Comparative risk analysis of NATM and TBM for mixed-face large-diameter urban tunneling (도심지 대단면 복합지반 NATM 과 TBM 터널공법의 비교위험도 분석)

  • Kim, Young-Geun;Moon, Joon-Shik;Shim, Jai-Beom;Lee, Seung-Bok;Choi, Chang-Rim;Chun, Youn-Chul
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.1
    • /
    • pp.19-32
    • /
    • 2011
  • The risk assessment is essential for tunnel design in order to minimize risks associated with uncertainty about geological conditions and tunneling method. This paper provides a comparative risk analysis of a large single bore TBM driven tunnel against sequentially excavated NATM tunnel for a mixed-face large-diameter urban tunnel project near or under a river. The focus of this assessment is on the risks associated with the tunnel excavation methods, in particular whether a TBM or NATM presents more or less risk to achieve the planned excavation duration and bring the project within the estimated bid price. First, the impacts and risks to tunnel construction under each method were discussed, and the risks were scored and ranked in the order of perceived severity and likelihood. Finally, the assessment from a risk based perspective was conducted to decide which alternate tunneling method is more likely to deliver the project with the least time and cost. It is very important to note that this study is only applied to this tunnel project with specific geological conditions and other contract requirements.

Effect of Multyparty Contract in IPD Project Case study of USA and Korean Projects (IPD 계약은 IPD 프로젝트의 필수조건인가 - 국내외 사례조사를 통하여 -)

  • Yoo, Seungeun;Kim, Taewan;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.1
    • /
    • pp.3-16
    • /
    • 2017
  • Integrated project delivery (IPD) is suggested as an alternative to traditional delivery methods such as design-build (DB), design-bid-build (DBB), and construction management at risk (CMR). Many foreign research studies have approached IPD not only in the contractual aspect but also the work implementation method aspect. However, most research projects in Korea have focused on the contractual aspect of IPD for asserting that the characteristics are the critical matter. The Korean institutional and legal system does not permit the multi-party agreement; therefore, it is difficult to adopt IPD in Korea's construction industry. The researchers do not wait the system to be changed, but we do identify the possibility of adopting IPD in Korea in the perspective of work implementation method, except the contractual characteristics. Thus, the goal of this research is to identify one project that does not include IPD agreement but utilizes other IPD characteristics whose contractual results have similar performance to those that utilize all characteristics of IPD including agreement. This research is expected to enhance performance of the construction project in a Korean construction environment by embracing IPD characteristics as overcoming limits and bounds of the traditional delivery method.

Major Risk Factors to Implement CM at Risk Pilot Project on the Public Sector (시공책임형 CM 발주방식 공공부문 시범사업 사례를 통한 리스크 도출)

  • Han, Jonghoon;Kim, Kyungtae;Ahn, Yonghan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.3
    • /
    • pp.61-69
    • /
    • 2018
  • The buildings are getting enormous and more complex as well as the requirement of the owner which wants diverse and efficient. Moreover advanced management is necessary for construction services and a new method of delivering project is now required. In order to expand the delivering method and the construction industry, we have to introduced the CM at Risk method. However, despite the fact that six years have passed already the CM at Risk regulation was introduced, the contract amount in significantly lower than that of the CM for fee, and also there is no CM at Risk project in the public sector. As a result, three pilot projects are currently underway for the LH(Korea Land & Housing Corporation) in order to set up a CM at Risk for the public sector. However, detailed regulations related to CM at Risk have not yet been implemented in Korea. Therefore, in this study, I am trying to understand the risks that could incur when practitioners participate in the three pilot projects that are currently underway and employed in the public sector wherein the CM at Risk is normally introduced. Based on the results of this study, It will be able to utilize as a basic data for future CM at Risk delivery system improvement and enactment.

A Rating Method for the Estimation of the Additional Overhead Expenses incurred by Schedule Extension in Public Construction Projects (공공건설공사의 공기연장에 따른 추가간접비 산출을 위한 요율방식 제안)

  • Lee, Seung-Joon;Cha, Yongwoon;Han, Sangwon;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.3
    • /
    • pp.79-90
    • /
    • 2021
  • In domestic public construction, disputes are increasing due to differences among stakeholders regarding contract price adjustment. In particular, the actual cost-plus fee for overhead costs due to the schedule extension cannot be agreed upon at the administrative phase, and most of them seek judicial judgment. Thus, this study aims to propose a 'sufficiently satisfactory' alternative to reach an agreement before disputes in order to minimize disputes related to the calculation of additional overhead costs. To this end, this study proposes three alternatives based on the rate method. Firstly, when calculating additional overhead costs, it is not calculated as an actual cost-plus-fee method, but as a rate compared to direct labor costs among net direct costs. Secondly, the calculated indirect labor costs are compensated for up to the legal maximum of legal limit costs such as general management costs, profits and so on. Thirdly, it reflects overhead costs increased or decreased due to change orders. Risks were analyzed by collecting expert opinions on the proposed methods and applying actual cases. Finally, as a result of investigating the level of consensus for each stakeholder, it was confirmed that all stakeholders could agree regardless of the size of the company. The result of this study is expected to as a useful tool among stakeholders in the construction fields that can be able to easily agreed upon.

