• 제목/요약/키워드: construction standard production rate

검색결과 30건 처리시간 0.023초

현장시공실태에 따른 방수공사 표준품셈 개정 연구 (Study on Construction-Standard-Production-Rate for Waterproof Work Based on Site Construction Status)

  • 오재훈;태용호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.304-305
    • /
    • 2018
  • Development of waterproof methods and materials resulted in the huge changes in waterproof construction materials. In consequence, the construction-standard-production-rate underwent overall revision in 2018. Especially, from the development of the specification standard and construction methods, the waterproof construction which had lower applicability in the existing construction production rate was revised. The construction methods which did not have applicability were removed. In addition, as there was a material difference based on parts, the constructionstandard-production-rate was revised by distinguishing vertical part and floor. Furthermore, by suggesting more clear work extent, the practicability in creating the standard for calculation of the estimated price in the construction field will increase.

  • PDF

시뮬레이션 기법 기반 공정계획 수립을 위한 데이터베이스 구축 방법론 (Database establishment method for process scheduling by means of simulation)

  • 고용호;노재윤;키앙;신도형;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 봄 학술논문 발표대회
    • /
    • pp.69-70
    • /
    • 2022
  • The domestic process planning generally relies on calculations based on the construction-standard-production-rate. This method requires trial and error practice during the construction phase to deduce the optimized equipment combination for time and cost. Trial and error during construction can lead to cost overruns and schedule delays. Accordingly, this paper suggests an advanced method for establishing a productivity database based on combinations of equipment and also considering site conditions in order to reduce the timely effort for deducing the optimized equipment combination. For this purpose DES (Discrete Event Simulation) model was developed based on the information provided in the construction-standard-production-rate.

  • PDF

이산형 이벤트 시뮬레이션 기반 최적의 건설장비 조합 도출 방법 제시 - 표준품셈 건설기계 시공능력 산식을 기반으로 - (Discrete Event Simulation based Equipment Combination Optimization Method - based on construction equipment performance estimation of the Construction Standard Production Rate -)

  • 고용호;키앙;노재윤;김유진;한승우
    • 한국건설관리학회논문집
    • /
    • 제23권6호
    • /
    • pp.21-29
    • /
    • 2022
  • 건설 프로젝트의 성공적인 수행을 위해 공정 생산성 예측이 필수적으로 요구된다. 특히, 시공 단계 이전에 수행되는 계획의 정확도 및 실효성은 시공 단계의 성과에 큰 영향을 미친다. 기존의 생산성 예측은 표준품셈과 같은 기존 문헌 참고를 통해 수행된다. 그러나 이러한 방법은 변화하는 조건을 즉각적으로 반영하는 것과 공사 수행에 필요한 최적의 장비 조합을 도출하는 것이 어렵다. 본 연구에서는 이산 이벤트 시뮬레이션 기술을 이용하여 장비 조합에 따른 생산성 데이터베이스 구축 방법을 제시하였다. 제시된 방법을 통해 표준품셈 기반 공정 계획 수립을 하는 관리자에게 굴삭기, 로더, 덤프트럭 등으로 수행되는 작업에 대한 최적 시공 계획 수립을 할 수 있을 것이라 예상된다.

공공건설공사 표준시장단가 적용 파급효과 분석 (Ripple Effect Analysis of Construction Standard Unit Price in Public Construction)

  • 김정훈;백승호;이주현
    • 한국산업융합학회 논문집
    • /
    • 제25권6_3호
    • /
    • pp.1207-1219
    • /
    • 2022
  • 「Act On Contracts To Which The State Is A Party」 stipulates that the "Construction Standard Production Rate" and "Construction Standard Unit Price" be used as the criteria for determining the estimated price of construction works performed by public institutions. In this regard, issues such as the application scope of the Construction Standard Unit Price, and the effect of budget reduction continue. However, due to the lack of quantitative data on the actual application of Construction Standard Unit Price, it is difficult to objectively evaluate various issues. In order to prepare data for objective evaluation of the Construction Standard Unit Price, this study analyzed the ripple effect of applying the Construction Standard Unit Price based on the bill of quantity. As a result of the analysis, the Construction Standard Unit Price ripple effect in the civil engineering part was 9.2%, and it was analyzed that there was a ripple effect of about 1.9% based on the civil engineering direct cost. In the construction part, the ripple effect was analyzed to be relatively high at 17%, but it was found to have a ripple effect of about 3% in the construction direct cost. Based on the total direct cost, the ripple effect was calculated as 2.2%. Based on the analysis results, it is possible to evaluate the effect of applying the Standard Market Unit Price, and it is expected to be used as basic data to solve issues. As a future study, it is necessary to additionally analyze the ripple effect by Standard Market Unit Price application range (over 10 billion, over 20 billion won, etc.) and delivery system type (comprehensive evaluation, qualification examination, technical bidding, etc.). In addition, it is necessary to study the appropriate ripple effect of the Standard Market Unit Price.

건설공사 유지보수품셈 사례조사 연구 (Case Study on the Construction Standard Production Rate for Operation and Maintenance Technology)

  • 안방율;박태일
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.250-251
    • /
    • 2019
  • Lots of infrastructures have been newly constructed through the rapid economic growth of 1970's. Since the infrastructures has mostly deteriorated and this circumstance makes the need for maintenance and rehabilitation(M&R) of infrastructures to obtain the convenience and safety of users even more essential. Although markets for M&R project become larger, the construction standards for cost estimation of M&R work are insufficient. Thus, the purpose of this study is to examine the present state of standards for cost estimation of M&R works using case studies. Finally, this work could be utilized as the basis for the development of national standard for estimation of M&R work.

