• Title/Summary/Keyword: construction-cost-calculation

Search Result 238, Processing Time 0.027 seconds

A Study on Automatic Calculation of Earth-volume Using 3D Model of B-Rep Solid Structure (B-Rep Solid 구조의 3차원 모델을 이용한 토공량 자동 산정에 관한 연구)

  • Kim, Jong Nam;Um, Dae Yong
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.40 no.5
    • /
    • pp.403-412
    • /
    • 2022
  • As the 4th industrial revolution is in full swing and next-generation ICT(Information & Communications Technology) convergence technology is being developed, various smart construction technologies are being rapidly introduced in the construction field to respond to technological changes. In particular, since the earth-volume calculation process for site design accounts for a large part of the design cost at the construction site, related researches are being actively conducted to improve the efficiency of the process and accurately calculate the earth-volume. The purpose of this study is to present a method for quickly constructing the topography of a construction site in 3D and efficiently calculating earth-volume using the results. For this purpose, the construction site was constructed as a 3D realistic model using large-scale aerial photos obtained from UAV(Unmanned Aerial Vehicle). At this time, since the constructed 3D realistic model has a surface model structure in which volume calculation is impossible, the structure was converted into a 3D solid model to enable volume calculation. And we devised a methodology to calculate earth-volume based on CAD(Computer-Aided Design and Drafting) using the converted solid model. Automatically calculating earth-volume from the solid model by applying the method. As a result, It was possible to confirm a relative deviation of 1.52% from the calculated earth-volume from the existing survey results. In addition, as a result of comparative analysis of the process time required for each method, it was confirmed that the time required is reduced of 60%. The technique presented in this study is expected to be utilized as a technology for smart construction management, such as periodic site monitoring throughout the entire construction process, as well as cost reduction for earth-volume calculation.

Analysis of Road Construction Projects' Escalation under Historical Data-Based Estimate System in Jeju (실적공사비가 적용된 제주도 도로공사의 물가변동률 영향 분석)

  • Hong, Jeong-Ho;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.2
    • /
    • pp.667-676
    • /
    • 2014
  • This study has conducted case studies in order to suggest alternatives to the historical data-based estimate system. Price fluctuation calculation methods based on historial cost indexes, standard estimate and construction cost indexes were applied to 9 road construction sites in Jeju for an analysis. As a result, in 5 construction sites (about 56% of 9 sites), the index control rate calculated based upon historical data-based estimate system was higher than that calculated based upon standard estimate and construction cost indexes. Thus the establishment of the requirements for the adjustment of contract price due to price fluctuation delays, which leads to a significant difference in price fluctuation amount. And, in an analysis of construction cost indexes, the indexes for road construction were used for calculating index control rate which ranges from 2.0 to 9.4 percent, indicating the time of construction amount and price fluctuation application has a significant influence on index control rate.

Web-based Daily Report for Data Repository of Standard Cost Data for Modernized Korean Housing (Hanok)

  • Kim, SuJi;Jung, Youngsoo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.595-596
    • /
    • 2015
  • Growing demand for traditional Korean housing, modernized Korean traditional housing (Hanok) was developed as a way of providing Hanok for the public. However, the standard cost data for Hanok has limitations, as it was developed based on single mock-up project actually constructed and verified by another mock-up Hanok. In order to meet these research objectives, daily report composition which is easy-to-use for on-site workers and managers and also easy-to-accumulate standard cost data was developed first. Secondly, access to the system was made easy through a web server. Finally, an automated calculation formula was inserted to allow the last inputted data to be automatically included for adjustment of standard costs. This system was designed from an industry perspective so that any unspecified and nonprofessional users can easily use. For the users, it has an advantage that on-site workers are provided with a daily report system through web server and also they are able to complete such reports through simple input and output without any additional forms.

  • PDF

Development on Reconstruction Cost Model for Decision Making of Bridge Maintenance (교량 유지관리 의사결정 지원을 위한 개축비용 산정모델 개발)

  • Sun, Jong-Wan;Lee, Dong-Yeol;Lee, Min-Jae;Park, Kyung-Hoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.9
    • /
    • pp.533-542
    • /
    • 2016
  • The periodic maintenance of bridges is necessary once they have been constructed and its cost depends on various factors, such as their condition, environmental conditions and so on. To make a decision support system, it is essential to establish a basic reconstruction cost model. In this study, a regression model is suggested for calculating the reconstruction cost for typical cases and influential factors, depending on the type of bridge and its components, by analyzing the basic bridge specifications based on the data of the Bridge Management System (BMS). The details for each case were estimated in consideration of the cost calculation variables. The details for each case were estimated in consideration of the cost calculation variables. The cost model for the new construction of the superstructure, substructure and foundation and the temporary bridge construction and demolition costs were drawn from the regression analysis of the estimation results of typical cases according to the cost calculation variables. The reconstruction costs for different types of bridge were obtained using the cost model and compared with those in the literature. The cost model developed herein is expected to be utilized effectively in maintenance decision making.

Development and Evaluation of High-precision Earth-work Calculating System using Drone Survey (드론을 활용한 고정밀 토공량 산출 시스템 개발 및 평가)

  • Kim, Sewon;Kim, YoungSeok
    • Journal of the Korean Geosynthetics Society
    • /
    • v.18 no.4
    • /
    • pp.87-95
    • /
    • 2019
  • Earth-work calculation is the important data for estimating the optimal construction cost at the construction site. Earth-work calculations require the accurate terrain data and precise soil volume calculations. Drone surveying technology provides accurate topography in a short time and economic advantages. In this paper, a drone surveying technique was used to derive a high precision soil volume calculation system. Field demonstration were performed to verify the accuracy of the volume measurement system. The results of earth-work calculation using drone survey were compared with those of GPS surveying. In addition, the developed earth-work volume calculation algorithm is compared with the existing aerial survey software (Pix4D) to verify the accuracy.

