트 성과의 비교분석 연구 - 실비정산방식과 총액계약방식을 중심으로 -)

  • Lee, Yoo-Seob;Hwang, Bon-Gang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.155-163
    • /
    • 2007
  • Multiple parties-owners, engineering and construction contractors, and suppliers involve the delivery process of capital facility projects in the construction industry, and each party obtains or provides their workforce, material, equipment, or service tied into specific contracts. Considering that construction projects are based on the contracted relationship between the parties and that contract types are one of the significant factors determining project success. it is critical for project stakeholder to select appropriate contract types for successful deliveries of projects. With these considerations, this paper assesses impacts of different contract types on project cost, schedule, safety, change, or rework. Analyzing data from real construction projects, the differences in project performance between two contract types, Cost Reimbursable and Lump Sum are measured and statistically tested to investigate if the differences are significant. For this analysis, performance metrics developed by Benchmarking and Metrics program, the Construction Industry Institute are used.