• Title/Summary/Keyword: construction standard production unit

Search Result 26, Processing Time 0.026 seconds

Suggestions for Quality Management through Analysis of Construction Process of Multi-layer Modular Housing (적층식 모듈러주택의 시공 프로세스 분석을 통한 품질관리 중점사항 제안)

  • Sohn, Jeong Rak;Lee, Dong Gun;Bang, Jong Dae;Kim, Jin Won
    • Land and Housing Review
    • /
    • v.10 no.3
    • /
    • pp.67-75
    • /
    • 2019
  • The modular construction means that more than 70% of the parts such as walls, windows, electrical wiring, facility piping, bathrooms, and kitchen appliances are pre-assembled at the factory and transported to the site. It is possible to shorten the construction period than general construction work and to secure high quality through modular mass production since the modular construction works in the field at the same time as the modular production. However, there are only four domestic modular manufacturers, and each company's modular components and construction methods are different, so it is necessary to standardize them. Therefore, this study investigated the construction process centering on the stacking method of modular housing construction work applied to D site in Cheonan-si, and proposed the key points of quality management by construction stage. As the project was conducted as a pilot project for government R&D projects, some differences may occur from general modular housing construction. However, the construction process and quality control focus of each unit box type modular house analyzed in this study can be used as basic data in the future of modular housing construction. In addition, the results of this study can be used to establish construction standards, such as the development of checklists and establishment of standard processes.

The Impacts of Reduced Labor Hours on the Construction Period and Cost of Tunnel Project (근로시간 단축에 따른 터널 공사의 표준 공기 및 공사비 영향 분석)

  • Park, Taeil;Kim, Kyunghoon;Shin, Eun-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.37-43
    • /
    • 2019
  • After the new standards for labor hours has been released, various problems come up in construction field, such as income reduction of employees, extension of construction period and increased construction cost. Although it is expected that the impact of the new standard on the construction industry is more worse than other industries form the view of productivity, not much works have been done to identify those impacts. Thus, this research proposes the standard construction processes, excavation cycle, and unit construction period for NATM tunnel project based on 'Construction Standard Production Rates.'The study also investigated the impact of reduced labor hours on the management of work crews, construction periods and costs of tunnel projects. The results showed that under the 52 labor hour standard, the construction periods for the excavation work and whole project was increased by 20% and 8.9%, respectively, but the construction costs for the excavation work and whole project was decreased by 1.4% and 0.6%, respectively.

Comparative Analysis on Unit Price based on Historical Cost Data Estimating for Large and Small-scale Civil Engineering Works (대·소규모 토목공사의 실적공사비 비교 분석)

  • Hong, Sung Ho;Shin, Juyeoul;Kim, Chang Hak;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1707-1718
    • /
    • 2013
  • Historical cost data estimating system has been introduced since 2004 in the construction industry. Based on contract prices of past projects, this estimating system estimates construction cost according to work types. The Korea Institute of Construction Technology (KICT) announces the historical cost data twice a year annually. The unit price of a small construction project is higher than large construction project due to the increase on production cost per work unit, equipment and labor cost, etc. However, the historical cost data estimating system is applied to project estimation uniformly regardless the construction project's size. This study compared and analyzed the historical cost data of large and small construction project to indicate the problem of historical cost date estimating system. The study derived that the unit price of a small construction project is 21.8% higher than that of large construction project.

A Study on Improvement Methods of Cost Estimation in Order for the Proper Management of Street Trees (도시 가로수 관리 품셈 개선에 관한 연구)