User-independent blockchain donation system

  • Sang-Dong Sul;Su-Jeong Lee
    • Journal of the Korea Society of Computer and Information
    • /
    • v.28 no.11
    • /
    • pp.113-123
    • /
    • 2023
  • This paper introduces the Cherry system, a user-independent blockchain donation system. This is a procedure that is delivered to the beneficiary's bank account through a virtual account when a donor makes a donation, so there is no difference from the existing donation delivery method from the user's point of view However, within the blockchain, Cherry Points, a virtual currency based on the user ID, are issued and delivered to the beneficiary, while all transactions and the beneficiary's usage history are managed on the blockchain. By adopting this method, there was an improvement in blockchain performance, with transaction processing exceeding 1,000 TPS in typical transaction condition and service completion within 21.3 seconds. By applying the automatic influence control algorithm to this system, the influence according to stake, which is an individual donation, is greatly reduced to 0.3 after 2 months, thereby concentrating influence could be controlled automatically. In addition, it was designed to enable micro tracking by adding a tracking function by timestamp to the donation ledger for each individual ID, which greatly improved the transparency in the use of donations. From a service perspective, existing blockchain donation systems were handled as limited donation delivery methods. Since it is a direct service in a user-independent method, convenience has been greatly improved by delivering donations in various forms.

The Current Status of the Warsaw Convention and Subsequent Protocols in Leading Asian Countries (아시아 주요국가(主要國家)들에 있어서의 바르샤바 체제(體制)의 적용실태(適用實態)와 전망(展望))

