Design Development Management in the Design-Build Project by Cast-Study  

Lee Hwang-Ku (아주대학교 건축학부)
Kim Young-Jae (아주대학교 건축학부)
Kim Kyung-Rai (아주대학교 건축학부)
Park Chan-Sik (중앙대학교 건축학과)
Shin Dong-Woo (아주대학교 건축학부)
Publication Information
Korean Journal of Construction Engineering and Management / v.4, no.3, 2003 , pp. 128-136 More about this Journal
Abstract
The contractors which execute the design-build project have difficulties in design management and contract administration in the pre-construction phase because they have managed construction projects focused on only construction phase so far. Moreover, they have to manage the design development stage without any contingency following-up various design revisions from the design reviews of outside experts. Therefore, the design management in the design development stage is a critical success facto. of the design-build project. The objective of this study is to structure the problems in the management skill for design development phase in the domestic design-build projects and to suggest a design development management method to settle the problems. To achieve these objectives, this study 1) analyzes the prior studies about the design-build procurement methods, 2) designs and performs a case study to embody the problems of the domestic design-build projects, and 3) proposes a method of design development management by analyzing the results of case study and interviewing experts.
Keywords
Design-Build Project; Design Development Management; Case Study;
Citations & Related Records
연도 인용수 순위
  • Reference
1 김종훈, 서봉환, I-프로젝트의 건설사업관리 적용사례, 제 2회 한국건설관리학회 학술발표대회 논문집, 2001
2 박세근 외 3인, CBR을 활용한 턴키공사 실시설계 관리방안, 대한건축학회 논문집 19권 7호, 2003.7
3 Fredrickson, Ken, Design Guidelines for Design Build Projects, Journal of Management in Engineering, Vol.14, ASCE, 1998
4 김경래 외2인, 일괄입찰공사 활성화를 위한 입찰절차 개선에 관한 연구, 대한건축학회 논문집, 1999.1
5 이상호, 턴키 설계심의제도 개선, 걸설저널 2002. 8
6 Fridlander, M.C., Design- Build Solutions, Journal of Management in Engineering, Vol.14, ASCE,1998
7 이복남 외 1인, 턴커발주방식의 동향과 평가, 건설산업 동향 제 37호, 1998
8 정준영 외 1인, 턴키 사업 추진단계 관리업무의 체계화를 위한 문제점 및 장애요인 분석에 관한 연구, 대한건축학회 논문집 17권 9호, 2001.9
9 건설교통부, 턴키. 대안 입찰제도 업무요령, 2000.3
10 신은경 외 2인, 설계업무 프로세스 모델 구축에 관한 연구, 대한건축학회 논문집 15권 7호, 1999.7
11 Songer et al, Process Model for Public Sector Design-Build Planning, Journal of Construction Engineering and Management, Vol.120, ASCE, 1994
12 장선호, 국내 공공부문 설계. 시공 일괄계약제도의 개선방안, 중앙대 석사학위논문, 1998