  • Do, Yoon-Taek;Han, Bong-Ho;Park, Seok-Cheol
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.50 no.4
    • /
    • pp.20-36
    • /
    • 2022
  • This study aims to provide basic data for high-quality street tree management by setting reasonable management items and appropriate unit prices by reviewing the adequacy of current street tree management. Currently, street tree management items, except for street tree pruning, use general landscape tree quantity per unit for the street tree management quantity per unit. KEPCO (Korea Electric Power Corporation) applied pruning items from standard electric production infrastructure and carried out the activities at an average unit price of 51% lower for heavy pruning and 39% lower for light pruning than the standard estimate. This was judged to be a level that could not maintain or increase the quality of street tree management. It was determined that an appropriate standard unit price for street tree management was necessary. To improve the quantity per unit for the proper management of street trees, it was necessary to review costs in the field. However, due to the absence of data on actual construction costs in the domestic landscape field, detailed items of the US RSMeans Building Construction Cost Data (RSMeans) were reviewed, and the actual construction costs were calculated by applying personal domestic expenses. As a result, the standard of the estimated unit showed a good ratio of 107% for heavy pruning of street tree pruning compared to the actual construction cost, but light pruning was underestimated with a 59% ratio. Shrub pruning was 82%, weeding was 92%, tree fertilization was 87%, and windbreak wall installation was 91% under-engineered. In addition, it was also confirmed that the watering by sprinkler trucks and chemical spraying were over-designed compared to the actual construction cost at the rates of 118% and 124%, respectively. Due to the specificity of the street trees, the increase in personal expenses and the input cost of equipment, such as road safety controls, were judged to be the main cause of the underestimation of items. Therefore, it is necessary to add items related to street trees and general landscape trees to the landscape maintenance items of the standard of the estimated unit.

Estimation of Construction Equipment Production Rates: Focus on Efficiency Rate (건설기계 시공능력 산정에 관한 연구 : 작업효율 중심으로)

  • Park, Hee-Sung;Han, Ye Lyeong;Huh, Youngki;Ahn, Bang Ryul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.1D
    • /
    • pp.67-72
    • /
    • 2008
  • Heavy equipment is a very important factor for successful construction implementation. Also, the cost for heavy equipment is a major part of construction cost. Therefore, the estimation of equipment cost is a critical job in the construction planning phase. A formula for production rates shown in 'Standard Unit Labor' has been used to estimate construction equipment capability per hour and cost. Although the performance of equipment has been improved, the efficiency rates in the formula are not updated lately. Therefore, this research performed several site visits to measure construction equipment working time and then calculates the efficiency rates for hydraulic backhoe, loader, and dump truck. The results show that the measured efficiencies of backhoe and loader are higher than current ones and vice versa for dump truck. This research proposes the needs for a standardized calculation formula and systematic and long-term data collection and measurement for updating efficiency rates for heavy equipment.

Strength development of ground perlite-based geopolymer mortars

  • Celikten, Serhat;Isikdag, Burak
    • Advances in concrete construction
    • /
    • v.9 no.3
    • /
    • pp.227-234
    • /
    • 2020
  • Raw perlite is a volcanic alumino-silicate and is used as aggregate in the construction industry. The high silica and alumina contained in the raw perlite allows the production of geopolymer mortar with the help of alkaline solutions. In this study, different geopolymer mortars are obtained by mixing ground perlite (GP), sodium hydroxide (NaOH), water and CEN standard sand and the strength and microstructure of these mortars are investigated. Mortar specimens are placed in the oven 24 hours after casting and kept at different temperatures and times, then the specimens are cured under laboratory conditions until the day of strength tests. After curing, unit weight, ultrasound pulse velocity, flexural and compressive strengths are determined. Experimental results indicate that the mechanical properties of the mortars enhance with increasing oven-curing period and temperatures as well as increasing NaOH molarity. In addition, SEM/EDS and XRD analyses are performed on the mortar specimens and the results are interpreted.

