• Title/Summary/Keyword: contractor's management system

Search Result 59, Processing Time 0.029 seconds

Recognition of Occupational Safety and Health Management of Contractor Company (모기업 협력업체 산업안전보건관리에 대한 인식)

  • Rhee, Kyung-Yong;Yi, Kwan-Hyung;Oh, Ji-Young;Suh, Nam-Kyu;Son, Doo-Ik;Gal, Won-Mo;Shin, Moon-Jin
    • Journal of the Korean Society of Safety
    • /
    • v.18 no.4
    • /
    • pp.136-142
    • /
    • 2003
  • This study is planned to investigate the attitude toward the safety and health management of contractor company. Under the contract based production system, all of activities including safety and health management in the contractor company are depended upon the contract. How to make contract influence the worker's health of contractor company. Worker's health of contractor company can be protected by efforts of company of contract-out and contractor company, especially their safety managers. The modelling of the effective safety and health management system for contractor company should consider the need of safety manager of each company and employer of contractor company. Data is collected from safety managers of 3 contract out compaines as electronic and electrical manufacturing industry and 55 safety manager, 57 employers of their contractor compaines using self administered survey with structured questionnaire. The most of all respondents want to support from the contract out compaines. The most important items supported from contract out company is the information based on the safety information network between each company. Safety manager and employer of contactor company also itemized safety education and training in the supporting system from contract out company. These results can be generalized to survey on the other industries.

MITIGATION AND REMISSION OF CONTRACTOR'S DEFECTS LIABILITY IN KOREAN CONSTRUCTION CONTRACTS

  • Jong-Gwang Lee ;Yong-Su Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.447-451
    • /
    • 2005
  • The purpose of this study is to improve regulations such as law and standard contract forms related to defects liability in Korea. Defects liability has been one of the major causes of construction contract disputes in Korea in recent years. It is important to avoid or resolve disputes regarding defects liability through regulations containing clear criteria and to specify the standard regarding the mitigation and remission of the contractor's defects liability. This study was carried out through document research and analysis of judicial precedents. The following are the courses of improvement regarding the mitigation and remission of defects liability in Korea. First, laws and standard contract forms must contain more detailed clauses regarding exemption of a contractor's defects liability, which clearly set out the scope of the defects liability of the contractor. Second, the current system for defects liability favors the owner rather than the contractor - it is necessary to change the defects liability system in order to give the owner and the contractor an equal standing. Third, strict liability is taken on by the contractor even when the term of guarantee for defects lasts longer than the legally set period of liability for defects. Hence, it is necessary to improve the system by alleviating the liability of the contractor through applying negligence liability as opposed to strict liability during the term of guarantee.

  • PDF

CRITICAL DRIVING FORCE FOR CONTRACTOR'S OPPORTUNISTIC BIDDING BEHAVIOR IN PUBLIC WORKS

  • Min-Ren Yan ;Wei Lo ;Chien-Liang Lin
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.417-423
    • /
    • 2005
  • Contractor's opportunistic bidding behavior refers to contractor's deliberate low-bid, which cannot accord with the cost, and expectation for beyond-contractual reward (BCR), the compensation earned through cutting corners or claims after undertaking the construction project. This research applies System Dynamics to develop a model of contractor's pricing with consideration for dimensions of "cost", "market competition", and "BCR". Iterative computer simulations were performed to analyze the effects of contractor's pricing on the market price. The results were then examined by statistical analysis on data collected from 44 highway projects in Taiwan. It is found that the critical force driving the contractors to bid opportunistically is their excessive expectations in BCR under the current environment. Within the price competition mechanism, if the problem of BCR exists, even if the bidding system is further improved, contractors would still prefer opportunistic bidding behavior, and eventually make the whole construction industry operate ineffectively. Therefore, it is crucial to remedy the aforementioned BCR problem by more effective management policy.

  • PDF

A Mechanism to Derive Optimal Contractor-type & Action Comginations of a Single-source Procurement Contract

  • 정승호
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.24 no.2
    • /
    • pp.41-51
    • /
    • 1999
  • In sole-source procurement contraction for government goods and services, the buyer (government) needs to derive the optimal actions from the contractor so the buyer can obtain the maximum utility and the contractor, or single-source supplier, is guaranteed the equivalent of a minimum level of profit. Under the assumption of risk-neutrality for both the buyer and the contractor and the buyer's unobservability of the contractor's action, it is necessary for the buyer to design a (mathematical) model to achieve the above objective. This paper considers the mathematical formulation in which two problems - moral hazard and adverse selection - are present simultaneously; furthermore, from the formulation, a GAMS (General Algebraic Modeling System) program is used for a possible buyer to obtain the optimal actions.

  • PDF

Development of Awarding System for Construction Contractors in Gaza Strip Using Artificial Neural Network (ANN)

  • El-Sawalhi, Nabil;Hajar, Yousef Abu
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.3
    • /
    • pp.1-7
    • /
    • 2016
  • The purpose of this paper is to develop a model for selecting the best contractor in the Gaza Strip using the Artificial Neural Network (ANN). The contractor's selection methods and criteria were identified using a field survey. Fifty four engineers were asked to fill a questionnaire that covers factors related to the selection criteria of contractors practiced in Gaza Strip. The results shows that the dominant part of respondents (91%) confirmed that the current awarding method "the lowest bid price" is considered one of the major problems of the construction sector, "award the bid to the highest weight after combination of the technical and financial scores" represented 50% of the respondents. The criteria weights were determined based on Relative Importance Index (RII. Ninety-one tenders(13 projects) were used to train and test the ANN model after re-evaluating the contractors depend on the weights of factors to select the best contractor who achieves the highest score. Neurosolution software was used to train the models. The results of the trained models indicated that neural network reasonably succeeded in selection the best contractor with 95.96% accuracy. The performed sensitivity analysis showed that the profitability and capital of company are the most influential parameters in selection contractors. This model gives chance to the owner to be more accurate in selecting the most appropriate contractor.

