Abstract
The case of rivers facilities works, expense the standard unit cost for the quality and a rough public corporation expense estimating of the rivers public corporation which is fixed form with the information available which it follows basic design phase absently and possibility of fluctuation. It exists many difficulties in rough public corporation expense estimating. The rivers public corporation expense rough estimating method of existing produces does not exist the amount of material of representative section of the rivers dike and the rough public corporation expense estimating method which is systematic with the method which multiples the seniority (M). The research sees the rough public corporation expense predictive model from the planning stage which is not basic design to consider the quality of the rivers facility public corporation. From this study, it can prevent the waste of national budget from the general public corporation and is more accurate and public corporation expense production possibly.
하천시설공사의 경우, 비정형적인 하천공사의 특성과 개략 공사비 산정을 위한 기준단가의 부재와 기본 설계단계 부재에 따른 가용정보의 부족 및 변동의 가능성 등의 특정으로 개략공사비 산정에 많은 어려움이 존재한다. 기존의 하천공사의 개략공사비 산정은 하천제방의 대표 단면의 물량 산출을 통한 대표 단면 공사비 산정 후, 이에 단순히 연장(m)을곱하는 방식을 적용하고 있다. 본 연구에서는 체계적인 개략공사비 산정 방법론이 존재하지 않는 하천공사의 개략공사비 산정 방법론을 제시하는데 있어, 기본설계가 없는 하천시설물공사의 특성을 고려해 기획단계에서의 개략공사비 산정 모델을 개발하고자 한다. 이를 통해 국가예산이 투입되는 공공공사에서 국가예산의 낭비를 방지하고, 보다 체계적이고 정확한 공사비 산출을 가능하게 하고자 한다.