  • Lee, Tae-Hee
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.1
    • /
    • pp.147-162
    • /
    • 1989
  • The current status of the application and interpretation of the Warsaw Convention and its subsequent Protocols in Asian countries is in its fredgling stages compared to the developed countries of Europe and North America, and there is thus little published information about the various Asian governments' treatment and courts' views of the Warsaw System. Due to that limitation, the accent of this paper will be on Korea and Japan. As one will be aware, the so-called 'Warsaw System' is made up of the Warsaw Convention of 1929, the Hague Protocol of 1955, the Guadalajara Convention of 1961, the Guatemala City Protocol of 1971 and the Montreal Additional Protocols Nos. 1,2,3 and 4 of 1975. Among these instruments, most of the countries in Asia are parties to both the Warsaw Convention and the Hague Protocol. However, the Republic of Korea and Mongolia are parties only to the Hague Protocol, while Burma, Indonesia and Sri Lanka are parties only to the Warsaw Convention. Thailand and Taiwan are not parties only to the convention or protocol. Among Asian states, Indonesia, the Phillipines and Pakistan are also parties to the Guadalajara Convention, but no country in Asia has signed the Guatemala City Protocol of 1971 or the Montreal Additional Protocols, which Protocols have not yet been put into force. The People's Republic of China has declared that the Warsaw Convention shall apply to the entire Chinese territory, including Taiwan. 'The application of the Warsaw Convention to one-way air carriage between a state which is a party only to the Warsaw Convention and a state which is a party only to the Hague Protocol' is of particular importance in Korea as it is a signatory only to the Hague Protocol, but it is involved in a great deal of air transportation to and from the united states, which in turn is a party only to the Warsaw Convention. The opinion of the Supreme Court of Korea appears to be, that parties to the Warsaw Convention were intended to be parties to the Hague Protocol, whether they actually signed it or not. The effect of this decision is that in Korea the United States and Korea will be considered by the courts to be in a treaty relationship, though neither State is a signatory to the same instrument as the other State. The first wrongful death claim in Korea related to international carriage by air under the Convention was made in Hyun-Mo Bang, et al v. Korean Air Lines Co., Ltd. case. In this case, the plaintiffs claimed for damages based upon breach of contract as well as upon tort under the Korean Civil Code. The issue in the case was whether the time limitation provisions of the Convention should be applicable to a claim based in tort as well as to a claim based in contract. The Appellate Court ruled on 29 August 1983 that 'however founded' in Article 24(1) of the Convention should be construed to mean that the Convention should be applicable to the claim regardless of whether the cause of action was based in tort or breach of contract, and that the plaintiffs' rights to damages had therefore extinguished because of the time limitation as set forth in Article 29(1) of the Convention. The difficult and often debated question of what exactly is meant by the words 'such default equivalent to wilful misconduct' in Article 25(1) of the Warsaw Convention, has also been litigated. The Supreme Court of Japan dealt with this issue in the Suzuki Shinjuten Co. v. Northwest Airlines Inc. case. The Supreme Court upheld the Appellate Court's ruling, and decided that 'such default equivalent to wilful misconduct' under Article 25(1) of the Convention was within the meaning of 'gross negligence' under the Japanese Commercial Code. The issue of the convention of the 'franc' into national currencies as provided in Article 22 of the Warsaw Convention as amended by the Hague Protocol has been raised in a court case in Korea, which is now before the District Court of Seoul. In this case, the plaintiff argues that the gold franc equivalent must be converted in Korean Won in accordance with the free market price of gold in Korea, as Korea has not enacted any law, order or regulation prescribing the proper method of calculating the equivalent in its national currency. while it is unclear if the court will accept this position, the last official price of gold of the United States as in the famous Franklin Mint case, Special Drawing Right(SDR) or the current French franc, Korean Air Lines has argued in favor of the last official price of gold of the United States by which the air lines converted such francs into us Dollars in their General Conditions of Carriage. It is my understanding that in India, an appellate court adopted the free market price valuation. There is a report as well saying that if a lawsuit concerning this issue were brought in Pakistan, the free market cost of gold would be applied there too. Speaking specifically about the future of the Warsaw System in Asia though I have been informed that Thailand is actively considering acceding to the Warsaw Convention, the attitudes of most Asian countries' governments towards the Warsaw System are still wnot ell known. There is little evidence that Asian countries are moving to deal concretely with the conversion of the franc into their own local currencies. So too it cannot be said that they are on the move to adhere to the Montreal Additional Protocols Nos. 3 & 4 which attempt to basically solve many of the current problems with the Warsaw System, by adopting the SDR as the unit of currency, by establishing the carrier's absolute liability and an unbreakable limit and by increasing the carrier's passenger limit of liability to SDR 100,000, as well as permiting the domestic introduction of supplemental compensation. To summarize my own sentiments regarding the future, I would say that given the fact that Asian air lines are now world leaders both in overall size and rate of growth, and the fact that both Asian individuals and governments are becoming more and more reliant on the global civil aviation networks as their economies become ever stronger, I am hopeful that Asian nations will henceforth play a bigger role in ensuring the orderly and hasty development of a workable unified system of rules governing international commercial air carriage.

  • PDF

Developing the Ecological Performance Standard for Replaced Wetlands by Analyzing Reference Wetlands (표준습지 분석을 통한 대체습지의 생태 성능 기준 개발)

  • Koo, Bon-Hak;Jeong, Jin-Yong;Park, Mi-Ok
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.14 no.1
    • /
    • pp.11-22
    • /
    • 2011
  • This study was established to build and suggest the Ecological Performance Standards for replaced wetlands as the mitigation strategies for the construction projects. The request performance and assessment factors and standards were derived by bibliographic review and verified by the field survey for the reference wetlands. And the weights for each factor were derived by AHP(Analytical Hierarchy Process) method. The results are as follows : 1) Assessment factors were induced by in-depth research of many wetland assessment models and benchmarks evaluated ecological functions. This study proposed final 12 assessment factors through ecological specialist and experts interviews added with literature analysis. 2) 10 natural wetlands were selected as Reference Wetlands as the measure to propose assessment factors and assessment criteria. Those reference wetlands are well-conserved inland natural wetlands classified to the one having worthy to conserve (grade "high") according to RAM(Rapid Assessment Method). Reference wetlands chosen by the study are Parksilji, Jeongyangji, Mulkubi, Bawineupkubi, Jilnalneup, Jinchonneup, Doomoso, Haepyung wetland, Whangjeong wetland, and Whapo wetland. The research developed assessment criteria for the performance assessment factors based on several explorations of the reference wetlands. 3) "Requiring performance" of replaced wetlands is defined as "to carry out similar or same ecological functions provided by natural wetlands", in overall. The detailed requiring performances are as follows; ${\bullet}$ to play a role of wildlife habitats ${\bullet}$ to have biological diversity ${\bullet}$ to connect with other ecosystems ${\bullet}$ to provide water environment to perform good ecological functions 4) The assessment factors for required performance are categorized by wildlife habitat function, biological diversity, connectivity of adjacent ecosystem, and water environment. Wildlife habitat category is consisted of wildlife habitat creation, size of replacement wetland, and site suitability. Biological diversity category contains the number of plant species, the number of wildlife species, and number of protected species as the sub-factors. Connectivity of adjacent ecosystem is comprised of wildlife corridor, green network and distance from other ecosystem. Finally, water environment make up with water quality, depth of water body, and shape of waterfront. 5) Finally, every assessment factors were verified and weighted by the AHP methods and the final standards were proposed. The weights of factors of requiring performance suggested as habitat (0.280), connectivity (0.261), diversity (0.260), hydraulic environment (0.199). And those of detailed sub-factors are site suitability (0.118), protected species (0.096), distance to neighbor ecosystem (0.093), habitat creating (0.091), green corridor (0.090) etc.