An Enhanced Operating Scheme of Evaluation System for Construction Works -Focused on the KNHC System (시공평가제도의 효과적 운영방안 -대한주택공사 제도를 중심으로)

  • Choi Jin-Woo;Jung Sang-Bong;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.279-284
    • /
    • 2001
  • The owner's evaluation system about the contractor's work performance is used to give the contractor some advantages or disadvantages. According to the result of evaluation of the contractor's performance in the given construction project, the owner identify the good contractors and give them some merits in the future project bidding. However, the system used in the Korean construction industry has caused many problems and has been operated improperly. As a case study, this paper investigates the current problems existed in the KNHC (Korean National Housing Corporation) evaluation system and suggests some directions for its efficient operation. In doing so, the study performed interviews with the KNHC officers and the related contractors, using a structured questionnaire

  • PDF

Identification of foodservice operation evaluation model′s criteria items for certifying contract foodservice management company (위탁급식전문업체 인증제도 도입을 위한 급식운영 평가 모형 기준항목 선정)

  • 양일선;박문경;차진아;이경태;박상용
    • Korean journal of food and cookery science
    • /
    • v.20 no.3
    • /
    • pp.247-255
    • /
    • 2004
  • The foodservice industry is changing more and more from on-site foodservice management to contract foodservice management. However there are differences according to the level of management and operation of contract foodservice management company (CFMC). The necessity of certification on CFMC is increasing to enable fair discrimination of CFMC among most clients that want to contract with CFMC. This study was performed to identify the foodservice operation evaluation model's criteria items for certifying CFMC. The analysis research methods included literature review, content analysis, individual interview, Delphi technique, and brain storming. First, the following infrastructure items were prepared in the contractor's viewpoint: procurement, transparency of operation, menu development and operation system, nutrition service system, professional employee education, sanitation andsafety management system, customer satisfaction system, facility system, management information system (MIS), business and economics. Second, the evaluation criteria required by the contractor on the client's view point was similar to school foodservice, hospitalfoodservice, and business andindustry foodservice except extraordinary items of field. Third, evaluation criteria and detail categories and items were identified such as financial focus, customer focus, process focus, human focus, and renewal and development by grafting on intellectual capital evaluation methodology for CFMC.

A Study on the Development of Evaluation System on the Construction Project Manager's Safety Capability (건설사업관리자의 안전역량 평가체계 개발에 대한 연구)

  • Shin, Dong Hyuk;Seong, Joo Hyun;Yook, In Soo;Lee, Myeong-Gu;Oh, Tae Keun
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.4
    • /
    • pp.40-45
    • /
    • 2017
  • Among various methods to build the construction safety, the consecutive improvement by the measuring and evaluating safety management capabilities for the construction participants such as an owner, a contractor, and a supervisor (construction project manager) can be the effective one. Thus, an effective evaluation and grading criteria to provide performance index for the implementation of safety management activities should be necessary. In this regards, the purpose of this study is to verify the adequacy by offering a competency evaluation system for the supervisor's safety capability and by applying the system to some construction sites. The proposed evaluation system was developed on the basis of the principles of safety management & accident prevention, basic elements of safety and health management system, and safety evaluation cases at home and abroad. The trial evaluation showed that the safety management of the construction site is mainly carried out by the contractor and the supervisor's awareness for the safety management is low on the whole. Especially, it is urgent to improve the support system from the supervisor headquarter and to place the dedicated safety management person in the field.

A Study on the Perception Level of Quality Management System by Construction Subject (건설공사 주체별의 품질관리제도 인식수준에 관한 연구)

  • Kim, Seong-Deok;Cho, A-Yeong;Lee, Jeong-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.253-254
    • /
    • 2023
  • We this study investiged the level of perception such as construction quality-related systems according to the subject of construction work. The results of the recognition moisture survey showed a high response rate in the order of construction companies and supervisors. The result of the system's level of understanding was low at 3.6 points for the orderer and contractor. In addition, in recognition of the effectiveness of the quality management system, the contractor showed a somewhat negative perception than other targets.

  • PDF

BALANCED SCORECARD PERFORMANCE MEASUREMENT AND CONTRACTOR SELECTION USING A WEB-BASED SYSTEM

  • J. Johnson;V. Peansupap;S. Jayasena
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.259-268
    • /
    • 2007
  • In a very competitive construction business environment there is a need to measure and manage business performance across a wider spectrum of business success criteria. The Balanced Scorecard (BSC) and Triple Bottom Line (TBL) reporting concepts are emerging as champions in the race for sustainable business success. The construction business organisations are often judged based on their financial performance as well as wider performance. This paper aims at developing a universally accepted tool for assessing contractors' wider business performance in the construction industry. A prototype of web-based business performance measurement system has been developed to help contractors assess their own performance aimed at uplifting their performance. The consultants/clients can also use the tool to measure contractors' performance in a value-based contractor selection. The system was developed based on the research conducted among 63 senior construction professionals and therefore further research with the participation of a large number of managers across different countries and also an upgrade of the system will be required.

  • PDF