• 제목/요약/키워드: design-build project

검색결과 221건 처리시간 0.025초

OPTION DESIGN STRATEGIES FOR INFRASTRUCTURE PROJECTS

  • Charles Y. J. Cheah;Jicai Liu
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.980-985
    • /
    • 2005
  • Since the 1980s, Build-Operate-Transfer and its variations have become a common approach to develop large-scale infrastructure projects. Despite the slight variations in contractual settings, the key issue for all parties concerned is to assess the risks and uncertainties inherent in a project. The risk factors studied and highlighted by past researchers are very diverse. This paper starts with an objective to compare the risk factors in different sectors of infrastructure, and then categorize them into two kinds: general and specific. Following this classification, risk mitigation strategies should be adopted differently at the corporate and project levels. A few short cases have also been used to illustrate the flexible measures or "options" that some project participants have designed to address risks and uncertainties at the two levels.

  • PDF

가치중심의 SI (System Integration) 사업 규모 및 비용산정 모형 구축 연구 (A Value-oriented System Integration Project Sizing and Cost Estimation Model)

  • 김현수
    • Asia pacific journal of information systems
    • /
    • 제8권3호
    • /
    • pp.101-118
    • /
    • 1998
  • The purpose of this study is to construct a value-oriented sizing and cost estimation model for system integration projects. In particular, this study is to build a system architecture design and integration cost model, and a network design and implementation cost model. Unlike software development projects, system integration projects include knowledge-intensive professional services on system architecture and network design areas. Because of these work's high invisibility, the cost of these services is hard to estimate and measure. Therefore, we need to develop value-oriented cost models. This study presents 6 value-oriented cost models, and tests statistical significance of these models with real system integration project data. The results show that cost factors on these models are valid, and models are statistically significant. Future work is needed to integrate various cost models and apply the whole model to field projects to increase model's prediction accuracy.

  • PDF

교과교실제 중등학교 홈베이스와 미디어스페이스의 사업단계별 공간구성 변화 (Changes of Spatial Composition by Project Phase of Homebase and Media-space on Variation Type Middle and High Schools)

  • 박임호;정진주
    • 교육시설 논문지
    • /
    • 제21권2호
    • /
    • pp.13-24
    • /
    • 2014
  • This study compared and analyzed middle and high school's homebase and media space which are installed along with the introduction of subject classroom system operation method, with regard to the position of arrangement, the type of arrangement, and the change of area, etc. which were changed and applied per the phase of project. For this, design competitions were implemented since 2006 targeting the cases which participated in design directly-indirectly in the researcher's architectural firm, present construction documents among the selected BTL(Build-Transfer-Lease) were completed, and the examples of 10 schools(design competitions 2 schools, BTL selected plans 8 schools) were analyzed, which were operating variation type.

신규제품 아키텍처 개발을 위한 기업조직의 설계 -PDA 개발에 있어 샤프와 카시오의 개발조직 비교 분석-

  • 위정현
    • 기술경영경제학회:학술대회논문집
    • /
    • 기술경영경제학회 2005년도 27회 하계학술발표회 논문집
    • /
    • pp.44-68
    • /
    • 2005
  • The purpose of this paper is to analyze the organizational design and management of product development in creating new product architecture by an established firm. For the purpose, the paper put up the organizational design in the process of PDA(Personal Digital Assistant) development of Sharp and Casio which were Japanese major PDA firms in 1990s. PDA is the product born through architectural change from Electronic Organizer. Prior research on the product architecture change and organizational adaptation emphasized that an established firm is difficult to adapt to new product architecture due to the restriction of prior technology or organizational inertia. For overcoming these problems and successful development of new product architecture, organizational design and management in the process of product development becomes essential. In case of Sharp, corporate development project team had been used to overcome the restrictions from architectural knowledge accumulated through previous product. After launching first new PDA by corporate development project team, Sharp created a new division and pushed an evolution of PDA, when new PDA market start to grow up rapidly toward a major market segmentation. As a result, Sharp was able to build up stable PDA project trajectory. However, Casio was late for three years in launching of new PDA architecture because previous division charging of Electronic Organizer tried to develop first new PDA. Casio's PDA development was prohibited by engineers of previous division because new PDA architecture was inferior on user interface and display definition. That is, Casio's first PDA development was restricted by architectural knowledge of previous product.