The construction project's risk threshold calculation methodology applying a concept of VaR (VaR개념을 응용한 건설공사 위험허용도 산정방법)

  • Kim Seon-Gyoo;Kim Jae-Jun;Kim Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.65-72
    • /
    • 2001
  • With the recent rising project complexities and competitive environments in the construction projects, a risk management is recognized as more important management tool than the others. However, as most risk management techniques applied to the construction projects are centered around their initial phases and risk analyses, they are not developed into general project management technique such as time management, cost management and quality management, etc., that are usually applied in the process of construction. Thus, this paper proposes a response process to construction project risks based on the risk threshold and its calculation methodology applying a concept of VaR to establish risk management as general management technique in the construction projects.

  • PDF

A Study on the Improvement of Cost Calculation Model of Recycling Treatment Facility for Estimation of Construction Waste Disposal Fee (건설폐기물 처리대가 산정을 위한 중간처리시설의 비용산정 모델 개선에 관한 연구)

  • Chang-Hak, Kim;Jun-Yeong, Lee;Hyo-Jin, Kim
    • Land and Housing Review
    • /
    • v.14 no.1
    • /
    • pp.135-144
    • /
    • 2023
  • LH Corporation uses the construction waste disposal fee standard, of which the model was developed a long time ago. Therefore, this model is problematic because it needs to reflect waste treatment facilities' technological development and environmental conditions. In this study, the estimated manpower and costs required for the process operation of waste treatment facilities were analyzed, followed by the proposed estimation criteria. This improved standard model can be used as a cost calculation standard for the recycling and treatment of construction waste in public institutions. The study also suggests that an increase in waste treatment costs is needed.

Estimation of Construction Equipment Expenses - Bulldozer and Loader - (표준품셈의 기계경비 산정 현실화를 위한 자료 조사.분석 -불도우저와 로우더를 중심으로-)

  • Huh, Young-Ki;Kim, Kyung-A;Ahn, Bang-Ryul;Tae, Yong-Ho;Park, Hee-Sung;Kim, Chang-Wan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.1
    • /
    • pp.155-166
    • /
    • 2008
  • The Equipment Expenses section of the Poom-Saem that is used for Construction Cost Estimation of public sectors in Korea has been rarely revised, and so does not reflect changes of Construction Equipment technology and construction methods, since it was established based on data from Japan and the U.S in the early 1960s. In order to make reasonable estimation of equipment expenses for a bulldozer and a loader, the domestic and overseas documentary records were investigated. Further, 16 construction sites were visited, and 20 Construction Equipment leasing services were surveyed. The optimum level of each item which consists of equipment costs was revealed based on the result of the analysis on the figures of equipment costs calculation from the Poom-Saem and the collected data. The research will be the foundation for applying the rapid development of Construction Equipment and technology to the appropriate cost estimations and the ground work of related studies.

Study on Improvement of Cost Calculation Method in Construction less than One Day Workload (1일 작업량 미만 공사의 공사비 산정 방식의 개선방안에 관한 연구)

  • Shin, Dae-Woong;Lee, Young-Do;Shin, Yoonseok;Kim, Gwang-Hee;Yoo, Sangrok;Park, Wonjun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.5
    • /
    • pp.477-485
    • /
    • 2014
  • Standard production unit system and historical cost data are the most typical data base for calculating budget price in construction. However, these construction cost estimation methods are difficult to calculate proper construction cost because definition, additional allowance or modification criteria is not clear in construction within one day. Therefore, this study identifies problems for standard production unit system and historical cost data and suggests the improvements for them. For the objectives, this study analyzes frequency after implementing survey for 44 specialty contractors in placing at kyeonggi-province. As the results of the study, labor costs in standard production unit system and equipment costs in historical cost data and in construction of pavement and maintenance by project type was exceeded at most high rate against construction cost estimation methods. Based on this result, standard production unit system and historical cost data need to be modified by three improvements such as classification by project scale. These will be baseline data for improvement of construction cost estimation methods for less than one day workload.

Improvement of BoQ Documents for the BIM based Quantity Takeoff (BIM기반 물량 및 내역정보 생성을 위한 내역서 개선방안)

  • An, Ji-Won;Yun, Seok-heon
    • Journal of KIBIM
    • /
    • v.7 no.2
    • /
    • pp.16-24
    • /
    • 2017
  • It is very important to estimate accurate construction total cost needed early in the project. In the initial phase of the design, the project cost estimates are determined by total quantity from design documents and the variables that affect the calculation of the total cost of the project. In order to determine accurate total construction cost, the contractor has to produce detailed quantity information based on the drawings and specifications. The process of preparing quantification and cost estimation documents is still being worked out manually, and a lot of errors have been occurred in many cases. Recent advances in information technology have led to the BIM based quantity takeoff and cost estimation. However, there are some limits to the extent to which the current specifications for BoQ documents are computed from BIM model. This research analyze the current BoQ cases and analyze how to make quantity takeoff possible through BIM. The study defined five levels of quantity category that could be produced by BIM. Only about 40% or indirectly usable items can be used when information is extracted to BIM modelling. This is very insufficient to fill out the BoQ. The BoQ document structure quantity takeoff specifications should be simplified in order to BIM based cost estimation more efficiently.