A Proposal for Mobile Gallery Auction Method Using NFC-based FIDO and 2 Factor Technology and Permission-type Distributed Director Block-chain (NFC 기반 FIDO(Fast IDentity Online) 및 2 Factor 기술과 허가형 분산원장 블록체인을 이용한 모바일 갤러리 경매 방안 제안)

  • Noh, Sun-Kuk
    • Journal of Internet Computing and Services
    • /
    • v.20 no.6
    • /
    • pp.129-135
    • /
    • 2019
  • Recently, studies have been conducted to improve the m-commerce process in the NFC-based mobile environment and the increase of the number of smart phones built in NFC. Since authentication is important in mobile electronic payment, FIDO(Fast IDentity Online) and 2 Factor electronic payment system are applied. In addition, block-chains using distributed raw materials have emerged as a representative technology of the fourth industry. In this study, for the mobile gallery auction of the traders using NFC embedded terminal (smartphone) in a small gallery auction in which an unspecified minority participates, password-based authentication and biometric authentication technology (fingerprint) were applied to record transaction details and ownership transfer of the auction participants in electronic payment. And, for the cost reduction and data integrity related to gallery auction, the private distributed director block chain was constructed and used. In addition, domestic and foreign cases applying block chain in the auction field were investigated and compared. In the future, the study will also study the implementation of block chain networks and smart contract and the integration of block chain and artificial intelligence to apply the proposed method.

An Empirical Study on the Importance of Sales Agency in Apartment Sale by AHP and Fuzzy Analysis (AHP 및 Fuzzy 분석을 통한 분양대행사의 분양성 결정요인 중요도 분석)

  • Park, Hyung Nam;Eum, Soo Won
    • Journal of Digital Contents Society
    • /
    • v.19 no.7
    • /
    • pp.1365-1372
    • /
    • 2018
  • The purpose of this study is to analyze the importance of the determinants of housing sales agency's role in the sale of apartment housing. For this purpose, a hierarchical decision model was constructed to understand the role and importance of the sales agency. The analytical variable items structured by the research model were set up through literature review, precedent research, and expert brainstorming. The questionnaire consisted of two comparisons for AHP analysis and the importance of absolute importance for fuzzy analysis. Afterwards, the work of correcting the importance was carried out. As a result of the analysis, it was found that the contractor prioritized the sale conditions and the sales agency had priority over the planning for the sale. As a result of analysis, planning of customer pre-sale counseling data, planning of client subscription and contract maximization plan, planning method of advertisement public media method were found to be the most important factors. The results of measurement of absolute importance(fuzzy) & relative importance(,AHP) showed similar tendency. Therefore, it can be seen that the timing of the model house operation is an important period in which the subscription rate depends on the role of the sales agency and the marketing strategy.

Design Development Management in the Design-Build Project by Cast-Study (사례 분석을 통한 턴키 프로젝트 실시설계 업무 관리방안)

  • Lee Hwang-Ku;Kim Young-Jae;Kim Kyung-Rai;Park Chan-Sik;Shin Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.128-136
    • /
    • 2003
  • The contractors which execute the design-build project have difficulties in design management and contract administration in the pre-construction phase because they have managed construction projects focused on only construction phase so far. Moreover, they have to manage the design development stage without any contingency following-up various design revisions from the design reviews of outside experts. Therefore, the design management in the design development stage is a critical success facto. of the design-build project. The objective of this study is to structure the problems in the management skill for design development phase in the domestic design-build projects and to suggest a design development management method to settle the problems. To achieve these objectives, this study 1) analyzes the prior studies about the design-build procurement methods, 2) designs and performs a case study to embody the problems of the domestic design-build projects, and 3) proposes a method of design development management by analyzing the results of case study and interviewing experts.