  • PDF

CBR(Case-Based Reasoning)을 활용한 턴키 공사 실시설계관리 방안 (Working Design Management of the Design Build Projects Using CBR)

  • 박세근;김영재;김경래;신동우
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.432-437
    • /
    • 2002
  • 턴키 공사의 실시설계 단계는 기본설계 이후 최종 계약을 위한 준비 단계로써, 수행하여야 할 업무가 많을 뿐만 아니라, 그러한 업무의 결과가 실제 계약서류에 대한 근거가 되므로 턴키 사업 수행자 입장에서는 철저한 관리가 필요한 단계이다. 그러나 국내 건설회사의 경우, 최근까지 단순히 시공 주체로써의 능력만을 키워왔으며 턴키 사업에 대한 경험이 미비하여, 실시설계 단계의 프로세스와 기존사례가 체계화되어 있지 않아 현장관리자가 해당 프로세스에서 업무를 수행하는 데 어려움이 있었다. 이를 해결하기 위해, 먼저 턴키 사업의 이론적 고찰을 통하여 연구의 근거와 필요성을 제시하고, 현장관리자 면담을 통해 실시설계 단계에서 수행하여야 할 업무와 그에 따르는 제반사항에 대해 파악한 후, 실제 발생하였던 의사결정 사항들과 그에 대한 대처방안 및 예방방안에 대해 조사하였다. 그리고 면담조사 결과를 바탕으로 턴키 공사의 실시설계 단계 프로세스 모델과 CBR(Case-Based Reasoning)을 활용한 실시설계관리 방안을 제시하였다.

  • PDF

Design Structure Matrix: A Model Proposal and Implementation on Harbor and Building Design Project

  • Akram, Salman;Kim, Jeonghwan;Pi, Seungwoo;Seo, Jongwon
    • 한국건설관리학회논문집
    • /
    • 제14권1호
    • /
    • pp.144-152
    • /
    • 2013
  • Design is an iterative, generative, and multidisciplinary process by its nature. Iteration occurs often in most of the engineering design and development projects including construction. Design iterations cause rework, and extra efforts are required to get the optimal sequence and to manage the projects. Contrary to simple design, isolation of the generative iterations in complex design systems is very difficult, but reduction in overall iterations is possible. Design depends upon the information flow within domain and also among various design disciplines and organizations. Therefore, it is suggested that managers should be aware about the crucial iterations causing rework and optimal sequence as well. In this way, managers can handle design parameters related to such iterations pro-actively. There are a number of techniques to reduce iterations for various kinds of engineering designs. In this paper, parameter based Design Structure Matrix (DSM) is chosen. To create this DSM, a survey was performed and then partitioned using a model. This paper provides an easy approach to those companies involved in or intend to be involved in "design and build projects".

Gyeonggi Provincial Free Uniform Support Project on the Usability through the Cooperation of 'Good School Uniform'

  • Park, Hye-Sook
    • International Journal of Advanced Culture Technology
    • /
    • 제9권3호
    • /
    • pp.68-73
    • /
    • 2021
  • The 'Good School Uniform' development project was conducted in consultation with Gyeonggi-do and the Gyeonggi Provincial Office of Education. The aim is to find various ways to supply school uniforms reflecting the latest trends at low prices using high-quality textile materials produced in Gyeonggi-do. From 2015, when the 'Good School Uniform' development project started, to the present, various events and fairs are making great progress. However, there are several problems in actually wearing each middle and high school student. In order to satisfy the characteristics of each school and the satisfaction of parents and students together, it is necessary to not only conduct practical research such as closer customer satisfaction surveys, industry-academia-research networks, expert interviews, and surveys, but also several supplements such as consultations between practitioners. There are many domestic studies on the development of school uniform design, but the research on the revitalization plan according to the free school uniform support is very insufficient. Moreover, it is not easy to find recent studies on the development of 'Good School Uniforms'. This study intends to study how to build a system so that the Gyeonggi-do 'Good School Uniform' development project can be used as a role model. In addition, it is expected that this study will be used as basic data for building a nationwide system such as public brand development and collaboration with small domestic companies.

공공 건설공사 발주방식에 따른 비용성과 비교연구 (Comparison of Cost Performance for Delivery Methods on Public Construction Projects)

  • 이유섭;강태경;신은영;박원영
    • 대한토목학회논문집
    • /
    • 제33권6호
    • /
    • pp.2575-2582
    • /
    • 2013
  • 공공건설공사 발주제도 운영에 있어 기술경쟁을 지향하는 턴키 및 대안방식 등 설계 시공일괄방식의 경우, 시설물의 품질향상 및 건설기술 발전에 기여하였음에도 불구, 계약되는 공사비가 설계 시공 분리발주방식을 적용하는 공사보다 높아 예산낭비 우려가 있다는 지적과 함께 수주독점, 입찰담합, 심의비리 등의 문제가 쟁점이 되고 있다. 그러나 실제 발주방식별 사업성과와 효과에 대해 정밀 비교분석한 사례가 없는 실정이며, 단순히 낙찰률 등 사업의 한정된 일반적 정보만으로 사업효과를 논의하고 판단하는 것은 자칫 오류를 범할 우려가 있다. 이에 공공 건설공사를 대상으로 계약에서 준공에 이르기까지 실제 집행한 공사비 자료를 광범위하게 조사하여 비용의 투입구조 및 변동추세 등 발주방식별 특성을 비교분석하고 공공건설공사 발주제도의 올바른 이해와 효율적 운영을 도모하고자 한다.