  • PDF

표준품셈 관부설 및 접합공사 품 개정 요인 분석 (Analysis on the Factor of Revision of Pipe Laying Down Material and Connection Work Material)

  • 오재훈;안방율
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.302-303
    • /
    • 2018
  • This study analyzed the major revision factors and revision contents for 'Construction-Standard-Production-Rate for Construction Works in 2018. Part 16. Pipe Laying Down and Connection" which was revised by the construction expense estimation standard's middle and long-term plans. The main reasons for the revision was analyzed to be unclear construction scope, limitations in applicable pipe material based on the facility type, labor force mainly composed of ordinary workers, limitations of labor force, and incomplete appropriation standard for the tool rent fee and equipment expenses. Through revision of factors, common items were newly established, organization was revised, the labor force was mainly composed of the technicians, and basis for appropriation of equipment expenses was arranged. In addition, through periodic revision, the appropriation standard for bend and special pipes was set. Consequently, more practical construction cost estimate standard is arranged through revision.

  • PDF

공동주택 건설공사의 표준품셈과 실투입 노무량 비교 분석 - 미장, 방수, 조적, 타일공사를 중심으로 - (Comparison between Labor Inputs by Quantity per Unit Method and by Actual Data Method in the Apartment Housing Construction Work - Focusing on Masonry Plaster Waterproofing Tile Labors -)

  • 전상훈;구교진
    • 한국건설관리학회논문집
    • /
    • 제16권1호
    • /
    • pp.110-118
    • /
    • 2015
  • 표준품셈은 우리나라 건설공사에 있어 가장 기본적인 요소이지만, 표준품셈이 공동주택 건설공사에서 실제 투입 되는 노무량과 큰 차이를 나타내고 있다. 따라서 실적공사비방식에 의해 공사비를 산정하는 것이 합리적인 대안이 될 수 있으나 원가계산서상에 각종 경비 등에는 정확한 노무량을 파악하여야 비용이 산출될 것이며 공사 진도 관리를 위해 투입 노무량을 정확히 파악할 필요가 있다. 본 연구는 2000년 이후 준공 된 수도권에서 공동주택 건설공사에서 표준품셈과 실투입 노무량을 조사하여 비교한 결과 다음과 같은 결과를 얻을 수 있었다. 실제 투입 노무량은 조적공 1.184인/천매, 미장공 0.048인/$m^2$, 방수공 0.039인/$m^2$, 타일공 0.059인/$m^2$이다. 표준품셈 대비 투입율은 보면 조적공 59.8%, 미장공41.3%, 방수공 31.5%, 타일공 34.3%이다. 방수공의 투입 비율이 가장 낮고 조적공이 비교적 높았다. 따라서 우리나라 공동주택 건설공사의 노무량은 실적공사비를 토대로한 원가계산이 바람직하지만, 공사관리에서 노무량이 주요 변수인 만큼 실제에 근접한 표준품셈을 지속적인 보완이 필요할 것으로 보인다.

Data Collection Methodology of Activity Production Rates for Contract Time Determination

  • 허영기;김창완;송종철
    • 한국건설관리학회논문집
    • /
    • 제5권1호
    • /
    • pp.114-123
    • /
    • 2004
  • Contract time determination for highway construction projects has never been easy despite considerable research efforts from academia as well as industry. High variations in crew production rates are considered one of the main barriers to accurate contract time determination. This paper presents a methodology for collecting field information on crew production rates which will help to enhance the accuracy of contract time determination for highway bridge construction. Based on a standard data collection tool developed, data on field crew production rates was collected from 14 on going projects in Texas, USA, over the past two years. The production rates based on the data collected were considered by industry practitioners to be more realistic and practical than those available to the current practices. As more data becomes available, key drivers influencing production rates could be identified and provide site personnel with a means to better plan and control production in a project specific context.

모듈러 건축용 기계설비 시스템 현황 및 개발에 관한 연구 (Present Condition and Development of Mechanical Utility System for Modular Construction)

  • 이재수;최준석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.19-20
    • /
    • 2016
  • Domestic construction industry has experienced many difficulties as it has been on a downward. It's a way that active modular structure market to solve this problem. However, as Modular structure technical standard in Korea is in the early stages, our modular factory maufactured rate is almost 40% lower than overseas. Besides, there is less design diversity so it just applies for a few buildings like low-rise building and general group barrackes. To deal with these problems, it is essential to modulating the equipment which can improve the production rate. This will help to ensure the quality, shortening of the construction period, the reduction of labor costs. We have defined the name of segmented by each installation location of the equipment to modulating equipment. And it was examined the suitability of the modulating of the location-specific utility system. The results of the analysis are discussed on the page.

  • PDF

혼합 정수 비선형 계획법 기반 토공사 최적 장비 선정 방법 제시 (A Mixed Integer Nonlinear Programming Approach towards Optimal Earthmoving Equipment Selection)

  • 고용호;키앙;이수민;신도형;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.223-224
    • /
    • 2023
  • Optimal fleet management in the planning stage is one of the most critical activities that guarantee successful construction projects. In South Korea, the construction standard production rate database (CSPRD) is normally employed. However, when it comes to a trade-off problem that involves decision-making on optimal sets of equipment to perform a certain task, the method will require the planners' in-depth knowledge and experience regarding the target process and a time consuming estimation of the performance of every possible scenario must be conducted for the deduction of the optimal fleet management. On this account, this research paper proposes a lightweight method of using mixed integer nonlinear programming (MINLP) in multi-objective problems based on CSPRD-based mathematical equations to assist planners in the preplanning stage of choosing the optimal sets of types and size machinery to efficiently arrange the construction scheduling and budgeting.

  • PDF