Estimating Productivity of AL-Form Operation Using Web-CYCLONE System (웹싸이클론을 활용한 알루미늄 폼 공정의 품셈산출)

  • Lee, Dong-Eun;Kim, Yong-Woo;Son, Chang-Baek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.115-122
    • /
    • 2013
  • Construction Standard Productivity Manual (CSPM) has been used for estimating the contract amount of public construction projects. CSPM has been annually either revised and/or newly enacted with high costs. Therefore, This study makes use of CYCLONE, which is a simulation modeling and analysis system specialized in construction operation, to improve the revising and enacting processes of CSPM. This paper presents the CSPM revision module that is an Add-in to Web-CYCLONE. The new module can be effectively used to incorporate the auxiliary tasks and the non-productive tasks into AL-Form operation model. The outputs obtained from the models using he CSPM revision module and from work sampling were compared to verify the usability of the add-in modules. This study verifies that the new module can effectively assist enacting and/or revising CSPM.

Performance Appraisal of the Ceramic Metal Resin Paints for Waterproof and Anti-Corrosion to Improve the Property of Concrete Structure (콘크리트 구조물의 표층부 내구성 증진을 위한 세라믹 메탈계 방수$\cdot$방식재 도료의 성능 평가 연구)

  • Jun Byung-Hun;Kim Jin-Sung;Kang Hyo-Jin;Oh Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.05a
    • /
    • pp.113-117
    • /
    • 2005
  • The ceramic metal resin paints for waterproof and anti corrosion is not long history in development of materials even many actual result. So far, no standard have been given to construction and maintenance method, Quality and property, it is real state that cannot afford to proper quality control in job site or production. This study has been test for the ceramic metal resin paints for water and anti corrosion, as the result, it have proper performance of job site and mechanical performance of compare to other existing. In particular, tensile strength indicates more high about $14.1N/mm^2$ than epoxy resin paints, and in elongation per unit length is more high It is shows having better adhesive strength than epoxy resin paint for crack on the concrete structure. Moreover, The ceramic metal paint for water and corrosion proofing have to have main performance is watertightness and resistance for external impact, chloride ion permeation, drinkable water elution.

  • PDF

A Study on the Characteristics of Recycled Aggregate Concrete According to the Mixing Ratio of Recycled Fine Aggregate at Specific Concrete Strengths (설계기준강도별 순환 잔골재 혼합비율에 따른 순환골재 콘크리트 특성에 관한 연구)

  • Sang-Hyuck, Yoon;Sea-Hyun, Lee
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.10 no.4
    • /
    • pp.367-375
    • /
    • 2022
  • In this study, the characteristics of recycled aggregate concrete according to the mixing ratio of recycled fine aggregate were analyzed by design strength to explore its use in the production of ready-mixed concrete. The results show that, depending on the ratio of recycled aggregate, the compressive strength is similar to that of normal concrete and does not deteriorate. Therefore, it is possible to achieve a strength similar to the target design strength. Furthermore, if the ratio of recycled fine aggregate for concrete is up to 25 % of the total aggregate amount (50 % of the to-tal fine aggregate), slump does not cause problems. Our findings show that the higher the de-sign standard strength, the greater the amount of powder, and management of slump reduction, unit quantity, and performance system is necessary. The obtained results show that recycled ag-gregate can be used for the production of ready-mixed concrete after adjusting its mixing ratio and concrete mix proportions.

Development of an Approximate Cost Estimating Model for River Facility Construction at Planning Stage (이.치수형 하천공사 개략공사비 산정모델 개발)

  • Lee, Si-Wook;Lee, Jeong-Yoon;Park, Sung-Hwan;Choi, Jae-Joon;Woo, Sung-Kwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.95-103
    • /
    • 2009
  • The case of rivers facilities works, expense the standard unit cost for the quality and a rough public corporation expense estimating of the rivers public corporation which is fixed form with the information available which it follows basic design phase absently and possibility of fluctuation. It exists many difficulties in rough public corporation expense estimating. The rivers public corporation expense rough estimating method of existing produces does not exist the amount of material of representative section of the rivers dike and the rough public corporation expense estimating method which is systematic with the method which multiples the seniority (M). The research sees the rough public corporation expense predictive model from the planning stage which is not basic design to consider the quality of the rivers facility public corporation. From this study, it can prevent the waste of national budget from the general public corporation and is more accurate and public corporation expense production possibly.