IPD 계약은 IPD 프로젝트의 필수조건인가 - 국내외 사례조사를 통하여 - (Effect of Multyparty Contract in IPD Project Case study of USA and Korean Projects)

  • 유승은;김태완;유정호
    • 한국건설관리학회논문집
    • /
    • 제18권1호
    • /
    • pp.3-16
    • /
    • 2017
  • Integrated Project Delivery는 기존 발주방식 (설계시공일괄 발주방식, 설계시공분리 발주방식, 건설사업관리 발주방식)의 대안으로 제시되고 있다. 다수의 국외 IPD 관련 연구들은 IPD의 계약적 측면뿐만 아니라 IPD의 업무수행방식 측면에서도 IPD 연구에 접근하고 있다. 그러나 대부분의 국내 IPD 관련 연구들은 IPD의 계약적 특성에만 초점을 맞추고 이것이 심각한 문제인 것으로 간주하고 있는데, 현재 국내 규제와 법적 한계로 인해 다자간 계약이 불가능하므로 이런 국내 건설환경에서는 IPD가 도입되기 어렵다는 주장이다. 하지만 본 연구는 국내 시스템이 변화하길 기다리는 대신 IPD가 업무수행방식 측면에서 도입될 수 있음을 보여주고자 한다. 따라서 이 연구의 목표는 IPD 계약이 체결되지 않은 프로젝트들의 성과와 IPD 계약이 체결된 프로젝트의 성과를 비교함으로써 IPD 계약적 특성이 IPD를 적용한 프로젝트에서 필수조건이 아님을 보이는 것이다. 본 연구는 미국 5개 IPD 사례와 국내 1개 프로젝트의 참여자들로부터 설문데이터를 확보하여 사례조사를 두 단계로 수행하였다. 첫째로 IPD 계약을 체결하지 않은 미국 4개 사례의 IPD 특징요소 적용여부와 그에 따른 성과를 비교하고, 둘째로 IPD 계약을 체결한 미국 사례와 IPD 특징요소를 프로젝트에 도입한 국내 사례에 대해서 첫 번째 단계와 같은 내용을 비교하였다. 연구의 결과로 IPD 특성의 자유롭고 유연한 도입을 통해 국내 건설의 생산성 도모와 협업환경 조성을 통한 건설 환경의 개선 및 발주자와의 신뢰관계 구축에 도움을 줄 것으로 기대한다.

현장여건상이로 인한 클레임의 예방에 관한 연구 -공공부문의 설계$\cdot$시공일괄공사를 중심으로- (A Study on the Prevention for Differing Site Conditions Claims - Focused on Design-Build Project in Public Sector -)

  • 정명우;이화영;서용칠;현창택
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.46-53
    • /
    • 2001
  • 정부의 지속적인 사회간접시설의 건설로 많은 대형공공공사가 발주되고 있으며, 이에 따라 많은 건설 클레임이 발생되고 있으며, 그 .중에서도 현장여건상이 클레임은 발생가능성이 높은 부분이다. 특히 현장여건상이 클레임은 여타 클레임과 달리 공사 초기에 발생하여 여타의 클레임보다 큰 손실을 초래할 수 있으므로 이에 대한 예방방안의 필요성이 증대되고 있다. 본 연구는 국내의 대형공공공사 중 일괄공사계약으로 발주된 공사에서 발생한 현장여건상이 클레임의 원인을 분석하고, 향후 이러한 클레임을 예방할 수 있는 예방방안을 제시하였다. 본 연구에서 제시하고 있는 예방방안으로는 첫째 수급자의 입찰관행 개선, 둘째 수급자의 현장조사 책임한계 정립, 셋째 발주자의 면책조항 재검토 그리고 마지막으로 계약금액 조정의 유연성을 확보하기 위한 방안 등을 제시하고 있다. 또한 상기의 예방방안에 대한 단·장기적 대안도 제시했다. 이러한 예방방안들은 발주자와 수급자 사이에서 현장여건상이 클레임의 해결에 사용될 수 있을 것으로 판단된다.

  • PDF