Comparative risk analysis of NATM and TBM for mixed-face large-diameter urban tunneling |
Kim, Young-Geun
(Underground Engineering Division, Samsung C&T Corp.)
Moon, Joon-Shik (Underground Engineering Division, Samsung C&T Corp.) Shim, Jai-Beom (Samsung C&T Corp.) Lee, Seung-Bok (Underground Engineering Division, Samsung C&T Corp.) Choi, Chang-Rim (Geotechnical Division, Sambo Engineering Co. Ltd.) Chun, Youn-Chul (Civil Engineering Business Division, Samsung C&T Corp.) |
1 | Samsung C&T (2010a), OOO Road Expansion Project - Geotechnical Investigation Report. |
2 | Samsung C&T (2010b), OOO Road Expansion Project - Tunnel Design Report. |
3 | Tarkoy, P.J. (1996), "Comparing TBMs with drill and blast excavation", Int'1 J. of Rock Mech. and Mining Sci. and Geomech. Abst., Vol. 33, No. 4, pp. 186A-186A(1). |
4 | URS Corporation (2005), OOO Tunnel Project - Qualitative Risk Assessment Report. |
5 | Kim, Y., Hencher, S.R., Yoon, Y., Cho, S. (2002), "Determination of the construction method for Young Dong Tunnel by risk assessment", Tunneling Technology, Vol. 4, No. 1, pp. 13-25. |
6 | Barla, G., Pelizza, S. (2000), TBM Tunnelling in Difficult Ground Conditions. |
7 | Barton, N. (2000), TBM Tunneling in Jointed and Faulted Rock, Taylor & Francis, p. 184. |
8 | Holen, H., Anlegg, S. (1998), TBM vs drill & blast tunnelling, Norwegian TBM Society, pp. 95-98. |
9 | Huang, R. (2008), The Shanghai Yangtse River Tunnel: Theory, Design, and Construction, p. 360. |
10 | Parsons Brinckerhoff, Inc. (2010), Tunnel Options Risk Assessment for OOO Road Expansion Project. |