Abstract
The Equipment Expenses section of the Poom-Saem that is used for Construction Cost Estimation of public sectors in Korea has been rarely revised, and so does not reflect changes of Construction Equipment technology and construction methods, since it was established based on data from Japan and the U.S in the early 1960s. In order to make reasonable estimation of equipment expenses for a bulldozer and a loader, the domestic and overseas documentary records were investigated. Further, 16 construction sites were visited, and 20 Construction Equipment leasing services were surveyed. The optimum level of each item which consists of equipment costs was revealed based on the result of the analysis on the figures of equipment costs calculation from the Poom-Saem and the collected data. The research will be the foundation for applying the rapid development of Construction Equipment and technology to the appropriate cost estimations and the ground work of related studies.
건설공사 표준품셈 기계경비 부분은 1960년대 초 일본 및 미국의 자료를 근간으로 하여 제정된 이후, 극히 부분적으로만 제 개정되었을 뿐 그 동안의 건설기계와 공법의 발전을 반영하지 못하고 있다. 본 연구에서는 합리적인 기계경비 산출을 위해 불도우저와 로우더를 중심으로 국내 외 문헌조사, 건설현장 16개소 실사, 그리고 건설기계장비 임대업체 20개사를 대상으로 설문조사 및 인터뷰를 실시하였다. 수집한 자료와 현행 표준품셈의 기계경비 산출에 적용되는 수치들을 비교 분석한 결과, 관리비는 금리와 보험료를 고려하여 6종건설기계와 일반기계를 구분하여 현실적인 수치를 제시하였으며; 운전경비는 조수를 삭제하는 것이 현실적인 것으로 나타났다. 또한 주연료 및 잡재료는 현행수준이 적정하지만 장비가격은 상향조정할 필요가 있는 것으로 분석되었다. 논문에서 제시하고 있는 각종 자료 및 수치들은 건설기계와 기술의 급속한 발전을 예정가격산정의 기준에 적용할 수 있는 기초가 될 수 있을 뿐 아니라, 관련 연구의 토대가 될 수 있으리라 기대한다.